AR Search Results for Tritium
ML100740217
Person / Time
Site: Oyster Creek
Issue date: 06/11/2009
From:
- No Known Affiliation
To:
NRC Region 1
References
FOIA/PA-2009-0214
Download: ML100740217 (107)


Text

Search of Ar Subject and Initial OLE 06/11/09 12:06 PM Facility: OYS Ar Number: 00907846 Orig Dept: 05332 Origination Date: 04/15/09 Ar

Subject:

TRITIUM IDENTIFIED IN ESW VAULT Gen Arg Blob Text 6 emitters, tritium, and pH. There were no gamma emitters identified, pH 7 was 7.62 and tritium was 102,000 pCi/I. The reporting threshold to thE 8 New Jersey DEP for tritium is 2,000 pCi/I.

12 release of tritium to the soil. It was also iterated that the water was 15 Additional samples were obtained for tritium analysis - drum of original

...........................................................................................................................................  ? ....................................................................................

Facility: OYS Ar Number: 00910538 Orig Dept: 05352 Origination Date: 04/22/09 Ar

Subject:

WATER IN THE INTAKE STRUCTURE CABLE MANHOLE.

Gen Arg Blob Text 47 samples tested positive for tritium. The sample findings and subsequent Facility: OYS Ar Number: 00911065 Orig Dept: 05331 Origination Date: 04/23/09 Ar

Subject:

CREW CLOCK RESET-INSUFFICIENT RP MANPOWER FOR SCHEDULED WORK Gen Arg Blob Text 23 drain in Condensate Storage Pump house looking for source of Tritium leak, 24 Set Up Core bore for Tritium monitoring wells, V-23 88-14 letterPost 27 (V-1 6-75). Shipping Tritium samples.

31 Emergent work required 2 Rad Pro techs to support the Tritium project.

Facility: OYS Ar Number: 00911185 Orig Dept: 08601 Origination Date: 04/24/09 Ar

Subject:

LONG TERM ACTION PLAN Gen Arg Blob Text 5 discovery of tritium in water located in the ESW cable vault on 4/15/09 8 objective was to respond to the emergent issue of a potential tritium 14 for final remediation plans (if needed) to address the 4/15/09 tritium 27 final remediation plan to address the tritium spill.

28 2. Transfer to station processes the final Action Plan for OC Tritium 38 Issue management team established to address tritium spill.

79 final remediation plan to address the tritium spill.

80 2. Transfer to station processes the final Action Plan for OC Tritium Facility: OYS Ar Number: 00912228 Orig Dept: 05351 Origination Date: 04/27/09 Ar

Subject:

LEAK FOUND IN 8 INCH CH-2 PIPE BELOW GRADE Gen Arg Blob Text 26 to evaluate tritium leak issues and resolutin.

39 Potential tritium reportable release.

68 address the overall tritium mitigation issue. Also, repairs and Facility: OYS Ar Number: 00912530 Orig Dept: 05351 Origination Date: 04/28/09 Ar

Subject:

TOPICAL REPORT 116 NEEDS REVISION Gen Arg Blob Text 25 Review of Topical report in support of tritium leak repair (IR 912228)

---. --.-. ------------.. -.---------. --.---------------------.......... L ............................................................ I............................. ................. . . .. .......... ---------

Facility: OYS Ar Number: 00912827 Orig Dept: 08801 Origination Date: 04/28/09 Ar

Subject:

NOS ID: TRITIUM LOGKEEPING NOT CONSISTENT WITH PROCEDURE Gen Arg Blob Text 5 NOS followed up on a false positive tritium analysis on a sample from the 8 tritium analysis do not accurately indicate the minimum detectable 11 The tritium log was reviewed and deficiencies were noted in the data 26 obtain a quick indication of the tritium level. Environmental samples 33 When the positive tritium result was found, then the chemist distilled the 34 sample and re-analyzed and no tritium was present. It was noted that the 52 Tritium analysis 57 Unclear standards for processing environmental tritium samples.

.64 Yes, false positive tritium results were reported to the NJDEP in 2008.

Search of Ar Subject and Initial OLE 06/11/09 12:06 PM Page 2 of 5 Facility: OYS Ar Number: 00912969 Orig Dept: 05332 )rigination Date: 04/29/09 Ar

Subject:

PCRA CY-OC-120-920 AOG Gen Arg Blob Text 112 78 Add aux tritium sampling to its own section and remove from section Facility: OYS Ar Number: 00913387 Orig Dept: 05352 )rigination Date: 04/29/09 Ar

Subject:

PIPE IN TRENCH WEST OF TGB SUSPECTED OF LEAKING Gen Arg Blob Text 45 05/01/09 LF - Verified via water sample results - gamma and tritium Facility: OYS Ar Number: 00913439 Orig Dept: 05352 )rigination Date: 04/29/09 Ar

Subject:

LEAK IDENTIFIED ON 1010 BURIED CONDENSATE TRANSFER PIPE Gen Arg Blob Text 14 This event is a part of the initial reporting of tritium at Oyster Creek.

24 to evaluate tritium leak issues and resolution.

37 Possible tritium release path 65 907846 to address the overall tritium mitigation issue. Engineerig will Facility: OYS Ar Number: 00914347 Orig Dept: 05332 Origination Date: 05/01/09 Ar

Subject:

LESSON LEARNED TRITIUM ANALYSIS IN THE HOT LAB Gen Arg Blob Text 4 On 04/29/09 tritium samples were taken for support of the tritium ACMP.

5 One of these sample had known tritium activity. When the samples were 6 distilled the sample with known tritium activity was distilled first after 7 a blank for cleanliness verification. After the sample with known tritium 12 runf The samples were distilled from the least amount of tritium based on 13 previous results to the highest amount of tritium based on previous 40 Coaching was provided to technicians and participants in tritium analysis Facility: OYS Ar Number: 00914375 Orig Dept: 05352 Origination Date: 05/01/09 Ar

Subject:

GUIDED WAVE PIPE INSP TECHNIQUE PROVIDED INCORRECT RESULTS Gen Arg Blob Text 8 potentially contributing to the tritium found in the sampling wells along Facility: OYS Ar Number: 00914938 Orig Dept: 05301 Origination Date: 05/02/09 Ar

Subject:

REVIEW ANOMOLOUS WELL SAMPLE ANALYSIS RESULTS Gen Arg Blob Text 5 Tritium investigation. -Chemistry sampling of the wells are being 6 performed weekly to monitor the Tritium levels in these wells. Original 25 ACMP - Chemistry sampling plan for Tritium Facility: OYS Ar Number: 00915473 Orig Dept: 08015 Origination Date: 05/04/09 Ar

Subject:

RECOVERY WELL INSTALLATION TO COLLECT IMPACTED GROUNDWATER Gen Arg Blob Text 4 Recent pipe leaks at Oyster Creek have resulted in tritium releases to 7 in the event tritium removal is required. Vendor support, New Jersey 26 Tritium in groundwater 32 Tritium in groundwater

.............................................-- ..------------------------------------------------------------------- m-----------------------------------------------------------------------------------------------------

Facility: OYS Ar Number: 00915953 Orig Dept: 05301 Origination Date: 05/05/09 Ar

Subject:

EVALUATE IF THE MONITORING WELL BE INCLUDED IN ODCM Gen Arg Blob Text 8 Based on the recent Tritium activity at the site, the question was raised


. I.-.-------------------------------------- .-.------------------------------------------------------------------------------ .-.---------------------------------------- .......................................

Facility: OYS Ar Number: 00916157 Orig Dept: 08801 Origination Date: 05/05/09 Ar

Subject:

NOS OBSERVATIONS OF PORC Gen Arg Blob Text 16 - A map of tritium results was not provided but was discussed, based upon

06111/09 12:06 PM Search of Ar Subject and Initial OLE uayo u.J Facility: OYS Ar Number: 00916807 Orig Dept: 05331 Origination Date: 05/07/09 Ar

Subject:

0917 & 0918 DAILY AND WEEKLY ADHERENCE DID NOT MEET GOAL Gen Arg Blob Text 16 - Tritium mitigation actions.

Facility: OYS Ar Number: 00916938 Orig Dept: 05332 Origination Date: 05/07/09 Ar

Subject:

NRC RECOMMENDS SAMPLING ADDITIONAL MONITORING WELL Gen Arg Blob Text 57 Condition Monitoring and Contingency Plan for the Elevated Tritium Facility: OYS Ar Number: 00918254 Orig Dept: 05352 Origination Date: 05/11/09 Ar

Subject:

PENETRATION SEALS DEGRADED 0 REPAIR BEFORE BACKFILLING Gen Arg Blob Text 63 5/14/09 TAP - Projects is including this work in the scope of the tritium Facility: OYS Ar Number: 00918708 Orig Dept: 05332 Origination Date: 05/12/09 Ar

Subject:

ISO COND RESULTS FOR TRITIUM NOT AS EXPECTED Gen Arg Blob Text 6 The results after the drain for tritium were:

8 The results after the filling for tritium were:

14 Samples were taken again and the results for tritium were:

Facility: OYS Ar Number: 00919194 Orig Dept: 05331 Origination Date: 05/13/09 Ar

Subject:

NOS ID PROMPT INVESTIGATION CAS NOT ENTERED INTO PASSPORT Gen Arg Blob Text .

34 of tritium in the isolation condenser shells.

Facility: OYS Ar Number: 00919411 Orig Dept: 08620 Origination Date: 05/13/09 Ar

Subject:

CONTRACTOR WORKING WITHOUT FULLY FUNDED RELEASES Gen Arg Blob Text 51 schedule after 1 F20 tritium leak leak repairs. The CST inspection WO is a 124 tritium leak. The work exceeded the release value in week 0919 after the 133 work was delayed one week due to the identification of the tritium leak Facility: OYS ArNumber: 00919705 Orig Dept: 05521 Origination Date: 05/14/09 Ar

Subject:

NOS ID: EXT. OPEX NOT DOCUMENTED IN ACES AND CCAS Gen Arg Blob Text 35 tritium leaks in the previous event review section of the ACE.

