ML102710269

From kanterella
Revision as of 23:56, 20 August 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Revision to Possession Only License for the University of Arizona Research Reactor
ML102710269
Person / Time
Site: 05000113
Issue date: 09/20/2010
From: Williams J G
Univ of Arizona
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML102710269 (4)


Text

Nuclear Reactor Laboratory A John G. Williams, Director Engineering Building (20) A E-mail: i gwgengr.arizona.edu P. O. Box 210020 Voice: (520) 621-9729 Tucson, Arizona 85721-0020 TUCSON ARIZONA FAX: (520) 621-8096 September 20, 2010 U.S. Nuclear Regulatory Commission 10 CFR 50 ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Revision to Possession Only License for the University of Arizona Research Reactor, Facility License No. R-52, Docket No. 50-113 This letter revises the attachment to our 'possession only' request dated August 13, 2010.Per today's conference call portions of our proposed Technical Specifications Amendment 19 which mention "a person with knowledge and experience equivalent to that of a licensed...operator" are not acceptable.

Hence, attached are revised sections 4.4c, 6.1b, and 6.1d which return the wording back to our existing Technical Specifications Amendment 18.Since May 21, 2010, we have:* Ceased reactor operations," Partially unloaded fuel from Arizona Research Reactor so it contains insufficient fissile material present in the reactor core to attain criticality under optimum available conditions of moderation and reflection," Maintained the reactor in a "secured" condition," Continued our possession of the nuclear fuel," Maintained our surveillance activities, and" Maintained the facility-including the storage, control, and maintenance of the spent fuel-in a safe condition until the defueling is completed.

By prior agreement, the DOE through its Reactor Fuel Assistance Program will assist in defueling our nuclear reactor following the end of operations.

I declare under penalty of perjury that the foregoing is true and correct. Executed on September 20, 2010.11G. Williams, Director University of Arizona Research Reactor Attachment Revised pages with sections 4.4c, 6.1 b, and 6.1 d ,A ..P Revision to Possession Only License for the University of Arizona Research Reactor, Facility License No. R-52, Docket No. 50-113 dated September 20, 2010 Copies to: Linh Tran, NRC/NRR/DPR/PRLB Mike Morlang, NRC/NRR/DPRIPROB Patrick Issac, NRC/NRR/DPR!PROB U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 U.S. NRC Region IV Texas Health Resources Tower 612 East Lamar Blvd.Arlington, TX 76011-4005 Dr. Leslie Tolbert Vice President for Research University of Arizona P.O. Box 210066 Tucson, AZ 85721-0066 Acting Director Arizona Research Laboratories University of Arizona Gould-Simpson Bldg. 1011 P.O. Box 210077 Tucson, AZ 85721-0077 Daniel Silvain, Director Radiation Control Office University of Arizona P.O. Box 245101 Tucson, AZ 85724-5101 Technical Specifications, Amendment No. 19 4.4 Maintenance Applicability-This specification applies to the surveillance requirements following maintenance of a control or safety system.Objective The objective is to assure that a system is operable before being used after maintenance has been performed.

Specification

a. Following maintenance or modification of a control or safety system or component, it shall be verified that the system is operable prior to its return to service. A system shall not be considered operable until after it is successfully tested.b. Any additions, modifications, or maintenance to the ventilation system, the core and its associated support structure, the pool or its penetrations, the pool coolint system, 1he rod drive mechanism, or the reactor safety system shall be made and tested in accordance with the specifications to which the systems were originally designed and fabricated or to specifications approved by the Reactor Committee.
c. A licensed reactor operator shall be present during maintenance of the reactor control and safety system.Basis This specification relates to changes in reactor systems which could directly affect the safety of the reactor. Changes or replacements to these systems which meet the original design specifications are considered to meet the presently accepted operating criteria.University of Arizona Research Reactor Page 12 Technical Specifications, Amendment No. t 9 6.0 ADMINISTRATIVE CONTROLS 6.1 Organization
a. The reactor facility shall be maintained by the Nuclear Reactor Laboratory (NRL) at the University of Arizona. The Nuclear Reactor Laboratory Director shall report to the Vice President for Research and Graduate Studies at the University of Arizona as. shown in the organization charts below.b. The reactor facility shall be under the supervision of a licensed senior operator for the reactor. He shall be responsible for assuring that all activities are conducted in a safe manner and within the limits prescribed by applicable federal regulations, by the facility license, and by the provisions of the Reactor Committee.
c. There shall be a Health Physicist responsible for assuring the safety of the reactor from the standpoint of radiation protection.
d. An NRC-licensed operator must be present in the control room when the key switch is on.The reactor shall remain shut down.University of Arizona Research Reactor Page 17