ML103210643

From kanterella
Jump to navigation Jump to search
Notification of Licensed Operator Initial Examination 05000424-11-301 and 05000425-11-301
ML103210643
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 11/17/2010
From: Widmann M
Division of Reactor Safety II
To: Tynan T
Southern Nuclear Operating Co
References
Download: ML103210643 (6)


See also: IR 05000424/2011301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

November 17, 2010

Mr. Tom E. Tynan

Vice President

Southern Nuclear Operating Company, Inc.

Vogtle Electric Generating Plant

7821 River Road

Waynesboro, GA 30830

SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF LICENSED

OPERATOR INITIAL EXAMINATION 05000424/2011301 AND 05000425/2011301

Dear Mr. Tynan:

In a telephone conversation on October 13, 2010, between Mr. Greg Wainwright, Operations

Training Instructor, and Mr. Phillip Capehart, Senior Operations Engineer, of the Nuclear

Regulatory Commission (NRC), arrangements were made for the administration of licensing

examinations at Vogtle Electric Generating Plant. The operating test is scheduled to be

administered during the week of March 14, 2011. The written examination is scheduled to be

administered the week of March 21, 2011. The on-site preparatory week is scheduled for the

week of February 14, 2011.

As agreed during the telephone conversation, your staff will prepare both the operating test and

written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,

"Operator Licensing Examination Standards for Power Reactors." The U.S. NRC regional office

will discuss with your staff any changes that might be necessary before the examinations are

administered. Your staff has also agreed to make copies of all examination materials that are

necessary for administering the examination.

To meet the above schedule, it will be necessary for your staff to furnish the operating test

outline by December 21, 2010. Mr. Capehart provided the written outline to members of your

staff in October, 2010. The operating test, written examination, and the supporting reference

materials identified in Attachment 3 to ES-201 will be due by January 4, 2011. Pursuant to Title

10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized

representative of the facility licensee shall approve the outline, examination, and test before

they are submitted to the NRC for review and approval. All materials shall be complete and

ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

SNC 2

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications, medical certifications, and waiver

requests (if any) at least 30 days before the first examination date. If the applications are not

received at least 30 days before the examination date, a postponement may be necessary.

Signed applications certifying that all training has been completed should be submitted at least

14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget. The public reporting burden for this collection of information is

estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions,

gathering and maintaining the data needed, writing the examinations, and completing and

reviewing the collection of information. Send comments on any aspect of this collection of

information, including suggestions for reducing the burden, to the Information and Records

Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-

0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer,

Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management

and Budget, Washington, DC 20503.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of the NRCs document

system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-

rm.adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. Wainwright has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRC's

examination procedures and guidelines, please contact Mr. Phillip Capehart at (404) 997-4483,

(Internet E-mail: phillip.capehart@nrc.gov), or me at (404) 997-4550, (Internet E-mail:

malcolm.widmann@nrc.gov).

Sincerely,

/RA/

Malcolm T. Widmann, Chief

Operations Branch

Division of Reactor Safety

Docket Nos.: 50-424, 50-425

License Nos.: NPF-68, NPF-81

cc: See Page 3

_ X SUNSI REVIEW COMPLETE

OFFICE RII:DRS RII:DRS

SIGNATURE RA RA

NAME PCapehart MWidmann

DATE 11/17/2010 11/17/2010

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

SNC 3

cc w/encl: E. G. Anners

Division of Radiological Health Licensing Engineer

TN Dept. of Environment & Conservation Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Electronic Mail Distribution

B. D. McKinney, Jr. N. J. Stringfellow

Regulatory Response Manager Licensing Manager

Southern Nuclear Operating Company, Inc. Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Electronic Mail Distribution

Hickox, T. Mark Paula Marino

Vogtle Electric Generating Plant Vice President

Electronic Mail Distribution Engineering

Southern Nuclear Operating Company, Inc.

M. J. Ajluni Electronic Mail Distribution

Nuclear Licensing Director

Southern Nuclear Operating Company, Inc. Bob Masse

Electronic Mail Distribution Resident Manager

Vogtle Electric Generating Plant

Sandra Threatt, Manager Oglethorpe Power Corporation

Nuclear Response and Emergency Electronic Mail Distribution

Environmental Surveillance

Bureau of Land and Waste Management Moanica Caston

Department of Health and Environmental Vice President and General Counsel

Control Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Electronic Mail Distribution

T. D. Honeycutt S. C. Swanson

Regulatory Response Supervisor Site Support Manager

Southern Nuclear Operating Company, Inc. Vogtle Electric Generating Plant

Electronic Mail Distribution Electronic Mail Distribution

Jeffrey T. Gasser Chris Clark

Chief Nuclear Officer Commissioner

Southern Nuclear Operating Company, Inc. Georgia Department of Natural Resources

Electronic Mail Distribution Electronic Mail Distribution

L. Mike Stinson Lee Foley

Vice President Manager of Contracts Generation

Fleet Operations Support Oglethorpe Power Corporation

Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

Electronic Mail Distribution

F. Allen Barnes

R. D. Baker Director

Licensing Supervisor Environmental Protection Division

Southern Nuclear Operating Company, Inc. Georgia Department of Natural Resources

Electronic Mail Distribution Electronic Mail Distribution

SNC 3

cc w/encls (continued) Office of the Attorney General

Cynthia A. Sanders Electronic Mail Distribution

Radioactive Materials Program Manager

Environmental Protection Division Office of the County Commissioner

Georgia Department of Natural Resources Burke County Commission

Electronic Mail Distribution Electronic Mail Distribution

James A. Sommerville

Program Coordination Branch Chief Arthur H. Domby, Esq.

Environmental Protection Division Troutman Sanders

Georgia Department of Natural Resources Electronic Mail Distribution

Electronic Mail Distribution

Director

James C. Hardeman Consumers' Utility Counsel Division

Environmental Radiation Program Manager Govenor's Office of Consumer Affairs

Environmental Protection Division 2 M. L. King, Jr. Drive

Georgia Department of Natural Resources Plaza Level East; Suite 356

Electronic Mail Distribution Atlanta, GA 30334-4600

Ted V. Jackson Senior Resident Inspector

Emergency Response and Radiation U.S. Nuclear Regulatory Commission

Program Manager Vogtle Electric Generating Plant

Environmental Protection Division U.S. NRC

Georgia Department of Natural Resources 7821 River Road

Electronic Mail Distribution Waynesboro, GA 30830

Mr. Steven M. Jackson Susan E. Jenkins

Senior Engineer - Power Supply Director, Division of Waste Management

Municipal Electric Authority of Georgia Bureau of Land and Waste Management

Electronic Mail Distribution S.C. Department of Health and

Environmental Control

Mr. Reece McAlister Electronic Mail Distribution

Executive Secretary

Georgia Public Service Commission

Electronic Mail Distribution