Facility: OYS . Ar Number: 00920928 Orig Dept: 05425 Origination Date: .05/18/09 Ar

Subject:

LL - REACTOR ENGINEERING 1F20 CRITIQUE Gen Arg Blob Text 39 flushing. The CRD exercise activities were coordinated with the tritium Facility: OYS Ar Number: 00922031 Orig Dept: 05361 Origination Date: 05/20/09 Ar

Subject:

TRNG - IMPROVEMENTS IDENTIFIED FOR PROCEDURE 101.4 Gen Arg Blob Text 12 expectations have changed since Oyster Creek and other tritium-related Facility: OYS Ar Number: 00922841 Orig Dept: 05332 Origination Date: 05/22/09 Ar

Subject:

PRESENCE OF XENON IN SAMPLE AT COND. EXCAVATION SITE Gen Arg Blob Text 5 sample was found to have positive activity for tritium and xenon-1 35 15 seen in the CSt samples. However, tritium and noble gases are not removed 20 Tritium, being an isotope of hydrogen is incorporated in the water 22 demineralizers do not remove water, and therefore do not remove tritium.

54 Therefore the water found in the pit containing tritium and xenon-135 is 64 Close to trend. IR submitted to document why only tritium and xenon-135

06/11/09 12:06 PM Search of Ar Subject and Initial OLE D- A f9 Facility: OYS Ar Number: 00924730 Orig Dept: 05332 Origination Date: 05/28/09 Ar

Subject:

SAFETY - HATCH AT INTAKE STRUCTURE IS STUCK CLOSED Gen Arg Blob Text 5 support the tritium ACMP requires chemistry technicians to lift a diamond 30 Sampling Intake structure for tritium monitoring m........---------.-.

and NJPDES permit Facility: OYS Ar Number: 00925296 Orig Dept: 05332 Origination Date: 05/29/09 Ar

Subject:

CHEMISTRY LAB VACUUM PUMP NEEDS REPAIR Gen Arg Blob Text 15 analysis within the lab and is currently being used to support the tritium..... .------ .---- .------- .----

Facility: OYS Ar Number: 00925996 Orig Dept: 05310 Origination Date: 05/31/09 Ar

Subject:

CCP - SITE WALKDOWN FOR ENVIRON CONCERNS Gen Arg Blob Text 70 asphalt and does not require catch containment. Item 4a - Site Tritium Facility: OYS Ar Number: 00926251 Orig Dept: 05332 Origination Date: 06/01/09 Ar

Subject:

WELL TESTING REQUIRED TO SUPPORT TRITIUM INVESTIGATION Gen Arg Blob Text Facility: OYS Ar Number: 00926303 Orig Dept: 05332 Origination Date: 06/01/09 Ar

Subject:

PM HAD TO BE RESCEDULED DUE TO RESOURCES Gen Arg Blob Text 6 the tritium ACMP. This work order has to be complete between the months Facility: OYS Ar Number: 00926338 Orig Dept: 05321 Origination Date: 06/01/09 Ar

Subject:

NOS ID: MAINTENANCE LINE OWNERSHIP OF TRAINING Gen Arg Blob Text 24 transformer failures, actions to remediate the tritium leakage have Facility: OYS Ar Number: 00926627 Orig Dept: 05322 Origination Date: 06/02/09 Ar

Subject:

PI PM.03 EQR2 IN VARIANCE FOR MAY, 2009 Gen Arg Blob Text 23 IR 907846 - TRITIUM IDENTIFIED IN ESW VAULT (PINV RCE)

Facility: OYS Ar Number: 00927310 Orig Dept: 05332 Origination Date: 06/03/09 Ar

Subject:

FALSE POSITIVE TRITIUM FROM ANALYSIS OF WELL WATER Gen Arg Blob Text -

7 accordance with CY-OC-1 30-530 "Tritium Analysis Liquid Samples". The 8 results of the analysis showed 83,000 pCi/L tritium. This result was 10 no detectable tritium, and that the well is located in an area not 25 Analysis of well water samples in accordance with CY-OC-1 30-530 "Tritium 37 ---............

procedure ( CY-OC-130-530 "Tritium Analysis Liquid Samples").

Facility: OYS Ar Number: 00927369 Orig Dept: 05301 Origination Date: 06/03/09 Ar

Subject:

NEI NOT FORMALLY NOTIFIED PER RAD 1.34 FOR TRITIUM LEAK Gen Arg Blob Text 4 Following the positive sample for elevated tritium level in the ESW cable 19 of RAD 1.34 for the tritium event.

Search of Ar Subject and Initial OLE 06/11/09 12:06 PM Page 5 of 5 Facility: OYS Ar Number: 00928211 Orig Dept: 05301 Origination Date: 06/05/09 Ar

Subject:

TRITIUM RESULTS FROM UNDERGROUND VAULT INSPECTIONS Gen Arg Blob Text 7 Tritium Sample analysis were performed on water found in electrical vaults 10 Two out of four vaults were found with Tritium activity:

14 the vicinity of the other Monitoring wells in review for the Tritium 18 vault has had history of Tritium activity in the past - in the vicinity of 31 tritium inspection and Iso-condenser activities 42 with other vaults including potential contributers of Tritium activity in

Remote User TAYLCC http://eamgenco.ceco.com/cap/servlet/Rep 06/19/09 12:26 PM i??? ??i?

.... i?:

iii? ??i? i???? iiii.........:  :::

..........! !;~i i ii i ii i

== == ==. ..........

.................. = ==*:  :* : ;: :; :;

.. ................. =...

AR - Assignment Report PagelI of 5 Go Back Print I New Search Home AR 00907846 Report Aft Fac: Oyster Creek AR Type: CR Status: APPROVED Aft Unit: NA Owed To: A5351CAP Due Date: 08/20/2009 Aft System: -- Event Date: 04/15/2009 CR 3/A Disc Date: 04/15/2009 Level/Class:

How H02 Orig Date: 04/15/2009 Discovered:

WR/PIMS AR: A2222268 Component #: 424 Action Request Details

Subject:

TRITIUM IDENTIFIED IN ESW VAULT

Description:

Originator: MATTHEW J NIXON Supv Contacted: Jhansi Kandasamy Condition

Description:

In preparation for work inside the Emergency Service Water vault, water found inside the vault was pumped into drums and sampled for gamma emitters, tritium, and pH. There were no gamma emitters identified, pH was 7.62 and tritium was 102,000 pCi/I. The reporting threshold to the New Jersey DEP for tritium is 2,000 pCi/l.

Immediate actions taken:

The New Jersey DEP was notified of the sample results and a potential.

release of tritium to the soil. It was also iterated that the water was contained in a concrete vault and being pumped into drums.

A prompt investigation (PINV) was initiated.

Additional samples were obtained for tritium analysis - drum of original water from vault, drum of current water being transferred from vault, and a sample from the vault.

Normancleau Associates were contacted to pick up duplicate samples for analysis by Teledyne Brown Engineering.

Recommended Actions:

Complete PINV. Identify potential sources.

What activities, processes, or procedures were involved?

Sampling of vault water prior to discharge.

Why did the condition happen?

Unkown What are the consequences?

Reported to New Jersey DEP as potential reportable release.

Were any procedural requirements impacted?

N/A Were there any adverse physical conditions?

Unkown List of knowledgeable individuals:

Jhansi Kandasamy Leanne Birkmire http://eamgenco.ceco.con~caD/servlet/RenortARServlet. ~iown A*I/ a/1) ()()a

AR - Assignment Report Page 2 of 5 Matt Nixon Jay Vouglitios Repeat or similar condition?

No Operable Basis:

N/A Reportable Basis:

OP-AA-106-101 notifications were made to NJ Dept of Env Prot, ENS notifications made to NRC, PINV Reviewed by: HERBERT G TRITT II 04/16/2009 04:18:16 CDT Reviewer Comments:

none SOC Reviewed by: THOMAS S LONSDALE 04/21/2009 09:18:46 CDT SOC Comments:

CONDENSATE TRANSFER WATER SYSTEM-11,CH 04/17/09 SOC: Follow-up Chemistry 4/20/09 TAP - Significance level 3 due to Contamination above normal levels resulting from unplanned events.

4/21/09 RCL: Environmental keyword added. PINV complete. Sig 3 due to contaimination above normal levels resulting from unplanned eventes.

Complex troubleshooting action plan (CTSAP) in progress and asssiged. Risk High - Uncertainty Med, engineering will per a Root Cause Evaluations, Class A. Close to Root Cause assignments made, PINV, CTSAP, and PIMS AR A2222268 pulled through.

Dynamic AR Attributes CAP QUALTY REJECT: 5 KEYWORD: Environmental MRC SCREEN DATE: 20090619 Trend Codes TC1 TC2 TC3 Proc Org Rank EQM PIP * * *P 3M 4SL 5NS *

  • 3M 4SL 5CI *
  • 3D 4PR 5NI *
  • 3M 40E 51F *
  • 3M 4SL 5CI *
  • 3C 4TL 5TP *
  • Assignments Assign #: 01 Assigned To: Status: COMPLETE Aft Fac: Oyster Creek Prim Grp: ACAPALL Due Date: 04/20/2009 Assign Type: TRKG Sec Grp: Orig Due Date:

http):Heamaenco.ceco.com/caD/servlet/RCnortARServiet 611/iQ/gnI3Q

//00

AR - Assignment Report Page 3 of 5 Priority:

Schedule Ref:

Unit Condition:

Subject/Description: TRITIUM IDENTIFIED IN ESW VAULT Assign #: 02 Assigned To: U000PO3 Status: COMPLETE Aft Fac: Oyster Creek Prim Grp: A5332CHEM Due Date: 04/20/2009 Assign Type: PINV Sec Grp: Orig Due Date: 04/20/2009 Priority:

Schedule Ref:

Unit Condition:

Subject/DescIription: Perform PINV following Management approval, submit to NDO Mailbox and NRC Resident.

