08/11/2011 Notice of Public Meeting for Perry to Discuss the 2010 EOC Plant Performance
ML111960211
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 07/15/2011
From: Marshfield M J
NRC/RGN-III/DRP/B6
To:
References
Download: ML111960211 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 July 15, 2011

NOTICE OF SIGNIFICANT MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE

Name of Licensee: FirstEnergy Nuclear Operating Company

Name of Facility: Perry Nuclear Power Plant

Docket No: 50-440

Date and Time of Meeting: August 11, 2011, 6:30 P.M (EDT)

Location of Meeting: Perry Township Community Center 2800 Perry Park Road Perry, OH 44081

Purpose of Meeting: The purpose of this meeting is to discuss the NRC end-of-cycle assessment of Perry Unit 1 performance for the 2010 calendar year. The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings,"

effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, www.nrc.gov, and contains information regarding visitors and security.

Category 1: This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion of the meeting but before the meeting is adjourned.

NRC Attendees J. Cameron, Chief, Branch 6, Division of Reactor Projects M. Marshfield, Senior Resident Inspector, Perry T. Hartman, Resident Inspector, Perry Others as assigned Notice of Significant Licensee Meeting

Licensee Attendees M. Bezilla; Site Vice President, Perry

J. Grabner; Director, Site Engineering H. Hanson; Director, Site Performance Improvement Others as assigned Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Mark Marshfield at 630/829-9681 by COB Wednesday July 29, 2011.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcription or other information from the meeting in another format (e.g., Braille, large print), please notify the NRC's meeting contact.

Determination on requests for reasonable accommodation will be made on a case-by-case basis.

Because meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances, confirm the meeting schedule.

The End-of-Cycle assessment letter can be found at Accession Number ML110620306 in ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/readingrm/adams.html (the Public Electronic Reading Room).

At about 6:00 P.M. (EDT) displays on Nu clear Regulatory Commission activities will be available at the meeting site for viewing by members of the public.

Meeting Contact: Mark Marshfield, Acting Chief Branch 6 630/829-9681

Approved By:

/RA/ Mark Marshfield, Acting Chief Branch 6 Division of Reactor Projects

DISTRIBUTION:

See next page

Notice of Significant Licensee Meeting

Distribution

Daniel Merzke, Region III Coordinator, OEDO Robert Nelson, Deputy Director, Division of Operating Reactor Licensing (DORL), NRR Tim Riley, OCA RidsNrrPMPerry Resource RidsNrrDorlLpI3-2 Resource Steven West, Director, Division of Reactor Projects, RIII Steven Reynolds, Director, Division of Reactor Safety, RIII Gary Shear, Deputy Director, Division of Reactor Projects, RIII

Kenneth O'Brien, Deputy Director, Division of Reactor Safety, RIII DRP Branch Chief SRI, Perry DRS Branch Chiefs:

Robert Daley

David Hills Richard Skokowski AnnMarie Stone Billy Dickson

Hironori Peterson Allan Barker, Regional State Liaison Officer, RIII PMNS Viktoria Mitlyng, RIII Public Affairs Prema Chandrathil Tammy Tomczak, ORA

Patricia Buckley, ORA

Marjorie Zerth, DRP Notice of Significant Licensee Meeting

Licensee Attendees M. Bezilla; Site Vice President, Perry

J. Grabner; Director, Site Engineering H. Hanson; Director, Site Performance Improvement Others as assigned Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Mark Marshfield at 630/829-9681 by COB Wednesday July 29, 2011.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcription or other information from the meeting in another format (e.g., Braille, large print), please notify the NRC's meeting contact.

Determination on requests for reasonable accommodation will be made on a case-by-case basis.

Because meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances, confirm the meeting schedule.

The End-of-Cycle assessment letter can be found at Accession Number ML110620306 in ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/readingrm/adams.html (the Public Electronic Reading Room).

At about 6:00 P.M. (EDT) displays on Nu clear Regulatory Commission activities will be available at the meeting site for viewing by members of the public.

Meeting Contact: Mark Marshfield, Acting Chief Branch 6 630/829-9681

Approved By:

/RA/ Mark Marshfield, Acting Chief Branch 6 Division of Reactor Projects

DISTRIBUTION:

See next page DOCUMENT NAME: G:\DRPIII\1-Secy\1-Work In Progress\EOC Meeting Notices and Letter\Perry Public Meeting Notice EOC 2010.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME JRutkowski:dtp MMarshfield DATE 07/14/11 07/15/11 OFFICIAL RECORD COPY