Pages that link to "LIC-16-0109, Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E (Attachments 1, 2, 4, 5 and 6)"
Jump to navigation
Jump to search
The following pages link to LIC-16-0109, Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E (Attachments 1, 2, 4, 5 and 6):
Displayed 32 items.
- ML17041A443 (← links)
- ML17041A444 (← links)
- ML16356A578 (redirect page) (← links)
- ML17041A238 (← links)
- ML17037D162 (← links)
- ML17081A019 (← links)
- ML17082A002 (← links)
- ML17039A655 (← links)
- ML17090A381 (← links)
- ML17278A178 (← links)
- ML17276B286 (← links)
- ML17275A264 (← links)
- ML17263B198 (← links)
- ML17263B191 (← links)
- ML17261A419 (← links)
- ML17261A343 (← links)
- ML18031A057 (← links)
- ML18031A060 (← links)
- ML18025A402 (← links)
- LIC-17-0052, License Amendment Request 17-04; Modification of License Condition 3.C to Delete Requirement for a Commission-Approved Cyber Security Plan (← links)
- LIC-17-0047, Final Request for Additional Information Concerning License Amendment Request 16-07: Revise the Emergency Plan to the Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme (← links)
- LIC-17-0039, Request for Exemption from 10 CFR 50.54(w)(1), Concerning On-Site Property Damage Insurance (← links)
- LIC-17-0038, Request for Exemption from 10 CFR 140.11(a)(4), Concerning Primary and Secondary Liability Insurance (← links)
- LIC-17-0045, Response to Request for Additional Information Defueled Emergency Plan Exemption Request (← links)
- LIC-17-0016, License Amendment Request 17-02; Request Extension for Milestone 8 of Cyber Security Plan Implementation Schedule (← links)
- LIC-17-0037, Response to Request for Additional Information, Fort Calhoun Station, Unit No.1 - Final Request for Additional Information Concerning Exemption from the Requirements of 10 CFR 50.47 and Appendix E (← links)
- NRC-2017-0223, FRN, Exemption from 10 CFR 50.47 and 10 CFR 50 Appendix E to Reduce Emergency Planning Requirements for Permanently Defueled Condition (CAC MF9067; EPID L-2016-LLE-0003) (← links)
- LIC-18-0018, Independent Spent Fuel Storage Installation - Emergency Plan Update (← links)
- ML19346D683 (← links)
- ML17289A060 (← links)
- ML15294A279 (← links)
- CAC:MF9559 (← links)
- CAC:MF5854 (← links)
- ML18106A038 (← links)
- ML081070326 (← links)
- ML081070325 (← links)
- LIC-08-0037, Calculation FC05694, Calculation of Minimum Reactor Coolant Time Using Shutdown Cooling System, Attachment 2, Pages 91 Through End (← links)
- LIC-08-0037, Calculation FC05694, Calculation of Minimum Reactor Coolant Time Using Shutdown Cooling System, Attachment 2, Pages 51 Through 90 (← links)
- LIC-08-0037, Calculation FC05694, Calculation of Minimum Reactor Coolant Time Using Shutdown Cooling System. (← links)
- LIC-18-0015, CH-ODCM-0001, Revision 27, Off-Site Dose Calculation Manual. (← links)
- LIC-18-0015, CH-ODCM-0001, Revision 26, Off-Site Dose Calculation Manual. (← links)
- LIC-16-0109, Fort Calhoun Station Unit 1 - Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E (Attachments 1, 2, 4, 5 and 6) (redirect page) (← links)
- LIC-16-0109 (redirect page) (← links)
- LIC-16-0044, Calculation FC08499 Evaluation of FCS Concrete Compressive Strength Test Data (← links)
- ML061640242 (← links)
- ML061640241 (← links)
- ML061640239 (← links)
- LIC-17-0024, Supplemental Information Needed for Acceptance of Requested Licensing Action Fort Calhoun Station Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E (CAC No. MF9067). (Non-Proprietary)(Part 4 of 4) (← links)
- LIC-17-0052, License Amendment Request 17-04; Modification of License Condition 3.C to Delete Requirement for a Commission-Approved Cyber Security Plan (← links)
- LIC-08-0067, Response to Request for Additional Information Relief Request for Valve Replacement and Supplemental Information (← links)
- LIC-05-0048, Additional Information for Relaxation Request for First Revised Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors (← links)
- ML041190195 (← links)
- LIC-03-0166, Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate (← links)
- LIC-03-0067, Amendment Request for License DPR-40 Measurement Uncertainty Recapture Power Uprate (← links)
- ML030990673 (← links)
- ML030990665 (← links)
- ML030990652 (← links)
- ML21271A199 (← links)