Assign #: 03 Assigned To: U7,77KCL Status: ACC/ASG Aft Fac: Oyster Creek Prim Grp: A5351NESPR Due Date: 07/28/2009 Assign Type: FMCT Sec Grp: Orig Due Date: 05/28/2009 Priority:

Schedule Ref:

Unit Condition:

Si Complete CTSAP for buried pipe leak. Post the CTSAP to the corporate engineeing Subject/Description: website after all legs of the CTSAP have been completed or ruled out.

Assign #: 04 Assigned To: U998RL8 Status: COMPLETE Aft Fac: Oyster Creek Prim Grp: A5351NESPR Due Date: 04/24/2009 Assign Type: RCCH Sec Grp: Orig Due Date: 04/24/2009 Priority:

Schedule Ref:

Unit Condition:

Subject/Description: Create Root Cause Charter Assign #: 05 Assigned To: U998RL8 Status: COMPLETE Aft Fac: Oyster Creek Prim Grp: A5351NESPR Due Date: 05/01/2009 Assign Type: MRC Sec Grp: Orig Due Date: 04/27/2009 Priority:

Schedule Ref:

Unit Condition:

Subject/Description: Present Root Cause Charter to MRC Assign #: Assigned To: NRSTY Status: COMPLETE http://eamgenco.ceco.com/cap/servlet/ReportARServlet 6/19/2009

AR - Assignment Report Page 4 of 5 06 Aff Fac: Oyster Creek Prim Grp: A5351NESPR Due Date: 05/05/2009 Assign Type: ACIT Sec Grp: Orig Due Date: 05/05/2009 Priority:

Schedule Ref:

Unit Condition:

Subject/Description: Create two week update on Root Cause Assign #: 07 Assigned To: NRSTY Status: COMPLETE Aft Fac: Oyster Creek Prim Grp: A5351NESPR Due Date: 05/07/2009 Assign Type: MRC Sec Grp: Orig Due Date: 05/06/2009 Priority:

Schedule Ref:

Unit Condition:

Subject/Description: Present two .week update to MRC Assign #: 08 Assigned To- NRSTY Status: COMPLETE Aft Fac: Oyster Creek Prim Grp: A5351NESPR Due Date: 06/08/2009 Assign Type: RCR Sec Grp: Orig Due Date: 05/26/2009 Priority:

Schedule Ref:

Unit Condition:

Subject/Description: Complete Root Cause Report Assign #: 09 Assigned To: NRSTY Status: COMPLETE Aft Fac: Oyster Creek Prim Grp: A5351NESPR Due Date: 06/19/2009 Assign Type: MRC Sec Grp: Orig Due Date: 06/09/2009 Priority:

Schedule Ref:

Unit Condition:

Subject/Description: Present RCR to MRC Assign #: 10 Assigned To: NRSTY Status: COMPLETE Aft Fac: Oyster Creek Prim Grp: A5351NESPR Due Date: 06/05/2009 Assign Type: NER Sec Grp: Orig Due Date: 05/19/2009 Priority:

Schedule Ref:

Unit Condition:

http://eamgenco.ceco.com/cap/servlet/ReportARServlet 6/19/2009

AR - Assignment Report Page 5 of 5 Subject/Description: Review For NER and submit to Reg Assurance.

Assign #: 11 Assigned To: U777RBG Status: COMPLETE Aft Fac: Oyster Creek Prim Grp: A5351NESPR Due Date: 05/05/2009 Assign Type: OTDM Sec Grp: Orig Due Date: 05/05/2009 Priority:

Schedule Ref:

Unit Condition:

Subject/Description: Prepare and issue OTDM for leak in condenate transfer system piping Assign #: 12 Assigned To: U998LC9 Status: COMPLETE Aft Fac: Oyster Creek Prim Grp: A5331RP Due Date: 08/20/2009 Assign Type: ACIT Sec Grp: Orig Due Date: 08/20/2009 Priority:

Schedule Ref:

Unit Condition:

Subject/Description: Enter Release results in 50.75G file index Assign #: 13 Assigned To: NRSTY Status: COMPLETE Aft Fac: Oyster Creek Prim Grp:- A5351CAP Due Date: 07/06/2009 Assign Type: NNOE Sec Grp: Orig Due Date: 07/06/2009 Priority:

Schedule Ref:

Unit Condition:

Subject/Description: Issue NNOE to Reg Assurance for processing http://eamgenco.ceco.com/cap/servlet/ReportARServlet 6/19/2009

Remote User TAYLCC http://eamgenco.ceco.com/cap/servlet/Rep 06/19/09 12:27 PM

====== === = == = =........*.. ... ... . . ..

AR - Assignment Report Page I of 3 O Go Back Print INew Search Home AR 00910538 Report Aft Fac: Oyster Creek AR Type: CR Status: APPROVED Aft Unit: 01 Owed To: A5352CAP Due Date: 05/22/2009 Aft System: 730 Event Date: 04/14/2009 CR 4/D Disc Date: 04/15/2009 Level/Class:

How H02 Orig Date: 04/22/2009 Discovered:

WR/PIMS AR: Component #: 731 Action Request Details

Subject:

WATER IN THE INTAKE STRUCTURE CABLE MANHOLE.

Description:

Originator: RAJENDER K PRUTHI Supv Contacted: Dan Barnes Condition

Description:

During the preparation of the cable replacement for Emergency Service Water (ESW) pump motor 1-2, water was found in the Intake Structure cable manhole (MH-731-1).

Intake Structure manhole provides a structure through which several medium voltage (4160V) and low voltage cables are routed. These cables provide power and control to various equipments located at the Intake Structure area such as 4160V rated ESW pump motors, Circulating water pump motors, USS 1A3, USS 1B3. Circulating Water pump motor and ESW pump motor cables are spliced in this manhole. The manhole is estimated to be about 12 feet deep. Water level was estimated to be about 10 inches deep. All medium voltage cables and cable splices were reported to be above water level and thus not immersed. All previous inspections had indicated a water level of about 2 to 3 inches.

In addition to the ESW 1-2 cable replacement, efforts are underway to replace cables for ESW 1-1. All replacement cables will consist of continuous cable runs, with no cable splices.

Cable duct D-102 was observed to be leaking water in the manhole. This duct is located at the bottom of the East wall of the manhole. It is in the middle of the three ducts at this location. A review of the physical drawings (BR 3180, section N-N and BR 3179) and the cable data information indicates that following circuits are routed through this duct:

1. 21-1844, interlock from service water pump 1-1 to chlorination controls.
2. 21-1845, interlock from service water pump 1-2 to chlorination controls.

Each circuit is 2/C, #12AWG control cable, 120VAC. Insulation is rated for 600V.

Duct D-102 is routed adjacent to the condensate storage tank and the associated piping.

There are no visible signs of any degradation or damage to the cable jackets/insulation that could adversely affect the cables from performing their function.

httn://eam ~enco c~cn rnm/c~n/~~rv1~t/P ~nnrt AR ~pr~rl ~t '</1 C* Iq/*)nn

AR - Assignment ReportP Page 2 of 3 Immediate actions taken:

Water was pumped from the manhole into drums and sampled by Chemistry. The samples tested positive for tritium. The sample findings and subsequent actions are documented in IR 907846. Cables were inspected visually by the work group.

Contacted supervisor.

Recommended Actions:

No new action is recommended at this point. All medium voltage cable manholes including the subject manhole are inspected on a periodic basis for the presence of water and pumping out where required. Reference PM73107E. This inspection is part of the Oyster Creek license renewal commitment. The commitment requires inspection at a frequency of 2 years.

However, as of March 2009, the frequency has been increased to a quarterly, basis.until a trend for water accumulation can be established that would determine future recommended actions.

The root cause of the water leak is being tracked under IR 907846.

What activities, processes, or procedures were involved?

Replacement of power feed cables to ESW pomp motor 1-2.

Why did the condition happen?

Ground/rain water/potential underground piping leak.

What are the consequences?

1. Medium voltage cables.

Based on the visual inspection of the cables, the cable insulation/jacket was found to be in good condition. All cable jacket and insulation materials are water resistant. All medium voltage cables including the 4160V cables routed through the subject manhole are tested periodically.

Latest test results indicate that all cables are in a satisfactory condition. Periodic testing of the 4160V cables has been in place at Oyster Creek since early 1990s. The periodic testing will continue as part of the OC License renewal commitment. The current testing program includes testing of the 4160V, 13.8KV (SBO) and 34.5KV (Start up X-former) power feed cables. Most commonly used testing methodology is the on-line partial discharge (cablewise) test.

2. Low voltage cables:

The cables are control or power application with the insulation/jacket rating of 600V. Historically, moisture has not caused failure of such cables due to the following reasons.

The cables are rated for 90 degrees C. Typically they carry very small percentage of their current values. Therefore, they do not experience any significant heating.

The voltage level is significantly lower than the insulation rated value of the cables. Hence the insulation stress level is low.

Typically the cables are non-shielded.

EPRI report TR-103834-P1-2, 1994, page 2.1-2, (Effect of moisture on Life of Power Plant cables) conducted a survey of several users and manufacturers of low voltage power cables. The preponderance of the feedback suggests that moisture related failures of low voltage power httn://eamg~enco-c~~~o-rcm/c.,qn/e.~rvif-.t[Ri-.nnrt A P.qPrvi4pt AlO~(

AR - Assignment Report Page 3 of 3, plant cables do not generally occur.

Were any procedural requirements impacted?

None Were there any adverse physical conditions?

Potential adverse affects to the environment and cables due to the unknown source of water intrusion.

List of knowledgeable individuals:

Raj Pruthi, Dan Barnes, Dave Jones.

Repeat or similar condition?

Yes. IR's 890453, 828327, 469998.

Operable Basis:

The water accumulation in the manhole is below the level of the ESW cabling and has no affect on the design function of the ESW system.

