Pages that link to "NRC 2021-0001, Report of Changes to Emergency Plan"
Jump to navigation
Jump to search
The following pages link to NRC 2021-0001, Report of Changes to Emergency Plan:
Displayed 50 items.
- ML16125A525 (← links)
- ML14342A150 (← links)
- NRC 2018-0040, NextEra Energy Point Beach, LLC, Exemption Request to Support Updated Final Response to NRC Generic Letter 2004-02 (← links)
- NRC 2018-0014, NextEra Energy Point Beach, LLC, Construction Truss License Amendment Request 278, Response to Request for Additional Information (← links)
- NRC 2017-0011, 2017 Point Beach Nuclear Plant Initial License Examination Letter Submitting Examination (← links)
- NRC 2014-0021, Reactor Vessel Internals Inspection Plan Response to Request for Addtional Information (← links)
- NRC 2013-0099, NextEra Energy Point Beach, LLC, Readiness for 95002 Supplemental Inspection (← links)
- NRC 2013-0098, NextEra Energy Point Beach, LLC Response Regarding Implementation of Multi-Unit Dose Assessment Capability (← links)
- NRC 2013-0088, NextEra Energy Point Beach, LLC Preliminary Schedule for GSI-191 Resolution (← links)
- NRC 2013-0057, Filing of Owner'S Lnservice Inspection Summary Report IWE Class Mc and Iwl Class CC for Point Beach Nuclear Plant Refueling Outage U1 R34 (← links)
- NRC 2012-0085, 2012 Point Beach Nuclear Plant Initial License Examination 45 Day Submittal Letter NRC 2012-0085 (← links)
- NRC 2012-0054, Commitment Change for the NextEra Energy Point Beach, LLC Generic Letter 2004-02 Plan for Resolution (← links)
- NRC 2012-0028, 2011 Annual Monitoring Report, for the Period January 1 Through December 31, 2011 (← links)
- NRC 2012-0019, Filing of Owner'S Class 1, 2, and 3 Inservice Inspection Summary Report for Point Beach Nuclear Plant Refueling Outage U1R33 (← links)
- NRC 2012-0001, NextEra Energy Point Beach, LLC (NextEra) - Proposed Execution of a New Computer Access Agreement/Letter (← links)
- NRC 2011-0039, Redacted - Point Beach, Units 1 and 2, Submittal of 2010 Annual Monitoring Report (← links)
- NRC 2011-0066, License Amendment Request 254, Removal of the Table of Contents from Technical Specifications (← links)
- NRC 2011-0045, Point Beach Nuclear Plant, Units 1 and 2 - 2010 Annual Fatigue Results Supplemental Response (← links)
- NRC 2010-0154, License Amendment Request 261 - Extended Power Uprate - Response to Request for Additional Information (← links)
- NRC 2010-0102, Point Beach, Units 1 & 2 - License Amendment Request 265, Revision to Reactor Vessel Head Drop Methodology, Supplement 1 (← links)
- NRC 2010-0029, Point Beach, Units 1 & 2, Submittal of Fitness for Duty Performance Data for Period Ending December 31, 2009 (← links)
- NRC 2009-0121, Point Beach, Units 1 and 2, Transmittal of Information to Support License Amendment Request 241 Pbnp Vnpab and CREFS Seismic Evaluation (← links)
- NRC 2009-0106, Transmittal of License Amendment Request 263 Regarding Changes to Cyber Security Plan (← links)
- NRC 2009-0096, Point Beach, Unit 1 - Response to Request for Additional Information Re Fall 2008 Unit 1 (U1R31) Steam Generator Tube Inspection Report (← links)
- NRC 2009-0022, 2009 Point Beach Nuclear Plant Initial Examination Proposed Exam Files (← links)
- NRC 2009-0082, Point Beach, Units 1 and 2 - Transmittal of Background Information to Support License Amendment Request 261, ATC Lnterim Operation and Impacts Re-Study (← links)
- NRC 2009-0057, Response to Request for Additional Information License Amendment Request 247 Spent Fuel Pool Storage Criticality Control (← links)
- NRC 2009-0044, Point Beach, Units 1 and 2 - Transmittal of Background Information to Support License Amendment Request 261 Interconnection System Impact Study (← links)
- NRC 2008-0085, Point Beach, Units 1 & 2, Transmittal of ARCON96 and Radtrad Cds Supporting Alternative Source Term License Amendment Request 241 (← links)
- NRC 2008-0081, Point Beach, Unit 1, Cycle 32 (U1C32) Core Operating Limits Report. (← links)
- NRC 2008-0044, Point Beach, Units 1 & 2, License Amendment Request No. 247, Transmittal of Changes to Technical Specifications Spent Fuel Pool Storage Criticality Control (← links)
- NRC 2008-0052, Revision to Notice of Intent to Pursue Extended Power Uprates (← links)
- NRC 2008-0038, Supplemental Response to Generic Letter 2004-02, Potential Lmpact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (← links)
- NRC 2008-0028, Point Beach, Units 1 & 2, Confirmatory Action Letter CAL 3-04-001 Regulatory Commitment Chanqe - OR-01-004 (← links)
- NRC 2008-0013, Supplemental Response to Generic Letter 2004-02, Potential Lmpact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (← links)
- NRC 2017-0041, to License Amendment Request 286, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors (← links)
- NRC 2007-0070, Fitness-For-Duty (FFD) Program Performance Data for Point Beach for January Through June 2007 (← links)
- NRC 2007-0009, Filing of Owner'S Inservice Inspection Summary Report for Point Beach Nuclear Plant Refueling Outage U2R28 (← links)
- NRC 2006-0046, Nuclear Management Company - Point Beach Nuclear Power Plant Units 1 & 2 CAL 3-04-001, Revision 1 Engineering Design Control Commitment Status Update (← links)
- NRC 2006-0069, NMC-Point Beach, Units 1 & 2 Corrective Action Program Commitment Status Update (← links)
- NRC 2006-0038, Supplemental Response to Generic Letters (GL) 98-04 and GL 2004-02 Licensee Event Report 266/301/2005-006-00 (← links)
- NRC 2006-0019, Filing of Owner'S Inservice Inspection Summary Report for Point Beach Nuclear Plant Refueling Outage U1R29 (← links)
- NRC 2018-0028, NextEra Energy Point Beach, LLC (NextEra) - License Amendment Request 290, Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements (← links)
- NRC 2014-0024, NextEra Energy Point Beach, LLC - Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the F (← links)
- NRC 2014-0006, NextEra Energy Point Beach, LLC Supplement to Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Seismic Aspects of Recommendation 2.1 of the Near Term Task Force Review of Insights from the Fukushima Dai-ich (← links)
- NRC 2013-0087, NextEra Energy Point Beach, Llc'S Request for Schedule Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (← links)
- NRC 2013-0078, NextEra Energy Point Beach, Llc'S First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Numb (← links)
- NRC 2012-0101, NextEra Energy Point Beach, LLC Response to 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Seismic (← links)
- NRC 2012-0092, NextEra Energy Point Beach, Llc'S Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12 (← links)
- NRC 2012-0093, NextEra Energy Point Beach, Llc'S Initial Status Report in Response to 03/12/2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (← links)