Pages that link to "JAFP-89-0214, Responds to NRC Insp Rept 50-330/88-29 Re Monitoring of Pneumatic Supply Pressure to Safety Relief Valves & Issue Concerning Deficiencies in Tech Specs for LPCI Sys. Corrective Actions:Operating Procedure Will Be Updated"
Jump to navigation
Jump to search
The following pages link to JAFP-89-0214, Responds to NRC Insp Rept 50-330/88-29 Re Monitoring of Pneumatic Supply Pressure to Safety Relief Valves & Issue Concerning Deficiencies in Tech Specs for LPCI Sys. Corrective Actions:Operating Procedure Will Be Updated:
Displayed 2 items.
- ML20247C454 (redirect page) (← links)
- JAFP-89-0214 (redirect page) (← links)
- ML20247R746 (← links)
- JPN-89-033, Forwards Application for Amend to License DPR-59,revising Tech Spec Table 3.7-1, Process Pipeline Penetrating Primary Containment, to Accurately Reflect as-built Condition of Plant & Promote Consistency W/Nrc STS (← links)
- JPN-89-034, Forwards Application for Amend to License DPR-59,revising Tech Spec to Reflect LPCI loop-selection-logic Mod & to Eliminate Redundant & Unnecessary Surveillance Testing by Making Terminology Used Consistent W/Existing Criteria (← links)
- JPN-89-037, Forwards Application for Amend to License DPR-59,revising Tech Specs to Clarify That 30-day Allowable out-of-svc Time Applies to RHR Svc Water Sys Only & Not to RHR Pumps or Spray Loop (← links)
- JPN-89-038, Forwards Application for Amend to License DPR-59,revising Tech Spec Table 4.7-2 Re Exceptions to Type C Leak Rate Tests to Accurately Reflect as-built Configuration of Plant (← links)
- JPN-89-030, Forwards Application for Amend to License DPR-59,revising Tech Specs Re Clarification of Containment Drywell Sump Flow Integrator (← links)
- JPN-89-025, Forwards Application for Amend to License DPR-59,revising Tech Spec Tables 4.1-1,4.1-2 & 4.2-1 to Correct Typos (← links)
- JPN-89-028, Forwards Application for Amend to License DPR-59,revising Tech Spec 4.11.E.3, Intake Deicing Heaters to Increase Frequency of Resistance to Ground Surveillance Requirement to Once Per Yr (← links)
- JPN-89-029, Forwards Application for Amend to Tech Specs Revising Tech Spec 4.7.A.3, Continuous Leak Rate Monitoring, to Remove Misleading Ref to Continuous Leak Rate Monitoring Sys (← links)
- JAFP-89-0214, Responds to NRC Insp Rept 50-330/88-29 Re Monitoring of Pneumatic Supply Pressure to Safety Relief Valves & Issue Concerning Deficiencies in Tech Specs for LPCI Sys. Corrective Actions:Operating Procedure Will Be Updated (← links)
- JPN-89-041, Forwards Application for Amend to License DPR-59,revising Tech Spec Table 3.2-6, Surveillance Instrumentation to Correct Total Number of Reactor Pressure Channels (← links)
- JPN-89-040, Forwards Application for Amend to License DPR-59,revising Tech Specs to Update Suppresssion Chamber Water Temp Instrumentation to Reflect Mods Installed to Meet Reg Guide 1.97 (← links)