Quarterly inspections are being conducted to ensure this water intrusion does not impact the safety related system. Cabling and ESW systems remain OPERABLE. Referred to OP-AA-108-115, Operability Determinations and OP-AA-108-115-1002, Supplemental Consideration for On-Shift Immediate Operability Determinations.

Reportable Basis:

Does not meet threshold for reportability per Exelon Reportability Manual.

Reviewed by: CARL J SUCHTING 04/22/2009 22:08:44 CDT Reviewer Comments:

none Reviewed by: GARY G FLESHER 04/23/2009 23:14:21 CDT Reviewer Comments:

Reconsidered operability statement based on significance of cabling in this manhole.

SOC Reviewed by: RALPH C LARZO 04/24/2009 08:12:30 CDT SOC Comments:

4/24/09 RCL: Close to actions taken and IR 907846 that is performing a RCE.

Trend Codes TC1 TC2 TC3 Proc Org Rank EQE CAB * *

  • P Assignments Assign #: 01 Assigned To: Status: COMPLETE Aft Fac: Oyster Creek Prim Grp: ACAPALL Due Date: 04/27/2009 Assign Type: TRKG Sec Grp: Orig Due Date: pp/pp/pppp Priority:

Schedule Ref:

Unit Condition:

Subject/Description: WATER IN THE INTAKE STRUCTURE CABLE MANHOLE.

httD :HeamL)enco.ceco.com/caD/servl etIR enortAPRSe~rvie~t Wll 0/1)nno IQ1fA

Remote User TAYLCC http://eamgenco.ceco.com/cap/serviet/Rep 06/19/09 12:28 PM

==

====

=

==. . . . .. :. . . .. *....... .. ... . .. ... . .

.......... = .........

........... = == == == = =

.............. ..=

=== = ..

: = .... = == = = == = == = =
'..... . ...................=

~~i iii! i~i ii ii !i ii i~ i::  : :: : :: . :: . : . ::. .: .:: . :::.:.::

AR - Assignment Report *Page I of 3 0 Go Back Print INew Search, Home AR 00911065 Report Aff Fac: Oyster Creek AR Type: CR Status: COMPLETE Aft Unit: 01 Owed To: A5331CAP Due Date: 05/29/2009 Aft System: -- Event Date: 04/22/2009 CR 4/D Disc Date: 04/22/2009 Level/Class:

How H02 Orig Date: 04/23/2009 Discovered:

WR/PIMS AR: Component #:

Action Request Details

Subject:

CREW CLOCK RESET-INSUFFICIENT RP MANPOWER FOR SCHEDULED WORK

Description:

Originator: ROBERT A HEFFNER Supv Contacted: John Renda Condition

Description:

Scheduled work plus emergent work exceeded the manpower resources of the radiation protection department to provide radiological job coverage.

Radiation Protection Supervisor did not schedule sufficient personnel to cover all work.

Immediate actions taken:

Radiation Protection technicians were reassigned to priority work.

Workweek manager notified.

Recommended Actions:

Analyze manpower needs to cover all work of scheduled and emergent work that has come into the workweek. Request overtime if number of personnel is insufficient to cover all work. If personnel are not sufficient on day of execution, consult work week manager for priority and resolution.

What activities, processes, or procedures were involved?

The following issues were requested for Rad Pro coverage:

Containment Spray Hx Sys II cleaning -(7 day LCO), HCU 50-31 &38-47 1-5 Condensate Demin Tank clean-out, CH-AO-32A Troubleshoot, Boroscope drain in Condensate Storage Pump house looking for source of Tritium leak, Set Up Core bore for Tritium monitoring wells, V-23 88-14 letter,Post TIP Machines (pushed to next week), 4160 volt breaker release from RCA, RCA crane monthly PM inspections, Shipping samples for failure analysis (V-16-75). Shipping Tritium samples.

Why did the condition happen?

  • There was no flexibility in the daily allottment of personnel:

Emergent work required 2 Rad Pro techs to support the Tritium project.

Continuing Training had 4 personnel assigned, therefore not available to cover work.

What are the consequences?

Work not performed on schedule.

List of knowledgeable individuals:

Robert Heffner, John Murphy http)://eamgenco.ceco.com/caD/servlet/Ret~ortARServlet t/O9O 6/11Q19000

AR - Assignment ReportP Page 2 of 3 Operable Basis:

N/A Reportable Basis:

N/A Reviewed by: HERBERT G TRIlT II 04/23/2009 17:41:09 CDT Reviewer Comments:

none SOC Reviewed by: LYNDA FILEPPI 04/26/2009 11:19:45 CDT SOC Comments:

04/26/09 LF - Close to actions created and crew clock reset.

Dynamic AR Attributes CREW RESET1: RP Dayshift Trend Codes TC11 TC2 TC3 Proc Org Rank EOR201 *

  • RP13 RPRO P 3MWP *
  • RP13 RPRO F-WC W-SCH
  • RP13 RPRO Assignments Assign #: 01 Assigned To: Status: COMPLETE Aft Fac: Oyster Creek Prim Grp: ACAPALL Due Date: 04/28/2009 Assign Type: TRKG Sec Grp: Orig Due Date: pp/pp/ppl~p Priority:

Schedule Ref:

Unit Condition:

Subject/Description: CREW CLOCK RESET-INSUFFICIENT RP MANPOWER FOR SCHEDULED WORK Assign #: 02 Assigned To: U777RAH Status: COMPLETE Aft Fac: Oyster Creek Prim Grp: A5331RP Due Date: 05/29/2009 Assign Type: ACIT Sec Grp: Orig Due Date: 05/29/2009 Priority:

Schedule Ref:

Unit Condition:

Review the following for inclusion into the RP "Monster" schedule - RPS for work week analyze manpower needs to cover all work of scheduled'and emergent work that has Subject/Description: come into the workweek. Request overtime if number of personnel is insufficient to cover all work. If personnel ar e not sufficient on day of execution, consult work week manager for priori ty and resolution.

Assign #: 03 Assigned To: U777RAH Status: COMPLETE http://eamgenco.ceco.com/cap/servlet/RelportARServlet 6/19/2009

AR - Assignment Report Page 3 of 3 Aft Fac: Oyster Creek Prim Grp: A5331RP Due Date: 05/08/2009 Assign Type: ACIT Sec Grp: Orig Due Date: 05/08/2009 Priority:

Schedule Ref:

Unit Condition:

Subject/Description: Complete crew clock reset actions per In Progress Notes.

http://eamgenco.ceco.com/cap/servlet/ReportARServlet 6/1 ql213Cl

Remote User TAYLCC http://eamgenco.ceco.com/cap/servlet/Rep 06/19/09 12:28 PM

.....................................................i

======= === = == ............. ... .... ...

...... . ....ii~

.... .... ... ............=

==== .......

AR - Assignment Report Page 1 of 3 O Go Back Print New Search Home AR 00911185 Report Aft Fac: Oyster Creek AR Type: CR Status: COMPLETE Aff Unit: NA Owed To: A5301CAP Due Date: 06/16/2009 Aft System: -- Event Date: 04/24/2009 CR 5/D Disc Date: 04/24/2009 Level/Class:

How H02 Orig Date: 04/24/2009 Discovered:

WR/PIMS AR: Component #:

Action Request Details

Subject:

LONG TERM ACTION PLAN

Description:

Originator: STEVIE G DUPONT Supv Contacted: J. Barstow Condition

Description:

An Issue Management Response Team was initiated in response to the discovery of tritium in water located in the ESW cable vault on 4/15/09 (IR 907846). The team consisted of a communication, environmental, regulatory, root cause and technical functions. The teams primary objective was to respond to the emergent issue of a potential tritium release and enquiries from both state and federal regulatory agencies.

As a proactive action, transitions to longer termed actions should be planned and implemented as part of the exit strategy for the response team. These strategies should include the development and recommendations for final remediation plans (if needed) to address the 4/15/09 tritium spill and transfer of outstanding response team actions.

The root cause function of the response team will continue as bounded by the CAP assignment (IR 907846-08).

Immediate actions taken:

Generated this IR Recommended Actions:

Issue Management Response Team develop an exit strategy for transfer of actions from issue management to site processes to include:

1. Provide to station management recommendations, with pro and cons, for a final remediation plan to address the tritium spill.
2. Transfer to station processes the final Action Plan for OC Tritium Management (include the action plan in the in-progress notes of this IR).
3. Transfer responsibility to address all open.actions on the Action Plan to the OCC for follow up and resolution.

What activities, processes, or procedures were involved?

Issue management.

Why did the condition happen?

Issue management team established to address tritium spill.

What are the consequences?

Regulatory and public margin.

httD://eamg~enco-ceco-com/caqn/.-erv e~tfR enort AR Serviet 1ý10/(0

/ 10 /1) (Q

AR - Assignment Report Page 2 of 3 Were any procedural requirements impacted?

none Were there any adverse physical conditions?

Adverse conditions are captured by IR 907846 List of knowledgeable individuals:

Z, Karpa, M. Snow; T. Farenga, S. Du Pont Repeat or similar condition?

No Operable Basis:

N/A Reportable Basis:

N/A Reviewed by: THOMAS J BUSK 04/24/2009 09:39:37 CDT Reviewer Comments:

None SOC Reviewed by: JAMES KERR 05/04/2009 08:56:20 CDT SOC Comments:

follow up reg assurance.

4/28/09 - S. Du Pont - Issue Management team developed a exit strategy, including a plan to provide recomendation for a final remediation plan.

The recommendations will include the pro and cons of each proposal. The exit strategy was briefed by the team manager and senior station officials. Assignment swere generated to ensure that the remediation plan is presented to station management , that the final action plan is captured in the CAP process and that responsibility for any open issus are transfered to responsible site departments for resolution.

1. Provide to station management recommendations, with pro and cons, for a final remediation plan to address the tritium spill.
2. Transfer to station processes the final Action Plan for OC Tritium Management (include the action plan in the in-progress notes of this IR).
3. Transfer responsibility to address all open actions on the Action Plan to the OCC for follow up and resolution.

