ML18187A376

From kanterella
Revision as of 21:59, 30 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
NRC Region I Twitter Feeds 4-1 to 6-30-2018
ML18187A376
Person / Time
Site: Oyster Creek
Issue date: 07/06/2018
From:
NRC Region 1
To:
Sheehan N A
References
Download: ML18187A376 (15)


Text

NRC Region I Twitter posts from April 1 to June 30, 2018 April 3, 2018 The #NRC will hold its final Annual Assessment public open house for the Oyster Creek

  1. nuclear power plant

@Manahawkin , N.J., on April 10:

https://www.nrc.gov/reading-rm/doc-collections/news/2018/18-007.i.pdf - .

April 9, 2018

The #NRC is seeking public comment on a proposal for an interim repository for spent

  1. nuclear fuel proposed for a site in New Mexico: https://www.nrc.gov/reading-rm/doc-collections/news/2018/18-011.pdf - . April 10, 2018

Members of the public will have a chance to interact with

  1. NRC staff responsible for overseeing the safe operation of the
  1. ThreeMileIsland 1 #nuclear power plant on April 17 during an open house in #Middletown , PA.: https://www.nrc.gov/reading-rm/

doc-collections/news/2018/18-008.i.pdf -

April 11, 2018

  1. NRC staff will hold a public teleconference at 1 p.m. on 4/12 to discuss weld repairs to a reactor vessel head penetration @IndianPoint 2 #nuclear power plant: https://www.nrc.gov/pmns/mtg?do=details&Code=20180472 - .

April 13, 2018 The #NRC's Commission has upheld an ASLB ruling granting a hearing on a license amendment request involving concrete degradation @ the #Seabrook #nuclear power plant: https://www.nrc.gov/docs/ML1810/ML18102A097.pdf

- . April 25, 2018

  1. NRC staff will meet with the public on May 2 in
  1. Hampton, N.H., to discuss the safety performance of the
  1. Seabrook #nuclear power plant: https://www.nrc.gov/reading-rm/doc-collections/news/2018/18-009.i.pdf - . April 27, 2018 Learn about the history of
  1. radium and the #NRC's role in regulating this material, one of the first radioactive elements ever discovered: https://www.youtube.com/watch?v=KLaFVqoEDrs -

.

April 30, 2018 The #NRC has authorized a 1.6-percent power uprate @ the #HopeCreek

  1. nuclear power plant, in #Salem County, #NJ: https://www.nrc.gov/reading-rm/doc-collections/news/2018/18-013.pdf - .

May 1, 2018 The #NRC has a new Resident Inspector on the job @ the

  1. IndianPoint
  1. nuclear power plant in
  1. Buchanan , N.Y.: https://www.nrc.gov/reading-rm/doc-collections/news/2018/18-010.i.pdf - .

May 9, 2018

  1. NRC staff will be on hand

@Limerick, Pa., Township Building on May 16 for an open house regarding the agency's latest annual safety performance assessment of the

  1. Limerick #nuclear power plant:

https://www.nrc.gov/reading-rm/doc-c ollections/news/2018/18-011.i.pdf - . May 10, 2018 Members of the public will be able to learn more about the

  1. NRC's latest safety assessment of the #Susquehanna
  1. nuclear power plant during an open house on May 17 @
  1. Berwick , Pa.: https://www.nrc.gov/reading-rm/doc-collections/news/2018/18-012.i.pdf - .

May 15, 2018 The #NRC's Region I Office won seven medals May 10th during the Philadelphia Federal Executive Board's annual Excellence in Government Awards competition. The medals honored EEO/Diversity leadership, community serv ice, and individual and group professional achievements.

May 16, 2018

  1. NRC staff will be

@MuddyRun Visitor Center, in Holtwood, Pa., on May 24 for an open house on the 2017 safety performance of the

  1. PeachBottom
  1. nuclear power plant: https://www.nrc.gov/reading-rm/doc-collections/news/2018/18-013.i.pdf

- . View Tweet activity May 29, 2018 The #NRC will conduct a webinar at 4:30 p.m. on Wednesday, May 30, regarding the 2017 safety performance of the

  1. Salem and #HopeCreek
  1. nuclear power plants in
  1. Salem County, #NJ: https://www.nrc.gov/reading-rm/doc-c ollections/news/2018/18-014.i.pdf - . Advance registration is required.

June 1, 2018 The #NRC has issued a second supplement to the agency's Environmental Impact Statement for the #IndianPoint

  1. nuclear power plant's license renewal application:

https://www.nrc.gov/docs/ML1810/ML18107A759.pdf - . The report provides an update on environmental issues.

June 1, 2018 NRC Verified account

@NRCgov 3h3 hours ago\

Arkansas Nuclear One plant in Russellville, Ark., will be returned to a normal level of oversight after a two-year journey to improve safety performance. https://www.facebook.com/nrcgov/posts/1848529268543858 -

June 4, 2018 An #NRC team will be at

  1. Pilgrim #nuclear plant this week to perform the third of five inspections as part of the agency's heightened oversight of the #Plymouth , Mass. facility:

https://www.nrc.gov/info-finder/reacto rs/pilg/special-oversight.html - . The focus will be the plant's corrective action program, human performance.

June 4, 2018

  1. Hurricane season began June 1 and runs through Nov. 30. To get a better idea of the ways in which the
  1. NRC and U.S.
  1. nuclear power plants prepare for hurricanes and other types of severe weather, the NRC has put together a new video:

https://www.youtube.com/watch?v=Lm9AaHtWw8A - .

June 11, 2018 We'll be accepting comments on the Post-Shutdown Decommissioning Activities Report (PSDAR) for the

  1. OysterCreek
  1. nuclear power plant until Sept. 10:

https://www.gpo.gov/fdsys/pkg/FR-2018-06-11/pdf/2018-12429.pdf - . The PSDAR contains key details on how Exelon intends to decommission the plant

. June 12, 2018

  1. NRC staff will discuss the 2017 safety performance of the #IndianPoint
  1. nuclear power plant during a public meeting on June 21 @Tarrytown. N.Y.: https://www.nrc.gov/reading-rm/doc-collections/news/2018/18-015.i.pdf

- . June 20, 2018

The #NRC will conduct a webinar for members of the public on July 2nd regarding decommissioning plans for the #OysterCreek

  1. nuclear power plant, in #Lacey Township (Ocean County), N.J.:

https://www.nrc.gov/reading-rm/doc-collections/news/2018/18-016.i.pdf - . Online registration is required to participate.

June 21, 2018

  1. IndianPoint meeting: Units 2 & 3 of nuclear plant operated safely in 2017, did not have any "greater than green" inspection findings, #NRC staff reports.

Like J June 21, 2018

  1. IndianPoint meeting: Unit 2 reactor vessel head leakage earlier in 2018 was thoroughly evaluated and appropriately repaired.

June 21, 2018 The #NRC is @Tarrytown, N.Y., providing information and answering questions about the safety performance of the #IndianPoint

  1. nuclear power plant.