Pages that link to "L-22-047, Unit No.1 - Core Operating Limits Report, Cycle 23, Revision O and Revision 1"
Jump to navigation
Jump to search
The following pages link to L-22-047, Unit No.1 - Core Operating Limits Report, Cycle 23, Revision O and Revision 1:
Displayed 50 items.
- ML061150273 (← links)
- L-15-166, Supplemental Information for the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, Reactor Vessel Internals Inspection Plan (TAC No. ME4640) and License Renewal Application Amendment No. 56 (← links)
- L-15-120, Notification of Completion of License Renewal Commitments Related to the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application and License Renewal Application Amendment No. 55 (← links)
- L-15-034, Water Withdrawal Report for the Davis-Besse Nuclear Power Station, Unit 1, for 2014 (← links)
- L-14-297, Reply to Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application (TAC No. ME4640) and License Renewal Application Amendment No. 53 (← links)
- L-13-180, Supplemental Reply to Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application (TAC No. ME4640) and License Renewal Application Amendment 42 (← links)
- L-12-335, Supplemental Reply to Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application (TAC No. ME4640) and License Renewal Application Amendment No. 34 (← links)
- L-12-315, Supplemental Reply to Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application (TAC ME4640) and License Renewal Application Amendment No. 32 (← links)
- L-12-284, Reply to Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application (TAC ME4640) and License Renewal Application Amendment No. 31 (← links)
- L-12-243, Reply to Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application (TAC No. ME4640) and License Renewal Application Amendment No. 28 (← links)
- L-11-301, Ltr 11/7/2011 from FENOC to M. Satorius Davis-Besse Completion of Actions Required by Confirmatory Action Letter 3-10-001 (← links)
- L-11-359, Response to Request for Additional Information on 10 CFR 50-355a Request RR-A35, Proposed Alternative to System Leakage Test Requirements (← links)
- L-11-353, Documentation of Commitments for the Davis-Besse Nuclear Power Station, Unit 1 (← links)
- L-11-307, Ltr 10/19/11 Davis-Besse Re Experience Requirement Waiver Request for Licensed Operator Applicant (← links)
- L-11-292, Reply to Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application (TAC No. ME4640). License Renewal Application Amendment No. 19, and Revised License Renewal Applica (← links)
- L-11-218, Reply to Requests for Additional Information for the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application and License Renewal Application Amendment No. 12 (← links)
- L-10-263, Notification Letter Designating Davis-Besse Nuclear Power Station Balance of Plant Systems within the Cyber Security Rule Scope (← links)
- L-02-002, G20100238/EDATS: OEDO-2010-0305 - Ltr. Tom Gurdziel, 2.206 - Firstenergy - Davis-Besse (← links)
- L-09-033, FENOC, EA-03-214, Completion of Actions Required by Confirmatory Order for Davis-Besse Power Station (← links)
- L-08-193, Firstenergy Nuclear Operating Company - Davis Besse Letter to J. Caldwell Re Submittal of Organization Safety Culture and Safety Conscious Work Environment Independent Assessment Plan (← links)
- L-08-040, Letter to J. Caldwell Dated 02/12/2008 Regarding Submittal of the Operations Performance Independent Assessment Plan for the Davis-Besse Nuclear Power Station - Year 2008 (← links)
- L-08-005, Submittal of the 2007 Organizational Safety Culture and Safety Conscious Work Environment Independent Assessment Report for Davis-Besse (← links)
- L-18-189, Readiness for Nrg Supplemental Inspection Required for a White Finding (← links)
- L-18-198, Submittal of Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report (← links)
- L-18-090, Occupational Radiation Exposure Report Tot Year 2017 (← links)
- L-18-035, Report of Facility Changes, Tests, and Experiments (← links)
- L-18-108, Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformance Identified in Response to Regulatory Issue Summary 2015-06, Tornado Missile.... (← links)
- L-18-015, Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (Revision 22) (← links)
- L-18-014, Submittal of Cyber Security Plan, Revision 1 (← links)
- L-17-297, Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (Revision 21) (← links)
- L-17-270, Notification of Emergency Core Cooling System (ECCS) Evaluation Model Change Pursuant to 10 CFR 50.46 (← links)
- L-17-041, Submittal of 2016 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models (← links)
- L-17-248, Spent Fuel Storage Casks Registration (← links)
- L-17-203, Use of Encryption Software for Electronic Transmission of Safeguards Information (← links)
- L-17-231, Spent Fuel Storage Casks Registration (← links)
- L-17-170, Submittal of 2017 Emergency Preparedness Evaluated Exercise Manual (← links)
- L-17-158, Reply to Request for Additional Information Re License Renewal Commitment No. 42 (← links)
- L-17-161, Response to Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations (← links)
- L-17-061, Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (Revision 20) - Cover Letter Only (← links)
- L-17-066, Readiness for NRC Supplemental Inspection Required for a White Performance Indicator (← links)
- L-17-070, Reply to Request for Additional Information Related to License Renewal Commitment (← links)
- L-16-371, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 805 (← links)
- L-16-347, Action for Confirmatory Order EA-16-022 (← links)
- L-16-291, Response to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (← links)
- L-16-288, Submittal of Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report (← links)
- L-16-097, 2015 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models (← links)
- L-16-195, Steam Generator Tube Circumferential Crack Report - Spring 2016 Refueling Outage (← links)
- L-16-253, Cycle 19 and Refueling Outage 19 Inservice Inspection Summary Report (← links)
- L-16-229, Submittal of Pressure and Temperature Limits Report, Revision 3 (← links)
- L-16-216, Representative for Alternative Dispute Resolution in Regards to Apparent Violation EA-16-022 (← links)