4/30/09 SOC - Close to assignments created.

5/4/09 jek (MRC) Back to SOC to re-evaluate Class 4D.

5/18/09 jek. Spoke to originator today and agreed that this should be a 5D since there is no deficiency represented by this IR (it is just documenting an action plan).

Assignments Assign #: 01 Assigned To: Status: COMPLETE Aft Fac: Oyster Creek Prim Grp: ACAPALL Due Date: 05/05/2009 Assign Type: TRKG Sec Grp: Orig Due Date: 04/29/2009 Priority:

httn~//e~mQenro cern com/c~n/.~erv1etIR enort AR ~erv1~t ~vi 61,1 onnno I a/1 I MIQ

AR - Assignment Report Page 3 of 3 Schedule Ref:

Unit Condition:

Subject/Description: LONG TERM ACTION PLAN Assign #: 02 Assigned To: DUPOSG Status: COMPLETE Aft Fac: Oyster Creek Prim Grp: A5301RAPR Due Date: 05/29/2009 Assign Type: ACIT Sec Grp: Orig Due Date: 05/29/2009 Priority:

Schedule Ref:

Unit Condition:

Ensure that the Issue Management Team transfer to station processes the final Action Subject/Description: Plan for OC Tritium Management (include the action plan in the in-progress not es of this IR).

Assign #: 03 Assigned To: DUPOSG Status: COMPLETE Aft Fac: Oyster Creek Prim Grp: AS301RAPR Due Date: 05/29/2009 Assign Type: ACIT Sec Grp: Orig Due Date: 05/29/2009 Priority:

Schedule Ref:

Unit Condition:

Ensure Issue Mangament Team transfer responsibility to ad dress all open actions on the Subject/Description: Action Plan to the OCC for follow up and resolution.

Assign #: 04 Assigned To: DUPOSG Status: COMPLETE Aft Fac: Oyster Creek Prim Grp: A5301RAPR Due Date: 05/29/2009 Assign Type: ACIT Sec Grp: Orig Due Date: 05/29/2009 Priority:

Schedule Ref:

Unit Condition:

Ensure that the Issue Management Team provides to station management Subject/Description: recommendations, with pro and cons, for a final remediation plan to address the tritium spi ll Assign #: 05 Assigned To: U001JOB Status: COMPLETE Aft Fac: Oyster Creek Prim Grp: A5301EP. Due Date: 06/16/2009 Assign Type: MREQ Sec Grp: Orig Due Date: 06/16/2009 Priority:

Schedule Ref:

Unit Condition:

Subject/Description: Manager Closeout Review.

httn://e~jmpy,fnco-ce~co-com/cnn/-se-rvle~t/Rf nortAR ýe~rvie-t //00 6/1lQ/?.onq

Remote User TAYLCC http://eamgenco.ceco.com/cap/serviet/Rep 06/19/09 12:29 PM

. . . . .. .. . . . .. . . . .. . . .. . .. . . . . .. .. . . . . . .. :i:

AR - Assignment Report Page I of 3 O Go Back Print INew Search Home AR 00912228 Report Aft Fac: Oyster Creek AR Type: CR Status: COMPLETE Aft Unit: 01 Owed To: A5351CAP Due Date: 06/18/2009 Aft System: 421 Event Date: 04/25/2009 CR 3/B Disc Date: 04/25/2009 Level/Class:

How H02D Orig Date: 04/27/2009 Discovered:

WR/PIMS AR: Component #: CH-2 Action Request Details

Subject:

LEAK FOUND IN 8 INCH CH-2 PIPE BELOW GRADE

Description:

Originator: ROGER B GAYLEY Supv Contacted: R. Larzo Condition

Description:

While excavating, in an East-West direction along the Condensate Transfer Pump house North wall, A leak was discovered in the 8-inch diameter carbon steel, schedule 40, CH-2 Line located approximately three feet below grade. The leak is located at the bottom of the pipe and is estimated to be 5/8 inch in diameter.

UT was performed on the pipe in the vicinity of the leak and nominal was thickness was generally found except for an area radiating about three to four inches from the hole where significant corrosion was found.

Immediate actions taken:

OCC notified Pipe was ultrasonically tested to characterize pipe condition.

Temporary clamshell seal applied to pipe which stopped the leak.

Recommended Actions:

Permanent repairs are being performed under IR 907846 prior to startup from 1F20. Also, a root cause evaluation is being performed on IR 907846 to evaluate tritium leak issues and resolutin.

Perform an EACE on failed piping on this IR to include extent of condition.

What activities, processes, or procedures were involved?

Excavating to locate pipe leak Why did the condition happen?.

Possible coating dgradation and resultant corrosion What are the consequences?

Potential tritium reportable release.

Were any procedural requirements impacted?

httD:Heamgenco.ceco.com/c~qn/.-erv1 et/R entrt AR Sef-rvli-.t f1Q90 611/i019/(/

AR - Assignment Report Page 2 of 3 N/A Were there any adverse physical conditions?

Unkown List of knowledgeable individuals:

Howie Ray. R.ick Skelskey Repeat or similar condition?

Yes, refer to IR 907846 Operable Basis:

N/A Reportable Basis:

N/A Reviewed by: GARY G FLESHER 04/27/2009 15:06:53 CDT Reviewer Comments:

OCC notified SOC Reviewed by: RONALD W FITTS 04/29/2009 10:03:24 CDT SOC Comments:

CONDENSATE PUMP DISCHARGE 4/28/09 RCL: A Root Cause Evaluation is being performed on IR 907846 to address the overall tritium mitigation issue. Also, repairs and inspections are being address on various work orders on IR 907846. This IR will specifically address the causes and corrective actions associeated with the leak found on the CH-2 8" line that was the major source of the leak. Risk-Uncertainty Med/Med, Engineering to perform an EACE. Close to EACE assignment.

4/29/09 SOC - Sig 3 due to extension to outage of greater than 1 day.

Dynamic AR Attributes KEYWORD: Environmental Trend Codes TC1 TC2 TC3 Proc Org Rank EQM PIP

  • ER60
  • P Assignments Assign #: 01 Assigned To: Status: COMPLETE Aff Fac: Oyster Creek Prim Grp: ACAPALL Due Date: 05/02/2009 Assign Type: TRKG Sec Grp: Orig Due Date: pp/pp/pppp Priority:

Schedule Ref:

Unit Condition:

Subject/Description: LEAK FOUND IN 8 INCH CH-2 PIPE BELOW GRADE httn://eamg'enco.ceco-corn/caqn/sf.rvlf-.t[Rf-nnrt AR,'Ri-rvii-.t 41Ql 1ý/l 10 /1 ()I()Q

AR - Assignment Report Page 3 of 3 ,

Assign #: 02 Assigned To: U777KCL Status: CANCELED Aft Fac: Oyster Creek Prim Grp: A5351NESPR Due Date: 06/04/2009 Assign Type: EACE Sec Grp: Orig Due Date: 06/04/2009 Priority:

Schedule Ref:

Unit Condition:

Complete EACE on causes and corrective action for CH-2 pi pe leak. Note: This EACE to Subject/Description: include the leak from the 10" condensate transfer piping as documented in IR 913439 (R. Larzo)

Assign #: 03 Assigned To: U777KCL Status: CANCELED Aft Fac: Oyster Creek Prim Grp: A5351NESPR Due Date: 06/18/2009 Assign Type: MRC Sec Grp: Orig Due Date: 06/18/2009 Priority:

Schedule Ref:

Unit Condition:

Subject/Description: Present EACE to MRC.

http://eam2enco.ceco.com/caD/servlet/ReportARServlet 6/19/2009

Remote User TAYLCC http://eamgenco.ceco.com/cap/servlet/Rep 06/19/09 12:29 PM

iiiii i][!i! iii...:........~

iiiii

AR - Assignment Report Page I of 2 O Go Back Print I New Search Home AR 00912530 Report Aft Fac: Oyster Creek AR Type: CR Status: APPROVED Aft Unit: NA Owed To: A5351CAP Due Date: 06/24/2009 Aft System: -- Event Date: 04/27/2009 CR 4/D Disc Date: 04/27/2009 Level/Class:

How H02 Orig Date: 04/28/2009 Discovered:

WR/PIMS AR: Component #:

Action Request Details

Subject:

TOPICAL REPORT 116 NEEDS REVISION

Description:

Originator: ROGER B GAYLEY Supv Contacted: R. Skelskey Condition

Description:

Topical Report 116, "Oyster Creek Underground Piping Program Description and Status" Rev 3, requires revision. This is based on replacement of a thirty foot section of the 8 inch diameter, carbon steel, "CH-2" pipe run from the condensate transfer house toward the turbine building penetration. The replacement was performed during 1F20 after a hole was discovered in the line (IR 912228).

Appendix 4, ID SS-4, needs to be deleted because the CH-2 line was not replaced with stainless steel during 1992 as is stated. ID CS-25, the CH-2 line in Appendix 4 needs to be revised to reflect the fact that the line is carbon steel, comments and action need to be revised.

Immediate actions taken:

Discussed with Engineering Management Wrote IR Recommended Actions:

Revise Topical report 116 as discussed in description above.

What activities, processes, or procedures were involved?

Review of Topical report in support of tritium leak repair (IR 912228)

Why did the condition happen?

Information in Topical Report was not verified What are the consequences?

Inaccurate report that can mislead actions.

Were there any adverse physical conditions?

None List of knowledgeable individuals:

P. Tamburro, R. Gayley, R. Skelskey Operable Basis:

n/a httn//h-.nmcre~nco c-ntir~n/n/-zi~rvlp~tfR cnnvt AR .'~irvlpt r'll/1 Q/ona I1GlfO

AR - Assignment Report Page 2 of 2 Reportable Basis:

n/a Reviewed by: THOMAS A DUNN 04/28/2009 13:37:14 CDT Reviewer Comments:

Reviewed by: THOMAS A DUNN 04/28/2009 13:47:02 CDT Reviewer Comments:

Reviewed by: THOMAS A DUNN 04/28/2009 13:52:10 CDT Reviewer Comments:

SOC Reviewed by: RALPH C LARZO 04/28/2009 15:28:21 CDT SOC Comments:

4/28/09 RCL: ACIT to engineering to revise topical report. Close to ACIT.

