Finding | |
---|---|
Title | Failure to Adequately Install an Oil Collection System on Reactor Coolant Pump Motors |
Description | An NRC-identified non-cited violation (NCV) of 10 CFR 50.48(c) and National Fire Protection Association Standard 805 (NFPA 805), Section 3.3.12, was identified for the licensees failure to comply with code requirements for design and installation of the Unit 1 Reactor Coolant Pump (RCP) oil collection system. The oil collection system did not include gaskets between the bolted joints on the RCP oil catch-basins, as required by the approved design for the Oil Spillage Protection System (OSPS). The licensees failure to install gaskets on the Unit 1 RCP oil collection systems was a performance deficiency. The licensee was informed of the inspector observation and initiated CR 10289565. Gasket material was installed on all three RCPs on October 23, 2016, as documented on WO SNC464660, SNC459614, and SNC406358. The performance deficiency was more than minor because if left uncorrected, the inadequate installation of the RCP oil collection system presented a degradation of a fire confinement function to prevent oil to leak onto hot surfaces. The significance of this finding was evaluated using IMC 0609, Appendix F, Fire Protection Significance Determination Process, dated September 20, 2013, because the performance deficiency affected fire protection defense-in-depth strategies involving fire confinement. Using IMC 0609, Appendix F, Attachment 1, Fire Protection Significance Determination Process Worksheet, the inspectors determined that the finding was of very low safety significance (Green) because the exposed fire area contains no potential damage targets that are unique from those in the exposing fire area. The inspectors determined the finding had a cross-cutting aspect of Procedure Adherence in the human performance area because the vendor installing the oil catch-basins did not follow the RCP reassembly procedure which required gaskets between all bolted joints. [H.8] |
Site: | Farley |
---|---|
Report | IR 05000348/2016004 Section 1R05 |
Date counted | Dec 31, 2016 (2016Q4) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.05 |
Inspectors (proximate) | A Nielsen B Caballero B Collins D Mas J Panfel K Miller P Niebaum S Sandal W Pursley |
Violation of: | 10 CFR 50.48 |
CCA | H.8, Procedure Adherence |
INPO aspect | WP.4 |
' | |