Pages that link to "ML16095A285"
Jump to navigation
Jump to search
The following pages link to ML16095A285:
Displayed 50 items.
- ML17237A010 (← links)
- ML17026A011 (← links)
- ML17027A038 (← links)
- ML17125A321 (← links)
- ML16230A613 (← links)
- ML16229A279 (← links)
- ML16145A225 (← links)
- ML16133A452 (← links)
- ML16076A120 (← links)
- ML16104A055 (← links)
- ML14164A063 (← links)
- ML14164A062 (← links)
- ML12122A986 (← links)
- CAC:MF7290 (← links)
- CAC:MF7559 (← links)
- ML18053A182 (← links)
- ML18053A171 (← links)
- ML18053A170 (← links)
- RS-16-228, Clinton Power Station License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition (← links)
- RS-16-143, Clinton - License Amendment Request - Proposed Changes to the Emergency Plan for Permanently Defueled Condition (← links)
- RA-14-032, Clinton, Unit 1, Attachment 4, Discussion of Revision to the Radiological Emergency Plan Annex, EP-AA-1003, NEI 99-01, Rev. 6, Development of Emergency Action Levels for Non-Passive Reactors, Enclosure 4B and 4C, Cl 3-74 - Cl 3-151 (← links)
- RA-14-032, Clinton, Unit 1, Attachment 4, Discussion of Revision to the Radiological Emergency Plan Annex, EP-AA-1003, NEI 99-01, Rev. 6, Development of Emergency Action Levels for Non-Passive Reactors, Enclosure 4A and 4B, Cover - Cl 3-73 (← links)
- ML16238A250 (← links)
- NEI 99-01, Clinton, Unit 1, Attachment 4, Discussion of Revision to the Radiological Emergency Plan Annex, EP-AA-1003, NEI 99-01, Rev. 6, Development of Emergency Action Levels for Non-Passive Reactors, Enclosure 4B and 4C, Cl 3-74 - Cl 3-151 (← links)
- NEI 99-01, Clinton, Unit 1, Attachment 4, Discussion of Revision to the Radiological Emergency Plan Annex, EP-AA-1003, NEI 99-01, Rev. 6, Development of Emergency Action Levels for Non-Passive Reactors, Enclosure 4A and 4B, Cover - Cl 3-73 (← links)
- ML063040295 (← links)
- RS-18-116, Application to Revise Technical Specifications to Adopt TSTF-476, Improved BPWS Control Rod Insertion Process (NEDO-33091), Revision 1 (← links)
- RS-18-105, License Amendment Request to Recapture Low-Power Testing Time (← links)
- RS-18-005, License Amendment Request to Incorporate Revised Alternative Source Term Dose Calculation (← links)
- RS-17-076, License Amendment Request to Revise Spent Fuel Pool Level (← links)
- RS-17-079, Response to Request for Additional Information Regarding the Permanent Extension of Leak Rate Testing (← links)
- RS-17-017, License Amendment Request to Clarify RHR Subsystem Operability Requirements During Decay Heat Removal Operations (← links)
- RS-17-020, Response to RAI Concerning License Amendment Request to Revise Technical Specification Section 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (← links)
- RS-16-251, Request to Resume Review of Licensing Actions (← links)
- RS-16-208, Response to NRC Acknowledgement of Suspension Request for Licensing Actions (← links)
- RS-16-161, Request for NRC to Suspend Review of License Amendment Requests (← links)
- RS-16-075, Supplemental Information Regarding License Amendment Request to Revise Technical Specification Section 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test. (← links)
- RS-11-117, License Amendment Request to Modify Technical Specifications Section 3.8.1, AC Sources - Operating. (← links)
- RS-11-073, License Amendment Request to Modify Technical Specifications Section 3.1.2, Reactivity Anomalies. (← links)
- RS-10-050, License Amendment Request to Remove Operating Mode Restrictions for Performing Division 3 AC Sources Surveillance Testing (← links)
- RS-10-148, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (← links)
- RS-10-131, License Amendment Request to Revise Technical Specifications Limiting Condition for Operation 3.7.6, Main Turbine Bypass System (← links)
- RS-10-039, License Amendment Request to Administratively Revise Technical Specifications (← links)
- RS-10-008, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) (← links)
- RS-09-074, License Amendment Request to Modify Clinton Power Station Facility Operating License in Support of the Use of Isotope Test Assemblies (← links)
- RS-09-079, Request for Amendment to Technical Specifications Section 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation, to Eliminate Requirements for Main Steam Line Isolation on High Turbine Building Temperature (← links)
- RS-09-042, Request for Amendment to Technical Specifications Section 5.5.6, Inservice Testing Program to Incorporate Previously NRC-Approved Generic TS Changes (← links)
- RS-09-014, License Amendment Request to Modify Facility Operating License in Support of Bulk Isotope Generation Project (← links)
- RS-07-133, Application for Technical Specification Change TSTF-374, Revision to TS 5.5.9 for Diesel Fuel Oil Using Consolidated Line Item Improvement Process (← links)
- RS-07-074, Application for Technical Specification Change TSTF-423, Risk Informed Modification to Selected Required Action End States for BWR Plants, Using the Consolidated Line Item Improvement Process (← links)