Pages that link to "JAFP-05-0013, Inservice Inspection Summary Report 2004 Refuel Outage (Reload 16/Cycle 17)"
Jump to navigation
Jump to search
The following pages link to JAFP-05-0013, Inservice Inspection Summary Report 2004 Refuel Outage (Reload 16/Cycle 17):
Displayed 34 items.
- JAFP-07-0020, Submittal of James A. Fitzpatrick - Inservice Inspection Summary Report 2006 Refuel Outage (Reload 17/Cycle 18) (← links)
- JAFP-07-0050, Proposed Relief Requests for the James A. FitzPatrick Power Plant Fourth Interval In-Service Testing Program (← links)
- JAFP-19-0004, Inservice Inspection Summary Report Cycle 23 (← links)
- JAFP-18-0113, Fifth Ten-Year Lnservice Inspection Interval Program Plan (← links)
- JAFP-18-0078, Fifth Ten-Year Interval Inservice Testing Program Plan (← links)
- JAFP-17-0057, Inservice Inspection Summary Report 2017 Refuel Outage 22 (← links)
- JAFP-16-0136, Alternative Examination Requirements Nozzle-to-Vessel Welds and Nozzle Inner Radii Using ASME Code Case N-702 and BWRVIP-241 (← links)
- JAFP-14-0012, Inservice Testing Program 10 CFR 50.55a Request PRR-05 (← links)
- JAFP-13-0004, Inservice Inspection Summary Report 2012 Refuel Outage (Reload 20/Cycle 21) (← links)
- JAFP-11-0009, Inservice Inspection Summary Report 2010 Refuel Outage (Reload 19/Cycle 20) (← links)
- JAFP-09-0088, Proposed Relief Request VRR-06 for the Fourth Interval In-Service Testing Program (← links)
- JAFP-09-0008, Response to Request for Additional Information Regarding: Request for Additional Information Third Ten-Year Inservice Inspection Interval Program Plan Relief Request RR-CRV-01 (← links)
- JAFP-09-0004, Inservice Inspection Summary Report 2008 Refuel Outage (Reload 18/Cycle 19) (← links)
- JAFP-08-0109, Submittal of the Final Ultrasonic Test Results on the N2C-SE Weld Overlay (← links)
- JAFP-08-0038, Inservice Inspection Program Relief Requests Third Ten-year Interval Closeout (← links)
- JAFP-07-0116, Fourth Interval Inservice Testing Program for Pumps and Valves (← links)
- JAFP-07-0107, Response to Request for Additional Information Regarding Proposed Relief Request PRR-01 for the Fourth Interval In-Service Testing Program (← links)
- JAFP-07-0030, Fourth Inservice Inspection Interval Inspection Program Plan (← links)
- JAFP-05-0151, Request for Approval of Relief Request No. RR-39, Implementation of BWRVIP Guidelines in Lieu of ASME Section XI Code Requirements on Reactor Vessel Internals and Components Inspection (← links)
- ML051580203 (← links)
- TAC:MC0293 (← links)
- JAFP-05-0013 (redirect page) (← links)
- ML050270514 (redirect page) (← links)
- ML042220024 (← links)
- ML042030157 (← links)
- JAFP-03-0179, Proposed Alternatives in Accordance with 10CFR50.55a(g)(6)(ii)(A)(5) and Relief from ASME Section XI Code Regarding Inspection of RPV Vertical Shell Welds, Per 10CFR50.55a(g)(6)(i) (← links)
- JAFP-03-0096, James a FitzPatrick Nuclear Power Plant, Proposed Relief Request No. VRR-08 to In-Service Testing Program (← links)
- JAFP-02-0251, In-Vessel Visual Inspection Summary Report 2002 Refuel Outage (Reload 15/Cycle 16) (← links)
- JPN-02-026, Relief Request RR-28, Revision 3 for Third 10-Year Inservice Inspection Interval Program Plan (← links)
- JPN-02-022, License DPR-59, Relief Request RR-28, Revision 2 for the Third 10-Year Inservice Inspection Interval Program Plan (← links)
- JPN-02-001, Submittal of James A. FitzPatrick Owner'S Activity Report, JAF-RPT-MULTI-04331, Rev. 0 Which Contains Inservice Inspection Results & Repair/Replacement Activities Performed During 1st Period of Third 10-Year ISI Interval (← links)
- JAFP-20-0087, Inservice Inspection Summary Report Cycle 24 (← links)
- JAFP-22-0053, Inservice Inspection Summary Report Cycle 25 (← links)
- JAFP-23-0008, Supplement to Inservice Inspection Summary Report Cycle 25 (← links)