Pages that link to "05000423/LER-1996-009-02, Submits Table of Commitments Re LER 96-009-02 Per 10CFR50.73(a)(2)(ii)"
Jump to navigation
Jump to search
The following pages link to 05000423/LER-1996-009-02, Submits Table of Commitments Re LER 96-009-02 Per 10CFR50.73(a)(2)(ii):
Displayed 50 items.
- ML20137S314 (redirect page) (← links)
- 05000423/LER-1996-009, Submits Table of Commitments Re LER 96-009-02 Per 10CFR50.73(a)(2)(ii) (redirect page) (← links)
- 05000423/LER-1996-045, Forwards LER 96-045-00,documenting Condition That Was Determined at Millstone Unit 3 on 961107.LER Submitted Pursuant to 10CFR 50.73(a)(2)(ii).Commitments Encl (← links)
- 05000423/LER-1996-044, Forwards LER 96-044-00,documenting Condition That Was Determined at Millstone Unit 3,on 961108.Commitments,encl (← links)
- 05000423/LER-1996-047, Revises Commitment Made in Response to LER 96-047-00 Re Seismic Qualification Training (← links)
- 05000423/LER-1996-050, Revises Commitments Previously Submitted to NRC in LER 96-050-00 Re Range of Control Bldg Chilled Water Pump Gauges Used for Surveillance Not in Accordance W/Asme Chapter XI Requirements (← links)
- 05000423/LER-1996-037, Revises Commitment Previously Submitted to NRC in LER 96-037-00, SFP Cooling Sys Potentially Inoperable Following SSE Due to Failure of Non Seismic Connecting Piping (← links)
- 05000245/LER-1996-053, Forwards LER 96-053-00,documenting Event Occurred at Unit 1 on 961002.Util Will Develop Necessary Procedures to Perform Monthly Source Checks for Monitors & Instrument Calibrs Will Be Performed Monthly to Satisfy TS Requirement (← links)
- 05000336/LER-1996-043, Fowards LER 96-043-00,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 961231.Util Commitments Made within Ltr,Listed (← links)
- 05000336/LER-1996-042, Forwards LER 96-042-00,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 961218.Commitments Made within Ltr (← links)
- 05000423/LER-1996-051, Forwards LER 96-051-00 & Util Commitments in Response to Event (← links)
- 05000336/LER-1996-041, Forwards LER 96-041-00,documenting Event at Plant on 961217.Commitments Made Re Event Listed (← links)
- 05000336/LER-1996-040, Forwards LER 96-040-00,documenting Event That Occurred at Mnps,Unit 2 on 961212.Commitment Made within Ltr,Listed (← links)
- 05000245/LER-1996-056, Forwards LER 96-056-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 961212,per 10CFR50.73(a)(2)(i). Commitments Made within Ltr,Submitted (← links)
- 05000336/LER-1996-039, Forwards LER 96-039-00 Which Documents Event That Occurred at Mnps,Unit 2 on 961106.Commitment Made within Ltr,Listed (← links)
- 05000336/LER-1996-038, Forwards LER 96-038.Commitments Made Re LER Submitted (← links)
- 05000423/LER-1996-046, Fowards LER 96-046-00.Licensee Commitments Listed,Including Containment Fuel Drop Radiation Monitor Design Reviewed & TS Change Request Will Be Submitted to NRC for Approval (← links)
- 05000336/LER-1996-035, Forwards LER 96-035-00,documenting Occurrence on 961009. Commitments Listed (← links)
- 05000423/LER-1996-035, Forwards LER 96-035-00.MOV Calculations Will Be Revised Based on Bounding Application Factor/Pullout Efficiency or MOV Specific Performance Characteristics Prior to start-up from Current Outage (← links)
- 05000423/LER-1996-032, Forwards LER 96-032-00 Re 960909 Event.Listed Commitments Will Be Completed Including Performance of Hydrostatic Test of Sih Relief Valves (← links)
- 05000423/LER-1996-021, :on 960628,components Not Included in IST Program as Result of Programmatic Deficiencies,Was Discovered.Caused by Inadequate Mgt Commitment.Existing IST Documents & Procedures Will Be Reviewed & Revised (← links)
- 05000245/LER-1996-023-01, :on 960306,movement of New Fuel Assemblies Over Spent Fuel Pool Resulted in Condition Outside of Design Basis of Plant.Caused by Personnel Error.New Fuel Elevator Tagged Out & Deenergized to Prevent Use (← links)
- 05000423/LER-1996-004-01, :on 960319,determined That Auxiliary Feedwater Isolation Valves Were in Noncompliance W/Ts.Caused by Misinterpretation of Ts.Revised Operating Procedure to Preclude cross-connected Sys Alignment (← links)
- 05000245/LER-1996-066, :on 960326,discovered LPCI Heat Exchangers Were Inoperable.Caused by Failure to Develop Adequate Heat Exchanger Performance Testing,Monitoring & Insp Program. Program Based on GL 89-13 Developed Prior to Restart (← links)
- 05000245/LER-1996-039-02, Forwards LER 96-039-02 Re IST of Valves Not Being Performed IAW Program & ASME Code Requirements.Suppl of Completion of Commitments Provided (← links)
- 05000245/LER-1996-035, :on 960506,discovered Leaking gamma-radiography Access Port Plug in LPCI Sys Piping.Caused by Access Port Plug Not Being Included in Insp Program.Two Degraded Gamma Plugs Will Be Repaired by Weld Overlay (← links)