Trend Codes TC1 TC2 TC3 Proc Org Rank 3M 4SL 5DP * *P Assignments Assign #: 01 Assigned To: Status: COMPLETE

-Aft Fac: Oyster Creek Prim Grp: ACAPALL Due Date: 05/03/2009 Assign Type: TRKG Sec Grp: Orig Due Date: pp/pl/pppp Priority:

Schedule Ref:

Unit Condition:

Subject/Description: TOPICAL REPORT 116 NEEDS REVISION Assign #: 02 Assigned To: U777KCL Status: ACC/ASG Aft Fac: Oyster Creek Prim Grp: A5351NESPR Due Date: 06/24/2009 Assign Type: ACIT Sec Grp: Orig Due Date: 06/24/2009 Priority:

Schedule Ref:

Unit Condition:

Subject/Description: Revise topical report 116 as discussed in IR.

httn-//eam re~ncnx'-r~c~n-om/ca..n/s,,,rvle~t/R ,nnrtAR Se-rvle~t 61Q9 6/11Q/?.13OQ

Remote User TAYLCC http://eamgenco.ceco.com/cap/servlet/Rep 06/19/09 12:30 PM ii~ll~iiii iiii iiii iiii iiii iiii iiii ii iii~ i iiii.............i!{!

:: : : : :.:.:: : ii!! !!...!..

i ...

..........= == == = == =  :: :

AR - Assignment Report Page I of 3 O Go Back Print I New Search Home AR 00912827 Report Aft Fac: Oyster Creek AR Type: CR Status: APPROVED Aft Unit: 01 Owed To: A5332CAP Due Date: 06/30/2009 Aft System: -- Event Date: 04/26/2009 CR 3/D Disc Date: 04/27/2009 Level/Class:

How H03C Orig Date: 04/28/2009 Discovered:

WR/PIMS AR: Component #:

Action Request Details

Subject:

NOS ID: TRITIUM LOGKEEPING NOT CONSISTENT WITH PROCEDURE

Description:

Originator: DAVID PEIFFER Supv Contacted: Bob Artz, Jhansi Kandasamy Condition

Description:

NOS followed up on a false positive tritium analysis on a sample from the main condener discharge that was reported over the weekend and found that Chemists are deviating from expected logkeeping standards. Records of the tritium analysis do not accurately indicate the minimum detectable activity (MDA) levels.

The tritium log was reviewed and deficiencies were noted in the data records. Sample times were not recorded as required by the procedure.

The log sheet had information written into the margin at the bottom of the page that indicated three different MDA levels, depending upon the sample count time. The chemist was recording only < in the results column, where the activity level should be recorded. When asked which MDA applied to which samples, the chemist explained that it depended upon the length of time the sample was counted.. NOS pointed out that the count time is not recorded on the log, and it is impossible to discern which MDA applies to each sample. The technician then recorded < (50 min) in the column where uCi/mL should be recorded. Inaccurate logkeeping could cause inaccurate reports to regulators.

The chemist pointed out that the false positive occurred because the sample was filtered and not distilled and counted for only 10 minutes to obtain a quick indication of the tritium level. Environmental samples require a 50 minute count time to achieve the required MDA level. The chemist indicated that the sample may have had bioluminescence, which has caused false positive results in other samples in the past. When asked how to avoid this interference, he stated that the sample can be distilled to avoid bioluminescence interference. He said that filtering was faster and the main condenser discharge sample was not distilled to save time.

When the positive tritium result was found, then the chemist distilled the sample and re-analyzed and no tritium was present. It was rioted that the samples being analyzed on the day after the false positive were distilled and all indicated less than minimum detectable levels.

Immediate actions taken:

Briefed the Chemistry Manager on the NOS observations.

Recommended Actions:

L httn://e~qnim.n~ c~c,.m/ n/qrvpt/nnrt ripnco A P qirwlpt 1<1 11U z1O'CA n

AR - Assignment Report Page 2 of 3 Provide clear standards for processing environmental samples to avoid analytical interferences.

Segregate environmental sample logsheets for from plant sample logsheets,to avoid confusion about MDA levels.

Reinforce standards for logkeeping to ensure the proper units of measurement and not recording data in the margins.

What activities, processes, or procedures were involved?

Tritium analysis Why did the condition happen?

Chemists were not adhering to log keeping standards.

Unclear standards for processing environmental tritium samples.

What are the consequences?

False positive results could potentially cause wrong information being reported to regulators.

Repeat or similar condition?

Yes, false positive tritium results were reported to the NJDEP in 2008.

Operable Basis:

n/a Reportable Basis:

n/a Reviewed by: THOMAS A DUNN 04/28/2009 18:58:50 CDT Reviewer Comments:

SOC Reviewed by: RONALD W FITTS 05/07/2009 09:19:00 CDT SOC Comments:

Follow up Chem.

04-30-09 JJV: PCRA created to revise the procedure in accordance with Recommended Actions.

5/5/09 jek (MRC) Back to SOC for Sev Level 3.

5/7/09 rwf - revised to sig level 3 based on failure to follow a level 2 or 3 procedure with undsireable consequences. Risk/Uncertainty -

Medium/Low, Class D - Crew Clock Reset added.

Dynamic AR Attributes CREW RESET1: Chem Lab Trend Codes TC1 TC2 TC3 Proc Org Rank ECY103 *

  • CY20 CH P Assignments Assign #: 01 Assigned To: Status: COMPLETE Aft Fac:, Oyster Creek Prim Grp: ACAPALL Due Date: 05/06/2009 A / 10 /1 ()(U) httn://e.,qmcr(venco c~crn m/nkrvPR ncr lSprltI1O)A

AR - Assignment Report .Page 3 of 3 Assign Type: TRKG Sec Grp: Orig Due Date: 05/03/2009 Priority:

Schedule Ref:

Unit Condition:

Subject/Description: NOS ID: TRITIUM LOGKEEPING NOT CONSISTENT WITH PROCEDURE Assign #: 02 Assigned To: U777RJA Status: ACC/ASG Aft Fac: Oyster Creek Prim Grp: A5332CHEM Due Date: 06/30/2009 Assign Type: PCRA Sec Grp: Orig Due Date: 06/30/2009 Priority:

Schedule Ref:

Unit Condition:

Add a column to the tritium analysis data log for countin g protocol number, and add Subject/Description. LLD values for all three protocols, in CY-OC-130-530.

I, ttn //t~m apnrr~ r'prc~ rc~m Ir ,k,-,~ril.~tIP ~~r~ri- A P V ,1~t 4II/1 /1rV

  • ............ *,,*:*:* ........ *,; ..
  • Z *  :*; *  :: .......... ..........

==

= = =.

== === ............

==

==

======== ==== = . ... . . . . . . .... :: : :

...... iii il. . .. . .. .. .. ...

.................. ................... =====

AR - Assignment ReportP Page I of 2 Go Back print J New Search IHome AR 00913387 Report Aft Fac: Oyster Creek AR Type: CR Status: APPROVED Aff Unit: NA Owed To: A5352CAP Due Date: 05/29/2009 Aft System: -- Event Date: 04/28/2009 CR 4/D Disc Date: 04/29/2009 Level/Class:

How H02 Orig Date: 04/29/2009 Discovered:

WR/PIMS AR: Component #:

Action Request Details

Subject:

PIPE IN TRENCH WEST OF TGB SUSPECTED OF LEAKING

Description:

Originator: THOMAS P RUGGIERO Supv Contacted: R. Larzo, S. Markos Condition

Description:

An excavation has been made in an area west of the Turbine Building and North of the Condensate Transfer Pump House. In the trench, a 4" pipe is dripping water. Thia IR is to document that the piping is the abandoned remains of the Makeup to the Demineralized Water Storage Tank. The piping was verified to be the abandoned line by the present of a pipe clamp that was installed as a result of MNCR 91-108-10.

After that time a portion of the Make up pipe was relocated to run inside the Condenser Bay (sometime before 1995.. When this pipe was abandoned it is believed that it was simply cut and left in place. No caps were installed. The remainder to the makeup to the Demineralized water storage tank was rerouted above grade via OC-CCD-328376-001. Refer to drawing GU 3E-424-22-1001 Revision 2. When the rest of the pipe was located above grade some of the abandoned pipe was flushed then capped. There is no effidence however that this pipe was capped.

Immediate actions taken:

Verified that pipe is indeed abandoned in place and initiated this IR.

Recommended Actions:

Close to Trend.

List of knowledgeable individuals:

T. Ruggiero, P. Tamburro Operable Basis:

N/A Reportable Basis:

N/A Reviewed by: GARY G FLESHER 04/29/2009 17:56:32 CDT Reviewer Comments:

none SOC Reviewed by: RONALD W FITTS 05/01/2009.09:25:57 CDT SOC Comments:

4/30/09 RCL: As discussed in IR, pipe is abandoned and not connected to httn-f//nmw-enon coe cmc2krvptRp(t R5-vn ~1090 11/ /1)Q/ ofN

AR - Assignment Report Page 2 of 2 plant systems. Source of water is groundwater/rain water leaking into pipe. Close to IR comments.

05/01/09 LF - Verified via water sample results - gamma and tritium results both less than MDA.

Trend Codes TC1 TC2 TC3 Proc Org Rank EQM PIP * *

  • P Assignments Assign #: 01 Assigned To: Status: COMPLETE Aff Fac: Oyster Creek Prim Grp: ACAPALL Due Date: 05/04/2009 Assign Type: TRKG Sec Grp: Orig Due Date: pp/pp/pppp Priority:

Schedule Ref:

Unit Condition:

Subject/Description: PIPE IN TRENCH WEST OF TGB SUSPECTED OF LEAKING httn //~im ~ncn c~cn cnm/c2nAzPrvlPtJR c~nArt Al? .~rv1pt onnno 1ý/1I Q /1) )()

Remote User TAYLCC http://eamgenco.ceco.com/cap/servlet/Rep 06/19/09 12:31 PM

... . ... = = === .. = ...

