Pages that link to "CP-202100202, One-Time Request for Exemption from the Biennial Emergency Preparedness Exercise Requirements in 10 CFR 50, Appendix E, IV.F.2.b and IV.F.2.c"
Jump to navigation
Jump to search
The following pages link to CP-202100202, One-Time Request for Exemption from the Biennial Emergency Preparedness Exercise Requirements in 10 CFR 50, Appendix E, IV.F.2.b and IV.F.2.c:
Displayed 50 items.
- CP-201300480, Comanche Peak, Unit 1, Submittal of Cycle 17 Core Operating Limits Report, Revision 0 (← links)
- CP-201300040, Comanche Peak, Units 1 and 2 - Transmittal of Year 2012 Radiological Environmental Operating Report (← links)
- CP-201300130, Comanche Peak, Units 1 & 2, Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendments 105 (← links)
- CP-201201258, Comanche Peak Nuclear Power Plant - Spent Fuel Pool Criticality Analysis (← links)
- CP-201200347, Comanche Peak, Units 1 and 2, Transmittal of Year 2011 Radioactive Effluent Release Report (← links)
- CP-201200034, Comanche Peak, Units 1 and 2, Submittal of the Annual Non-Radiological Environmental Operating Report for 2011 (← links)
- CP-201100770, Letter to NRC Luminant Generation Company LLC Request for Approval of Secure Voice Communication (← links)
- CP-201101065, Comanche Peak Units 1 & 2, Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendment 104 (← links)
- CP-201100170, Comanche Peak - Guarantees of Payment of Deferred Premiums (← links)
- CP-200901403, Comanche Peak - Supplement to Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (← links)
- CP-200900748, Comanche Peak - License Amendment Request 09-007, Model D5 Steam Generator Alternate Repair Criteria (← links)
- CP-200900568, Comanche Park Steam Electric Station - Transmittal of Year 2008 Radiological Environmental Operating Report (← links)
- CP-200900615, Comanche Peak, Units 1 and 2, Transmittal of Year 2008 Radioactive Effluent Release Report (← links)
- CP-200801606, Comanche Peak - Supplement to Response to NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors, Cover Letter (← links)
- CP-200800612, Commanche Peak, Units 1 & 2 - Transmittal of Revised Pressure and Temperature Limits Report (← links)
- CP-200800276, Commanche Peak, Transmittal of Second-Half 2007 Fitness-for-Duty Program Performance Data (← links)
- CP-200800053, Submittal of Annual Report of Changes in Peak Cladding Temperature for Comanche Peak Steam Electric Station (CPNPP) Units 1 and 2 (← links)
- CP-201701010, Special Report 1-SR-17-001-00 for Comanche Peak Nuclear Power Plant, Unit 1 Regarding Inoperable Post Accident Monitoring Instrument Report (← links)
- CP-201301274, Revision of Commitment Number 4457005 Related to Comanche Peak Nuclear Power Plant, License Amendment Request 12-007, Revision to Technical Specification 3.8.1, AC Sources-Operating, for Two, 14-Day Completion Times for Offsite Circuits (← links)
- CP-201301109, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - 1.5 Year Response for CEUS Sit (← links)
- CP-200901227, Revision to Request for Relief to Extend the Unit 1 and 2 in Service Inspection Interval for the Reactor Vessel Weld Examination and Withdrawal of License Amendment Request 09-004 to Add License Condition for Submittal of ISI Informatio (← links)
- CP-201800652, Special Report 1-SR-18-001-00, Inoperable Post Accident Monitoring Instrumentation Report (← links)
- CP-201800215, Submittal of Nineteenth Refueling Outage (1RF19) Steam Generator 180 Day Report (← links)
- CP-201700977, Core Operating Limits Report, Rev. 1 (← links)
- CP-201700805, Sixteenth Refueling Outage (2RF16) Steam Generator 180 Day Report (← links)
- CP-201700308, Core Operating Limits Report for Cycle 17, Prepared Per Technical Specification 5.6.5 (← links)
- CP-201700120, Relief Request 2B3-1 Third Ten Year Inservice Inspection Interval from 10 CFR 50.55a Inspection Requirements Due to Geometric Limitations (← links)
- CP-201600869, Submittal of Eighteenth Refueling Outage (1RF18) Inservice Inspection Summary Report (← links)
- CP-201501100, Response to Request for Additional Information for Relief Request B-3 for the Second Ten-Year Inservice Inspection Interval Fram 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME Code....) (← links)
- CP-201501103, Response to Request for Additional Information for Relief Request B-11 for the Second Ten-Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME Code....) (← links)
- CP-201501104, Response to Request for Additional Information for Relief Requests B-15, C-2, and C-4 for the Second Ten-Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition Of. (← links)
- CP-201501101, Response to Request for Additional Information for Relief Request B-9 for the Second Ten-Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME Code....) (← links)
- CP-201501102, Response to Request for Additional Information for Relief Request B-10 for the Second Ten-Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME, Section...) (← links)
- CP-201500995, Compliance with NRC Order Modifying Licenses with Regard to Requirements for Mitigating Strategies for Beyond Design-Basis External Events (Order Number EA-12-049) (← links)
- CP-201500957, Core Operating Limits Report, Cycle 16, Revision 0 (← links)
- CP-201500727, Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.5.2, ECCS - Operating (← links)
- CP-201500554, Response to Request for Additional Information, 2RF14 Steam Generator Tube Inservice Inspection Report (← links)
- CP-201500509, Response to Request for Additional Information for Relief Request No. 2C3-1 for the Reactor Vessel Leak-Off Flange (Third ISI Interval Start Date: August 3, 2014; Third ISI Interval End Date: August 2, 2024) (← links)
- CP-201500441, Response to Request for Additional Information, 2RF14 Steam Generator Tube Inservice Inspection Report - TAC MF5052 (← links)
- CP-201500157, Relief Request No. 2C3-1 for the Reactor Pressure Vessel Leak-Off Flange (Third ISI Interval Start Date: August 3, 2014; Third ISI Interval End Date: August 2, 2023) (← links)
- CP-201401227, Cycle 15 Core Operating Limits Report, Revision 1 (← links)
- CP-201401268, Fourteenth Refueling Outage (2RF14) Steam Generator 180 Day Report (← links)
- CP-201401035, Relief Requests Nos. B-7, B-12 and B-13 for the Second 10-Year ISI Interval (Second ISI Interval Start Date: August 3, 2004; Second ISI Interval End Date: August 2, 2014) (← links)
- CP-201400397, Core Operating Limits Report, Cycle 15 (← links)
- CP-201301361, Relief Request No. B-14 for Reactor Pressure Vessel Hot Leg Nozzle Weld Examinations (Second ISI Interval End Date: August 2, 2014) (← links)
- CP-201301238, Sixteenth Refueling Outage (1RF16) Steam Generator 180 Day Report (← links)
- CP-201300005, Submittal of Inservice Inspection Summary Report for the 13th Refueling Outage (← links)
- CP-201300003, Submittal of Relief Request No. B-2, Third 10 Year ISI Interval from 10CFR50.55a Requirements for Reactor Vessel Hot Leg Nozzle Weld Examinations (Third ISI Interval Start Date August 13, 2010) (← links)
- CP-201201386, Core Operating Limits Report, Unit 2, Cycle 14 (← links)
- CP-201200978, Relief Request No. C-2 for the Unit 1 Reactor Pressure Vessel Leak-off Flange (Third ISI Interval Start Date: August 13, 2010) (← links)