ML103400637
ML103400637 | |
Person / Time | |
---|---|
Site: | Seabrook |
Issue date: | 09/16/2010 |
From: | Office of Nuclear Reactor Regulation |
To: | Division of License Renewal |
References | |
Download: ML103400637 (5) | |
Text
1 SeabrookNPEm Resource From: Green, Kimberly Sent: Thursday, September 16, 2010 10:32 AM To: Cliche, Richard Cc: Plasse, Richard; Rogers, Billy; Auluck, Rajender
- Wrona, David; lhoward@swri.org; Brittner, Donald; Min, Seung; Dozier, Jerry
- Smith, Edward; Armstrong, Garry
Subject:
Audit Plan for the Scoping and Screening Met hodology Audit to be Conducted at Seabrook Attachments:
Seabrook SS Methodology Audit Assignments.
doc; Seabrook SS Methodology Audit Site Documentation List (3).docRick, Below is the audit plan for the upcoming scoping and screening methodology audit. The team assignments and documentation needs list are attached to this email. If you have any questions regarding the audit plan or attachments, please do not hesitate to call me.
Kim Green
Project Manager
301-415-1627 Audit Plan Scoping and Screening Methodology Audit Seabrook Station, Unit 1 September 20 - 23, 2010
- a. Background
By letter dated June 1, 2010, NextEra Energy Seabrook, LLC, (NextEra) submitted an application pursuant to Title 10 of the Code of Federal Regulations, Part 54 (10 CFR Part 54) for renewal of Operating License No. NPF-86 for Seabrook Station, Unit 1. NextEra requested renewal of the operating license for an additional 20 years beyond the current 40-year license term, which expires at midnight on October 17, 2026. The staff from the Division of License Renewal will lead an on-site regulatory audit to gain a better understanding of the documentation and methodologies used by the applicant to perform scoping and screening of systems, structures and components (SSCs).
- b. Regulatory Audit Bases As required by 10 CFR 54.21(a)(2), the applicant, in its integrated plant assessment (IPA), is to describe and justify methods used to identify SSCs subject to an aging management review (AMR).
- c. Regulatory Audit Scope or Methodology NUREG-1800, Revision 1, "Standard Review Plan for Revi ew of License Renewal Applications for Nuclear Power Plants" (SRP-LR), Section 2.1, "Scoping and Screening Methodology," contains guidance for staff in conducting its review of the applicant's methodology.
During the scoping and screening methodology audit, the staff will focus on those methods used by the applicant to conduct scoping of mechanical systems, electrical and instrumentation and control systems, and structures consistent with 10 CFR 54.4(a), and screening of structures and components consistent with 10 CFR 54.21(a)(1).
In addition, the staff will sample the scoping and screening results for the following mechanical systems:
2 Diesel generator Plant floor drain system Roof drain system Service water system Spent fuel pool system Feedwater system
- d. Information and Other Material Necessary for the Regulatory Audit A list of the audit documentation needed by the team during the conduct of the audit is attached.
- e. Team Assignments A list containing the proposed assignments is attached.
- f. Logistics The audit will begin on Monday, September 20, 2010 and conclude on Thursday, September 23, 2010. An entrance meeting is scheduled for September 20, at 9:30 a.m., and a final briefing is scheduled for 4:30 p.m. on September 23.
- g. Deliverables The deliverable for this audit will be an audit trip report which is scheduled to be issued within 90 days following the audit.
- h. References Title 10 of the Code of Federal Regulations, Part 54, "Requirements for Renewal of Operating Licenses for Nuclear Power Plants" NUREG-1800, Rev. 1, "Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants," September 2005. NEI 95-10, Rev. 6, "Industry Guideline for Implementing the Requirements of 10 CFR Part 54 - The License Renewal Rule," June 2005.
