Pages that link to "GNRO-2020/00034, Notification of Spent Fuel Cask Use"
Jump to navigation
Jump to search
The following pages link to GNRO-2020/00034, Notification of Spent Fuel Cask Use:
Displayed 50 items.
- GNRO-2018/00011, Formal Request for Review and Approval of Grand Gulf Nuclear Station'S Steam Dryer'S Long-term Inspection Plan and Baseline Results (← links)
- GNRO-2017/00055, Revised Grand Gulf Nuclear Station (GGNS) Annual Radioactive Effluent Release Report (ARERR) for 2016 (← links)
- GNRO-2016/00054, Additional Clarification of the Grand Gulf Nuclear Station Containment Leak Rate Program Description (← links)
- GNRO-2016/00042, NRC Form 536 Response to Regulatory Issue Summary 2016-09, Grand Gulf Nuclear Station, Unit 1 (← links)
- GNRO-2016/00015, Non-Proprietary Version of MP Machinery and Testing, LLC (Mpm) Proprietary Report 814779, Revs 1 & 2, Neutron Transport Analysis for Grand Gulf Nuclear Station, Previously Included in Letters GNRO-2014/0080 and GNRO-2015/00011 (← links)
- GNRO-2015/00016, Correction to Grand Gulf Nuclear Station Technical Specification Page 3.6-23, Originally Submitted to the NRC in Grand Gulf Nuclear Station, Unit 1, Letter GNRO-2014/00053 (← links)
- GNRO-2013/00080, License Amendment Request Revision to Battery Cell Resistances to Address Potential Non-Conservative Technical Specification Grand Gulf Nuclear Station, Unit 1 (← links)
- GNRO-2013/00097, Request to Withdraw Supplement to the License Amendment Request for Implementing a 24-Month Fuel Cycle (← links)
- GNRO-2013/00076, Supplemental Information to Clarify License Amendment Request for Implementing a 24-Month Fuel Cycle at Grand Gulf Nuclear Station, Unit 1 (← links)
- GNRO-2013/00022, Response to Request for Additional Information Regarding Revision 14 to the Grand Gulf Nuclear Station Physical Security, Safeguards Contingency, and Training and Qualification Plan (← links)
- GNRO-2013/00023, Supplement to the License Amendment Request for Implementing a 24-Month Fuel Cycle (← links)
- GNRO-2012/00096, License Amendment Request for Implementing a 24-Month Fuel Cycle, Grand Gulf Nuclear Station, Unit 1 (← links)
- GNRO-2012/00104, Summary Report of Replacement Steam Dryer Data (← links)
- GNRO-2012/00055, Response to Request for Additional (RAI) Set 12 Dated May 9, 2012 (← links)
- GNRO-2011/00096, Proposed Emergency Action Levels Using NEI 99-01 Revision 5 Scheme Grand Gulf Nuclear Station (← links)
- GNRO-2011/00009, Request for Alternative GG-ISI-013 Proposed Alternative to 10 CFR 50.55a Examination Requirements for Reactor Pressure Vessel Weld Inspections (← links)
- GNRO-2009/00056, Transmittal of Grand Gulf Nuclear Station Security Plan, Revision 8 (← links)
- GNRO-2009/00067, Transmittal of Grand Gulf Nuclear Station Security Plan, Revision 9 (← links)
- GNRO-2008/00063, UFSAR Update for Grand Gulf, Unit 1, Nuclear Station for September 2008 (← links)
- GNRO-2008/00035, Response to Request for Additional Information for Alternative No. VRR-GGNS-2007-02 from ASME OM Code 5-Year Test Interval for Main Steam Safety Relief Valves (← links)
- GNRO-2008/00037, June 2008 Generic Fundamentals Examination (← links)
- GNRO-2007/00013, March 2007 Generic Fundamentals Examination, Grand Gulf Nuclear Station, Unit 1 (← links)
- GNRO-2006/00026, South Mississippi Electric Power Association, Grand Gulf, Unit 1, 2005 Annual Financial Report (← links)
- GNRO-2006/00002, Lnservice Inspection Summary Report for Grand Gulf Nuclear Station Unit 1 (← links)
- GNRO-2003/00014, Transmittal of Changes to Grand Gulf Nuclear Station Emergency Plan Implementing Procedures. Includes 10-S-01-29, Rev. 19 & 10-S-01-17, Rev. 1 (← links)
- GNRO-2014/00060, Entergy'S Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (← links)
- GNRO-2013/00087, Supplemental Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Hazard Walkdowns Conducted to Verify Current Plant Compliance with the Current Licensing Basis (Clb) for Seismic Requirements (← links)
- GNRO-2013/00067, LAR Application for Technical Specification Changes; Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel.. (← links)
- GNRO-2013/00053, Follow-up Actions from Teleconference Held on Thursday, August 1, 2013, Related to Pre-Decisional Enforcement Conference Between NRC and Grand Gulf Held on Tuesday July 16, 2013 (← links)
- GNRO-2013/00032, Entergys Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (← links)
- GNRO-2013/00021, Comments on Safety Evaluation Report Related to the License Renewal of Grand Gulf Nuclear Station, Dated January 31, 2013 (← links)
- GNRO-2011/00095, License Renewal Application Environmental Report References, Grand Gulf Nuclear Station, Unit 1 (← links)
- GNRO-2008/00006, to Amendment Request Condensate Storage Tank Setpoint Change, Grand Gulf Nuclear Station, Unit 1 (← links)
- GNRO-2018/00051, Supplement to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control (← links)
- GNRO-2018/00047, Submittal of 2018 Inservice Inspection Summary Report (← links)
- GNRO-2018/00046, Submittal of 2018 Report of Changes and Errors to 10CFR50.46 (← links)
- GNRO-2018/00048, Response to Request for Additional Information License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 (← links)
- GNRO-2018/00043, Revised Offsite Dose Calculation Manual (← links)
- GNRO-2018/00042, Core Operating Limits Report Cycle 22, Revision 1 (← links)
- GNRO-2018/00040, Report of 10CFR50.59 Evaluations and Commitment Change Evaluations - July 1, 2016 Through June 30, 2018 (← links)
- GNRO-2018/00039, Report of Technical Specification Bases Changes (← links)
- GNRO-2018/00037, Submittal of Report of 10 CFR72.48 Evaluations July 1, 2016 Through June 30, 2018 (← links)
- GNRO-2018/00035, Submittal of Emergency Plan, Revision 77 (← links)
- GNRO-2018/00029, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) (← links)
- GNRO-2018/00024, Notice of Readiness of 95001 Supplemental Inspection for Unplanned Scrams (← links)
- GNRO-2018/00020, Transmittal of Annual Report of Individual Monitoring - NRC Form 5 for 2017 Per 10CFR20.2206 (← links)
- GNRO-2018/00013, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) (← links)
- GNRO-2018/00007, Application to Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control. (← links)
- GNRO-2018/00006, Spent Fuel Storage Radioactive Effluent Release Report for 2017 (← links)
- GNRO-2017/00061, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis (← links)