Pages that link to "NRC-18-0054, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)"
Jump to navigation
Jump to search
The following pages link to NRC-18-0054, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109):
Displayed 50 items.
- ML16231A443 (← links)
- ML16057A759 (← links)
- ML14093A766 (← links)
- ML13317A894 (← links)
- ML13043A655 (← links)
- ML13004A135 (← links)
- ML12341A370 (← links)
- ML12341A369 (← links)
- ML12341A368 (← links)
- ML12341A367 (← links)
- ML12341A366 (← links)
- ML12341A365 (← links)
- ML12341A364 (← links)
- ML12341A363 (← links)
- ML12341A361 (← links)
- ML12341A358 (← links)
- ML120370461 (← links)
- ML113111173 (← links)
- CAC:MF4362 (← links)
- NRC-13-0013, DTE Electric Submittal of Flooding Hazard Reevaluation Report in Response to March 12, 2012 Information Request Regarding Flood Protection Evaluations (← links)
- NRC-13-0004, Fermi 2, Enclosure 9 to NRC-13-0004, NEDO-33578, Rev. 0, Safety Analysis Report for Fermi Generating Station Unit 2 Thermal Power Optimization. (← links)
- NRC-12-0076, Detroit Edison'S Response to March 12, 2012 Information Request Regarding Flood Protection Walkdowns (← links)
- NRC-12-0067, Fermi 2, Submittal of Revision 18 to the Updated Final Safety Analysis Report, 10 CFR 50.59 Evaluation Summary Report, Commitment Management Report and Revision to the Technical Requirements Manual and the Technical Specifications Bases (← links)
- NRC-11-0018, Enrico Fermi Atomic Power Plant, Unit 1 - Fermi 1 Groundwater Site Conceptual Model (← links)
- NRC-11-0036, Enrico Fermi Atomic Power Plant, Unit 1 - License Termination Plan, Revision 4 (← links)
- ML102940178 (← links)
- ML101100463 (← links)
- NRC-09-0080, Impact of Revised Unsaturated Zone Thickness on Fermi 1 Soil Dcgl Values (← links)
- ML092960428 (← links)
- ML091270187 (← links)
- ML081830411 (← links)
- ML081830409 (← links)
- ML072340315 (← links)
- ML062630408 (← links)
- ML061590357 (← links)
- ML17305A038 (← links)
- NRC-14-0043, DTE Electric Company'S Phase 1 Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-1 (← links)
- NRC-18-0022, Submittal of 2017 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report (← links)
- NRC-16-0014, Comments on the Nrc'S Safety Evaluation Report with Open Items Related to the License Renewal (← links)
- NRC-15-0043, Submittal of 2014 Safety Relief Valve Challenge Report, Main Steam Bypass Line Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report (← links)
- NRC-12-0075, TMPE-12-0294, Rev. 0, Seismic Walkdown Report, 10 CFR 50.54(f) Section 2.3 Seismic Response, Appendix D, Page D-212 Through End (← links)
- NRC-18-0054 (redirect page) (← links)
- ML18348B112 (redirect page) (← links)
- ML19183A023 (← links)
- ML20217L633 (← links)
- NRC-18-0054, 2, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) (redirect page) (← links)
- NRC-17-0053, Seismic Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 4, H.4.4 Path 4: GMRS ≪ 2xSSE (← links)
- NRC-17-0052, High Frequency Seismic Confirmation Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (← links)
- NRC-17-0026, Submittal of 2016 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report (← links)
- NRC-16-0026, Submittal of 2015 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report (← links)
- NRC-15-0105, Phase 1 and Phase 2 Overall Integrated Plan for Implementation of Order EA-13-109, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (← links)
- NRC-15-0085, Submittal of 10 CFR 71.95 Report on the 8-120B Shipping Cask (← links)