Hearing Identifier: Seabrook_License_Renewal_NonPublic Email Number: 92 Mail Envelope Properties (Kimberly.Green@nrc.gov20100916103200)
Subject:
Audit Plan for the Scoping and Screening Methodology Audit to be Conducted at Seabrook Sent Date: 9/16/2010 10:32:13 AM Received Date: 9/16/2010 10:32:00 AM From: Green, Kimberly Created By: Kimberly.Green@nrc.gov Recipients: "Plasse, Richard" <Richard.Plasse@nrc.gov> Tracking Status: None "Rogers, Billy" <Billy.Rogers@nrc.gov> Tracking Status: None "Auluck, Rajender" <Rajender.Auluck@nrc.gov>
Tracking Status: None "Wrona, David" <David.Wrona@nrc.gov> Tracking Status: None "lhoward@swri.org" <lhoward@swri.org> Tracking Status: None "Brittner, Donald" <Donald.Brittner@nrc.gov>
Tracking Status: None "Min, Seung" <Seung.Min@nrc.gov> Tracking Status: None "Dozier, Jerry" <Jerry.Dozier@nrc.gov> Tracking Status: None "Smith, Edward" <Edward.Smith@nrc.gov> Tracking Status: None "Armstrong, Garry" <Garry.Armstrong@nrc.gov>
Tracking Status: None "Cliche, Richard" <Richard.Cliche@fpl.com> Tracking Status: None
Post Office: Files Size Date & Time MESSAGE 3622 9/16/2010 10:32:00 AM Seabrook SS Methodology Audit Assignments.doc 46074 Seabrook SS Methodology Audit Site Documentation List (3).doc 38394 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:
Scoping and Screening Methodology Audit Seabrook Station, Unit 1 September 20 - 23, 2010 - Team Assignments Bill Robert Lane Don/Seung Scoping 10 CFR 54.4(a)(1) (info source, def. of SR, DBEs, S&S reports)
SER: 2.1.4.1 (and subs), Audit Report: I, II, III, IV, IX, and X Scoping 10 CFR 54.4(a)(3)
SER: 2.1.4.3 (and subs) Audit Report
LRA App. A and App. B
SER: 3.0.4 and subs Audit Report
- V Sample Scoping Review - Random Selection from Equipment Data Base (Don)
SER/Audit Report: Discussion on staff activities, results, analysis and conclusion. Scoping 10 CFR 54.4(a)(2)
SER: 2.1.4.2 (and subs) Audit Report
- N/A Structural Scoping Structural Screening
SER: 2.1.4.6 (and subs)
SER: 2.1.5.3 (and subs) Audit Report
- N/A Electrical Scoping Electrical Screening
SER: 2.1.4.7 (and subs)
SER: 2.1.5.4 (and subs) Audit Report
- N/A Material/Environment Review - Organization and preliminary review (performed during the AMP audit) (Don)
SER: N/A Audit Report
- N/A Mechanical Scoping Mechanical Screening
SER 2.1.4.5 (and subs)
SER 2.1.5.2 (and subs) Audit Report
- N/A Training of license renewal personnel
SER: 2.1.3.3 (and subs) Audit Report: XII Quality Practices used during LRA development
SER: 2.1.3.2 and subs Audit Report
- XI NRC Staff OE Review -Organization and preliminary review of operating experience based on the keyword search (Don and Lee)
SER: N/A Audit Report
- N/A Additional SER Sections
- 2.1, 2.1.2, 2.1.3.1 (and subs),
2.1.3.4 (and subs), 2.1.4, 2.1.4.4 (and subs) 2.1.4.8, 2.1.5.1 (and subs),
2.1.6, 2.1.7. Lists: (1) implementing documents (2) technical references (3) persons contacted
SER: N/A Audit Report
- IX and XI
Seabrook Station License Renewal Scoping and Screening Methodology Audit Documentation List
! Engineering reports and procedures which contain requirements or guidelines for the implementation of scoping and screening methodology.
! 10 CFR 54.4(a)(1) plant evaluations and implementing procedures.
! 10 CFR 54.4(a)(2) plant evaluations and implementing procedures.
! 10 CFR 54.4(a)(3) plant evaluations, implementing procedures and any specific analyses performed.
! Description of the design basis events included in the FSAR, and all other additional events (e.g. high energy line break, fire, high wind, earthquakes, flooding, tornadoes),
which were evaluated during the scoping process.
! License renewal drawings.
! System design basis documents and system and component level scoping and screening reports for the following systems and structures:
- 1. Diesel generators
- 2. Plant floor drain system
- 3. Roof drains system
- 4. Service water system
- 5. Spent fuel pool cooling system
- 6. Feedwater system
- 7. Auxiliary building
- 8. Turbine Building
! Documentation of quality assurance activities associated with license renewal application development.
! Documentation of training activities associated with license renewal application development
. ! Assisted access to the plant equipment database and administrative controls procedure.
! Assisted access to the Seabrook Correctiv e Action and Operating Experience Programs database.