==... .. .==

'"  ;;  : = .. == .. ===...==.. .. .===

.;:;;; ; == ==.= ===.= ==.== ==...=

:  ::  ::"... .. ...... .... .... ..... ... =

[iii~

[!!! iiii

!!!! i!!i

[!!!iii~

!!!! iiii iiii iiii iiii ii..............!!!i

AR - Assignment Report Page I of 2 Go Back Print INew Search Home AR 00913439 Report Aft Fac: Oyster Creek AR Type: CR Status: APPROVED Aft Unit: NA Owed To: A5351CAP Due Date: 05/29/2009 Aft System: 424 Event Date: 04/29/2009 CR 3/D Disc Date: 04/29/2009 Level/Class:

How H02 Orig Date: 04/29/2009 Discovered:

WR/PIMS AR: A2223099 Component #: 424 Action Request Details

Subject:

LEAK IDENTIFIED ON 10" BURIED CONDENSATE TRANSFER PIPE

Description:

Originator: RALPH C LARZO Supv Contacted: Ray, H Condition

Description:

While returning the Condensate Transfer System back into service, a leak (roughly the size of a quarter) was discovered in the Condensate Transfer Building. This line is a 10-inch diameter, carbon-steel, schedule 40, CH-1 line.

Originally, the lirfe was inspected at two locations (F6) and (F5). The locations had the wrappings removed and coatings inspected over two foot sections. Additionally, the location (F6) had UT performed and the lowest reading was 0.322 (C2021108-03) against a criteria of min wall of 0.034.

This event is a part of the initial reporting of tritium at Oyster Creek.

Therefore, no additional reporting is required.

Immediate actions taken:

OCC notified Recommended Actions:

Permanent repairs are being performed under IR 00907846 prior to startup from 1F20. Also, a root cause evaluation is being performed on'IR 00907846 to evaluate tritium leak issues and resolution.

Perform an EACE on failed piping on this IR to include extent of condition.

What activities, processes, or procedures were involved?

Excavating to locate pipe leak Why did the condition happen?

Possible coating degradation and resultant corrosion What are the consequences?

Possible tritium release path Were any procedural requirements impacted?

None 4/1 A n n

AR - Assignment Report Page 2 of 2 List of knowledgeable individuals:

H. Ray, R. Skelskey Repeat or similar condition?

Similar to leak found on 8" condensate transfer pipe Operable Basis:

N/A Reportable Basis:

N/A Reviewed by: HERBERT G TRITT II 04/29/2009 19:28:49 CDT Reviewer Comments:

none SOC Reviewed by: THOMAS A POWELL 05/01/2009 08:24:32 CDT SOC Comments:

CONDENSATE TRANSFER WATER SYSTEM-11,CH 4/30/09 RCL: Sig 3 due to extension to outage of greater than 1 day.

Risk-Uncertainty Med/Med. As stated in IR, repairs are being made on IR 907846 (AR A2222268). A Root Cause Evaluation is being performed on IR 907846 to address the overall tritium mitigation issue. Engineerig will also evaluate this failure as part of EACE 912228-02 which also includes the leak from the 8" condensate transfer line. The PIMS AR pulled through on this IR is not needed.

Close to comments RCE 907846 and EACE 912228-02.

5/1/09 TAP - new PIMS ar A2223099 has been REJECTED.

Assignments Assign #: 01 Assigned To: Status: COMPLETE Aft Fac: Oyster Creek Prim Grp: ACAPALL Due Date: 05/04/2009 Assign Type: TRKG Sec Grp: Orig Due Date: pp/pp/pppp Priority:

Schedule Ref:

Unit Condition:

Subject/Description: LEAK IDENTIFIED ON 10" BURIED CONDENSATE TRANSFER PIPE t,++-- ---- --- A T-1 0 ---. 1- If 11 ý In nnn

Remote User TAYLCC http://eamgenco.ceco.com/cap/servlet/Rep 06/19/09 .12:32 PM

=

=

== = === == === = =.... .. .. ..

=. .... ...... ..= ... ... . . .. .. . .. ..

i~iiiii iii ! ... ......

2il;;!iiii i...............*,

.......... i........iii ii ii i

  • : :; :==::===r == ====. == .......
iii? iii:  : i~iii~i.............i!

AR - Assignment Report Page I of 2 O Go Back Print I New Search Home AR 00914347 Report Aff Fac: Oyster Creek AR Type: CR Status: APPROVED Aff Unit: NA Owed To: A5332CAP Due Date: 05/31/2009 Aft System: -- Event Date: 04/29/2009 CR 4/D Disc Date: 04/29/2009 Level/Class:

How H02 Orig Date: 05/01/2009 Discovered:

WR/PIMS AR: Component #:

Action Request Details*

Subject:

LESSON LEARNED TRITIUM ANALYSIS IN THE HOT LAB

Description:

Originator: LEANNE K BIRKMIRE Supv Contacted: Jhansi Kandasamy Condition

Description:

On 04/29/09 tritium samples were taken for support of the tritium ACMP.

One of these sample had known tritium activity. When the samples were distilled the sample with known tritium activity was distilled first after a blank for cleanliness verification. After the sample with known tritium activity was run it contaminated the sample that was run after it.

Immediate actions taken:

The samples were distilled again with a blank and then the samples were run. The samples were distilled from the least amount of tritium based on previous results to the highest amount of tritium based on previous results and then a blank was run to verify cleanliness of the distillation after all samples were complete.

Recommended Actions:

Samples were re-run and results were consistent with what was expected and previous results. Technician involved was briefed on the logistic of sequencing analysis.

Operable Basis:

N/A Reportable Basis:

N/A Reviewed by: HERBERT G TRITT II 05/02/2009 02:22:38 CDT Reviewer Comments:

none SOC Reviewed by: JAMES J VOUGLITOIS 05/04/2009 11:59:32 CDT SOC Comments:

Follow up Chemistry 05/04/09 JJV: Close to actions taken.

Reviewed by: PHILIP E OLIVIERI 05/05/2009 08:14:12 CDT Reviewer Comments:

Coaching was provided to technicians and participants in tritium analysis from other sites that sample prep distillations should be performed A D Q-4-+ -111 rln n

AR - Assignment Report Page 2 of 2 starting with sampels with lowest activity, absed on previous results, to sampels with greatest activity to avoid cross-contamination.

Dynamic AR Attributes CREW RESET1: Chemistry KEYWORD: LL Trend Codes TC1 , TC2 TC3 Proc Org Rank ECY103 *

  • CY90 CH P Assignments Assign #: 01 Assigned To: Status: COMPLETE Aft Fac: Oyster Creek Prim Grp: ACAPALL Due Date: 05/06/2009 Assign Type: TRKG Sec Grp: Orig Due Date:

Priority:

Schedule Ref:

Unit Condition:

Subject/Description: LESSON LEARNED TRITIUM ANALYSIS IN THE HOT LAB hitt~n //enm p'en co _rernc _comn/r..nAke.rvl et/R f-nnrt A R ervle~t A/1 Q/ONNQn AlOll

.4 * *. , -Remote User TAYLCC http://eamgenco.ceco.com/cap/servlet/Rep 06/19/09 12:32 PM

=======....= = =====. . .. .

.. . ..... ..... = == == = = == = = ==

AR - Assignment Report Page 1 of 3 Go Back Print I New Search Home AR 00914375 Report Aft Fac: Oyster Creek AR Type: CR (Status: APPROVED Aft Unit: NA Owed To: A5351CAP Due Date: 68/11/2009 Aft System: 424 Event Date: 04/30/2009 CR 4/D Disc Date: 04/30/2009 Level/Class:

How H02 Orig Date: 05/01/2009 Discovered:

WR/PIMS AR: Component #: 424 Action Request Details

Subject:

GUIDED WAVE PIPE INSP TECHNIQUE PROVIDED INCORRECT RESULTS

Description:

Originator: RALPH C LARZO Supv Contacted: H. Ray Condition

Description:

On 4/18/09 Guided Wave inspections were performed on buried condensate transfer lines at Oyster Creek, in support of an ongoing leak investigation. Guided wave was intended to help find the leak location as well as determine the extent of condition for the lines in the area potentially contributing to the tritium found in the sampling wells along with other techniques such as UT and visual. Guided wave inspections were followed up with ultrasonic inspections (UT) to verify the results. The following lines were inspected: 6 Condensate transfer discharge (aluminum), 10 diameter Hotwell Level Control to Hotwell (carbon steel), 8 diameter Hotwell Level Control to Hotwell (carbon steel) were inspected with Guided Wave. Guided Wave results indicated severe corrosion on the 8 line, however follow-up UT performed on 4/28/09 found only minor corrosion. On 4/29/09 SIA was called back in to inspect the remained of piping not shot In addition guided wave did not find a hole in the 10 line. The vendor did not indicate that the data was potentially bad and issued the results that were incorrect; they had not identified a through wall hole. The aluminum line had to have the coating completely removed to verify that there was no leakage. The guided wave provided incorrect results.

Note: A similar IR (914149 was issued in the Cantara CAP system)

Immediate actions taken:

The majority of the 8" and 10" buried piping is being replaced (ref. AR A2222268) and thre remaining portions evaluated on tech.eval. A2222268-13.

An OTDM is also being prepared (ref IR 00907846-11) prior to startup from 1F20.

Recommended Actions:

Engineering to work with Cantera Programs Engineering (components) to understand the capabilities and limitations of guided wave and the reason for recieving incorrect results. Also determine the consequences on the buried pipe program.

What activities, processes, or procedures were involved?

Guided Wave inspections Why did the condition happen?

http://eamgenco.ceco.com/cap/servlet/ReportARServlet 6/19/2009

AR - Assignment Report Page 2 of 3 Unknown and the Vendor SIA is to determine the cause of the incorrect results.

