Pages that link to "L-11-001, Submittal of 30-Day Response to NRC Bulletin 2011-01, Mitigating Strategies."
Jump to navigation
Jump to search
The following pages link to L-11-001, Submittal of 30-Day Response to NRC Bulletin 2011-01, Mitigating Strategies.:
Displayed 43 items.
- ML15280A085 (← links)
- ML15268A564 (redirect page) (← links)
- ML15280A085 (← links)
- ML20322A160 (← links)
- ML15229A195 (← links)
- TAC:MF6767 (← links)
- L-11-001 (redirect page) (← links)
- ML110470404 (← links)
- CNL-15-097, Flood Hazard Reevaluation Report for Watts Bar Plant, Response to NRC Request for Information Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (← links)
- CNL-15-043, Flood Hazard Reevaluation Report for Watts Bar, Response to NRC Request for Information Per Title 10 of CFR 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Acc (← links)
- CNL-14-098, Request to Revise the Watts Bar Nuclear Plant Unit 2 Cyber Security Milestone Implementation Schedule and Implementation License Conditions (← links)
- L-18-001, Notification of Readiness for NRC Inspection Procedure 95001 Inspection (← links)
- L-04-001, Completion of Action Required in Response to NRC Bulletin 2004-01: Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors (← links)
- CNL-15-046, Submittal of Revision 106X to Appendix C of the Radiological Emergency Plan (← links)
- L-11-011, Transmittal of Response to NRC Bulletin 2011-01, Mitigating Strategies. (← links)
- CNL-15-049, Cyber Security Plan Implementation Milestones 1 Through 7 Status and Proposed License Condition (← links)
- CNL-14-203, Response to Request for Additional Information on EP Chapter 13.3 and Staffing Analysis (← links)
- L-11-001, Closeout of NRC Bulletin 2011-01, Mitigating Strategies (redirect page) (← links)
- L-88-017, Response Clarification to Generic Letter 88-017 (← links)
- L-19-008, American Society of Mechanical Engineers, Section Xl, Third 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 15 Operation (← links)
- L-19-019, Transmittal of 10 CFR 50.46 - 30-Day and Annual Report for Watts Bar Nuclear Plant, Units 1 and 2 (← links)
- L-19-023, Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual (← links)
- CNL-14-212, Expedited Seismic Evaluation Process Report (CEUS Sites) Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident (← links)
- L-19-011, Plant, Unit 1 - Revision 1 of the Cycle 16 Core Operating Limits Report (COLR) (← links)
- L-11-001, Response to Requests for Additional Information Regarding Ons'S 60-Day Response to Bulletin 2011-01 (redirect page) (← links)
- ML12052A006 (redirect page) (← links)
- ML12193A492 (← links)
- ML20304A369 (← links)
- ML12052A006 (redirect page) (← links)
- L-19-015, Annual Non-Radiological Environmental Operating Report - 2018 (← links)
- L-19-024, Unit 2 - Emergency Plan Implementing Procedures Revision (← links)
- L-19-029, Submittal of Revision 0 of Cycle 3 Core Operating Limits Report (← links)
- L-19-016, Annual Radiological Environmental Operating Report - 2018 (← links)
- L-19-031, Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2019-02 - Preparation and Scheduling of Operator Licensing Examinations (← links)
- L-11-001, Day Response to NRC Bulletin 2011-01 (redirect page) (← links)
- ML11227A283 (redirect page) (← links)
- ML12179A210 (← links)
- ML21270A217 (← links)
- ML11227A283 (redirect page) (← links)
- L-19-036, Notification of Readiness for NRC Inspection Procedure 95001 Inspection (← links)
- L-19-034, Wafts Bar Nuclear Plant, Unit 1 - Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report (← links)
- L-19-044, Unit 2 - Forward Emergency Plan Implementing Procedure Revisions (← links)
- L-19-026, Revised Pressure and Temperature Limits Report (PTLR) (← links)
- L-19-045, American Society of Mechanical Engineers, Section XI, First 10-Year Inspection Interval, Inservice Inspection Owner'S Activity Report for Cycle 2 Operation (← links)
- L-19-048, Response to Apparent Violation in NRC Inspection Report 05000390/2019013 and 05000391/2019013, EA-19-042 (← links)
- L-19-041, Cycle 2 Steam Generator Tube Inspection Report (← links)
- L-19-046, Notification of Readiness for NRC Independent Review to Confirm Chilling Effect Letter and Cross-Cutting Issue Closure Criteria Have Been Met (← links)
- L-19-052, Revision 47 to Emergency Plan Implementing Procedure EPIP 12, Emergency Equipment and Supplies (← links)
- L-19-054, Unit 2 - Emergency Plan Implementing Procedure Revision (← links)
- L-19-058, Statement of Payment of Civil Penalty (← links)
- L-12-001, Revised Response to NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System (← links)
- L-19-061, Unit 2 - Emergency Plan Implementing Procedure Revision (← links)
- L-20-006, Unit 2, Emergency Plan Implementing Procedure Revision (← links)
- L-03-004, Tennessee Valley Authority Response to Nuclear Regulatory Commission Bulletin 2003-04, Rebaselining of Data in the Nuclear Materials Management and Safeguards System, Dated October 8, 2003 (← links)