05000390/FIN-2016001-01
From kanterella
Revision as of 07:56, 25 September 2017 by StriderTol (talk | contribs) (Created page by program invented by Mark Hawes)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Finding | |
---|---|
Title | Failure to Use a Procedure Appropriate to the Circumstances for the Auxiliary Control Air System Train A |
Description | A self-revealing non-cited violation (NCV) of 10 Code of Federal Regulations (CFR) 50, Appendix B, Criterion V, Procedures was identified for the licensees failure to use a procedure appropriate to the circumstances for work associated with the A-A auxiliary control air system (ACAS) compressor. Specifically, the licensee used a section of procedure 0-SOI-32.02, Auxiliary Air System, Revision 2, that placed the air compressor in OFF when it was intended to place it in A-Auto. The licensee restored the compressor to A-Auto and entered this issue into their corrective action program as condition report (CR) 1131261. The performance deficiency was more than minor because it affected the equipment performance attribute of the mitigating system cornerstone to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences (i.e., core damage). Specifically, the ACAS train A was nonfunctional for approximately 19.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> on January 29, 2016 and as a supported system, the auxiliary feedwater system was inoperable during this time. The inspectors determined that this finding was of very low safety significance (Green) because the finding did not represent an actual loss of function of a single train for greater than its TS allowed outage time. The finding has a cross cutting aspect in the Work Management component of the Human Performance area because the licensee failed to implement a process of planning, controlling, and executing work activities such that nuclear safety is the overriding priority. Specifically, the planning and execution of work on the A-A ACAS compressor on January 29, 2016 lacked sufficient rigor to ensure the activity was performed as intended. |
Site: | Watts Bar |
---|---|
Report | IR 05000390/2016001 Section 1R12 |
Date counted | Mar 31, 2016 (2016Q1) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | Self-revealing |
Inspection Procedure: | IP 71111.12 |
Inspectors (proximate) | B Bishop C Kontz D Jones D Kern D Lanyi J Austin J Eargle J Hamman J Montgomery J Nadel R Reyes S Shah |
Violation of: | 10 CFR 50 Appendix B Criterion V Technical Specification Technical Specification - Procedures |
CCA | H.5, Work Management |
INPO aspect | WP.1 |
' | |