- 05000245/LER-1996-035-02, Forwards LER 96-035-02,documenting Event That Occurred on 960506.Rept Provides Results of Metallurgical Sample from Gamma Plug Per Commitment B15744-3 to Determine Cause of Cracks Found in Gamma Access Port Plug (← links)
- 05000423/LER-1996-036-02, Forwards LER 96-036-02,documenting Condition Originally Identified on 960926.List of Commitments Provided (← links)
- 05000423/LER-1996-034, :on 960918,RHR Pump Suction Relief Valve Setpoint Was Not IAW Ts.Caused by Insufficient Configuration Control within Design Control Program.Ts Change Was Implemented on 970710 That Revised Setpoint Value (← links)
- 05000423/LER-1996-034-02, Forwards LER 96-034-02,documenting Condition That Was Initially Determined Reportable at Millstone Unit 3 on 960918.Commitments Made in Response to Event Also Encl (← links)
- 05000336/LER-1996-003-01, :on 960205,failed to Recognize Requirement to Enter TS LCO 3.0.3 Following Discovery of Ice Blockage. Caused by Inadequate Problem Identification Methods.Design Basis Summary Documents Have Been Prepared Re TS Safety Sys (← links)
- 05000336/LER-1996-018, :on 960316,gaps Discovered in Encls Door Seals for Motor Control Ctrs B51 & B61.Caused by Weakness in Existing Program to Inspect & Verify Integrity of Environ Protective Barriers.Doors for MCC B51 & MCC B61 Replaced (← links)
- 05000336/LER-1996-018-01, Forwards LER 96-018-01,documenting Condition That Was Discovered at Unit 2 on 960319.LER Suppl Provides Update on Analyses & Investigation of Condition.Attachment 1 Is Clarification of Original Commitment Associated W/Ler (← links)
- 05000245/LER-1996-003, :on 960111,discovered Existing Anchorage of EDG Day Tank Not Seismically Adequate.Caused by Original Design Deficiency.Anchorage of EDG Tank Will Be Graded to Meet Design Basis of Seismic Load Requirements (← links)
- 05000245/LER-1996-037, :on 960327,noted That Apr Sys May Not Be Single Failure Proof.Caused by Misinterpretation of Design Basis Requirements.Will Revise SBLOCA Long Term Cooling Analysis to Include FWCI as ECCS Sys (← links)
- 05000245/LER-1996-009-01, :on 960109,isolation Condenser Makeup Water Temperature Below Design Basis Limit,Determined.Caused by Inadequate Design Specification.Preliminary Assessment of non-ductile Failure of Isolation Condenser Sys Performed (← links)
- 05000423/LER-1996-031-02, :on 960906,potential Failure of Safety Related Control Valves Due to Failure of non-qualified Air Regulators,Concluded.Caused by Failure to Consider Potential for Pressure Regulator Failure.Design Mod Being Developed (← links)
- 05000423/LER-1996-031-01, Forwards LER 96-031-01 Per 10CFR50.73(a)(2)(v).Commitments Contained within Attachment 1 to Ltr (← links)
- 05000423/LER-1996-049-02, :on 961211,non-compliance to Non Class 1E Electrical Cable Separation Was Noted.Caused by Inadequate Electrical Separation Insp.Work Planning Process Procedures Have Been Revised (← links)
- 05000423/LER-1996-049-01, Forwards LER 96-049-01,documenting an Event That Occurred at Mnps,Unit 3 on 961211.Commitments Made within Ltr,Encl (← links)
- 05000336/LER-1996-029, :on 960715,discovered That Evaluation for Removal of Startup Rate Trip Feature Was Potentially non-conservative.Caused by Failure to Adequately Identify Design Basis Requirements.Modified Procedures (← links)
- 05000336/LER-1996-029-01, Forwards LER 96-029-01,providing Update on Analyses & Investigation for Event.Commitments Made within Ltr,Listed (← links)
- 05000423/LER-1996-009, :on 960423,inoperable Shutdown Margin Monitors from Low Count Rate Occurred Due to Inadequate Design Control.Reduced SMM Setpoint (← links)
- 05000245/LER-1996-063, :on 961126,discovered Downscale Trip Fuctions for Steam Tunnel Vent Radiation Monitors Did Not Trip as Required by Design.Caused by Procedural Deficiency.Procedure for Steam Tunnel Vent Monitors Changed (← links)
- 05000245/LER-1996-063-01, Forwards LER 96-063-01,documenting Event Occurred at Unit 1 on 961126.Commitments Made within Ltr Listed as Submitted (← links)
- 05000423/LER-1996-009-02 (redirect page) (← links)
- ML20117H560 (redirect page) (← links)
- 05000336/LER-1996-031-01, :on 961003,discovered Potentially non-conservative Assumptions Used in Analysis Cold Result in Exceeding ASME Code Max Relief Valve Accumulation for Sg. Caused by Inadequate Design of Mssv.Plant Mods Initiated (← links)
- 05000336/LER-1996-032, :on 961008,potential Failure of RCS Vent Sys to Perform Design Function Discovered.Caused by Inadequate Design of Reactor Head Vent Portion of RCS Vent Sys. Implemented Mods (← links)
- 05000245/LER-1996-020-02, Forwards LER 96-020-02,documenting Event Occurred at Unit 1 on 960322.Supplemental Rept Provides Update to Vol Calculations.Commitment B15674-3 Updated (← links)
- 05000245/LER-1996-037-02, Forwards Supplemental LER 96-037-02 Which Documents an Event That Occurred at Mnps,Unit 1 on 960327,per 10CFR50.73(a)(2)(ii) (← links)