What are the consequences?

Critical path in the outage was extended. When the guided wave results could not be confirmed alternate action (replace pipe) was implemented.

Were any procedural requirements impacted?

no Were there any adverse physical conditions?

none List of knowledgeable individuals:

H. Ray, Greg Gerzen, Roman Gesior,.Jim Hallenbeck, Pete Tamburro, Thomas Roddey Repeat or similar condition?

No Operable Basis:

N/A Reportable Basis:

N/A Reviewed by: THOMAS A DUNN 05/01/2009 10:59:50 CDT Reviewer Comments:

SOC Reviewed by: RALPH C LARZO 05/03/2009 19:41:01 CDT SOC Comments:

CONDENSATE TRANSFER WATER SYSTEM-11,CH 5/3/09 RCL: Close to ACIT to engineering to determine the impact of limitations of guided wave testing to the underground piping program.

Trend Codes TC1 TC2 TC3 Proc Org Rank EQM PIP

  • ER18
  • P Assignments.

Assign #: 01 Assigned To: Status: COMPLETE Aff Fac: Oyster Creek Prim Grp: ACAPALL Due Date: 05/06/2009 Assign Type: TRKG Sec Grp: Orig Due Date: pl/ppl/iwppp Priority:

Schedule Ref:

Unit Condition:-

Subject/Description: GUIDED WAVE PIPE INSP TECHNIQUE PROVIDED INCORRECT RESULTS Assign #: 02 Assigned To: U777KCL Status: ACC/ASG Aft Fac: Oyster Creek Prim Grp: A5351NESPR Due Date: 08/11/2009 httlD://eamp-enco.ceco.com/can/s-ervietIR enortA R Spervlet AllQ/10/nna

AR - Assignment Report Page 3 of 3 Assign Type: ACIT Sec Grp: Orig Due Date: 08/11/2009 Priority:

Schedule Ref:

Unit Condition:

Underground Pipe eng - Work with Cantera Programs Enginee ring (components) to Subject/Description: understand the capabilities and limitations of g uided wave and the reason for recieving incorrect results. Also determine the consequences on the buried pipe program.

httD://eam2enco.ceco.com/can/,,ervletlRenortAR,'Se(-rvie~t /1/90 I/1 Q/InAfQ

Remote User TAYLCC http://eamgenco.ceco.com/cap/servIet/Rep 06/19/09 12:33 PM

  • ii lliiiiiii iii ll....... ........

==

= = === = = = == = == =.

===

== ==.

=

=. == = == ==  : .. . .....

AR - Assignment Report Page 1 of 2 Go Back Print I New Search Home AR 00914938 Report Aft Fac: Oyster Creek AR Type: CR Status: APPROVED Aft Unit: NA Owed To: A5332CAP Due Date: 06/01/20.09 Aft System: -- Event Date: 04/30/2009 CR 4/D Disc Date: 05/01/2009 Level/Class:

How H02 Orig Date: 05/02/2009 Discovered:

WR/PIMS AR: Component #:

Action Request Details

Subject:

REVIEW ANOMOLOUS WELL SAMPLE ANALYSIS RESULTS

Description:

Originator: JHANSI R KANDASAMY Supv Contacted: Mike Massaro Condition

Description:

There were 5 new wells (W-50 to W-54) that were drilled in' response to the Tritium investigation. Chemistry sampling of the wells are being performed weekly to monitor the Tritium levels in these wells. Original samples taken on 4/24/09 from Well 53 (W-53)were less than LLD or detectable and Well 54 (W-54) indicated 7,950 pCi/L. Samples taken on 4/30/09 indicated Wm53 was approximately 9,000 pCi/L and W-54 was less than LLD or detectable. This raised a question on the validity of the data.

Resampling and reanalysis was performed on 5/1/09. W-53 is indicating 13,100. and W-54 is LLD. The results from 4/30/09 were validated. This implies either the original sample was in error or the groundwater plume is moving.

Immediate actions taken:

Resampling and reanalysis were performed as a confirmatory to validate the results.

Recommended Actions:

Continue to follow the ACMP and trend.

What activities, processes, or procedures were involved?

ACMP - Chemistry sampling plan for Tritium Why did the condition happen?

The groundwater plume is moving or initial samples were false positive.

List of knowledgeable individuals:

Cal Taylor, Jim Barstow, Mike Massaro, Ziggy Karpa Repeat or similar condition?

no Operable Basis:

N/A Reportable Basis:

N/A httD:H/eamL~enco.ceco.com/caD/servlet/RenortARServl et /1I90 r611 Q19,300

AR - Assignment Report Page 2 of 2 Reviewed by: GARY G FLESHER 05/02/2009 12:22:57 CDT Reviewer Comments:

none SOC Reviewed by: RONALD W FITTS 05/05/2009 09:24:16 CDT SOC Comments:

05/05/09 SOC: Close to ACMP and trend.

Trend Codes TC1 TC2 TC3 Proc Org Rank EOR204 *

  • EN08 SENS Assignments Assign #: 01 Assigned To: Status: COMPLETE Aft Fac: Oyster Creek Prim Grp: ACAPALL Due Date: 05/07/2009 Assign Type: TRKG Sec Grp: Orig Due Date: pp/pl-/pl/pp Priority:

Schedule Ref:

Unit Condition:

Subject/Description: REVIEW ANOMOLOUS WELL SAMPLE ANALYSIS RESULTS http://eamgzenco.ceco.com/cat)/serv~eIR enort.AR,'Rt-rvie~t All1 0/1)no*

9**; ;!i* Remote User TAYLCC http://eamgenco.ceco.com/cap/servlet/Rep 06/19/09 12:33 PM

======== === == == ===.....

= . ... . . .... ..

===

==

===== === == ...........::  :

=

= == == = ..............  ; ; ;*

. ..... . .:: : ........... === ..........

AR - Assignment Report Page I of 2 O Go Back Print I New Search Home AR 00915473 Report Aff Fac: Oyster Creek AR Type: CR Status: APPROVED Aff Unit: NA Owed To: A5332CAP Due Date: 06/03/2009 Aff System: -- Event Date: 05/04/2009 CR 4/D Disc Date: 05/04/2009 Level/Class:

How H02 Orig Date: 05/04/2009 Discovered:

WR/PIMS AR: A2223464 Component #: 126 Action Request Details

Subject:

RECOVERY WELL- INSTALLATION TO COLLECT IMPACTED GROUNDWATER

Description:

Originator: ZIGMUND A KARPA Supv Contacted: Matt Nixon Condition

Description:

Recent pipe leaks at Oyster Creek have resulted in tritium releases to groundwater. Digging permit, clearances, asphalt removal, soil sampling and analysis for gamma is required to allow installation of recovery well in the event tritium removal is required. Vendor 'support, New Jersey licensed well driller, and hydrogeologist support will be required for well installation.

Immediate actions taken:

Discussed with OCC and developed IR to initiate digging permit and associated clearances.

Recommended Actions:

Initiate actions required to clear area for well installation for Wednesday May 6th.

What activities, processes, or procedures were involved?

None Why did the condition happen?

Leaking pipes What are the consequences?

Tritium in groundwater Were any procedural requirements impacted?

None Were there any adverse physical conditions?

Tritium in groundwater List of knowledgeable individuals:

OCC Repeat or similar condition?

No Operable Basis:

N/A htt~n://eaqmge~en-oce~~o-c~om/c.nn/set-rvl -et/R-ennrtAR.'qt-rvli-t ~I /f

  1. ý/1 0/1)()(Q

AR - Assignment Report Page 2 of 2 Reportable Basis:

N/A SOC Reviewed by: THOMAS A POWELL 05/06/2009 10:00:32 CDT SOC Comments:

UNDERGROUND-OTHER 5/4/09 TSL: Pulled through IR to AR per OCC direction.

5/5/09 rwf - close to pims ar A2223464 pulled through as pri 2,cm.

Assignments Assign #: 01 Assigned To: Status: COMPLETE Aft Fac: Oyster Creek Prim Grp: ACAPALL Due Date: 05/09/2009 Assign Type: TRKG Sec Grp: Orig Due Date: pp/ipp/ppptp Priority:

Schedule Ref:

Unit Condition:

Subject/Description: RECOVERY WELL INSTALLATION TO COLLECT IMPACTED GROUNDWATER http://eamgenco.ceco.com-1cap/servlet/RetoortARServlet ~IQ90 6/11Q/gDOQ

Remote User TAYLCC http://eamgenco.ceco.com/cap/servlet/Rep 06/19/09 12:34 PM

... . .. .. . . .. .. . . .. .. . .. . . ... . . . . . .. . . .  : i ]  :;  ; :

=

= .....==

............ iii ii ...........

.... .. . . ==== = =.. ===... .. .. ... ....

AR - Assignment Report Page I of 2 Go Back Print I New Search Home AR 00915953 Report Aft Fac: Oyster Creek AR Type: CR Status: APPROVED Aft Unit: NA Owed To: A5332CAP Due Date: 06/04/2009 Aft System: -- Event Date: 04/25/2009 CR 5/D Disc Date: 05/01/2009 Level/Class:

How H03A Orig Date: 05/05/2009 Discovered:

WR/PIMS AR: Component #:

Action Request Details

Subject:

EVALUATE IF THE MONITORING WELL BE INCLUDED IN ODCM

Description:

Originator: JHANSI R KANDASAMY Supv Contacted: Nixon, Massaro Condition

Description:

A question was raised by the NRC regarding the inclusion if the monitoring well located in Clune park in the REMP program. At one time it wa sincluded, but has been removed and is no longer part of the current program.

Based on the recent Tritium activity at the site, the question was raised to revaluate; Immediate actions taken:

Generated IR for evaluation Recommended Actions:

Perform work group eval to determine why the well was removed from the program and if it should be re added.

Operable Basis:

N/A Reportable Basis:

N/A Reviewed by: JOSHUA V SISAK 05/05/2009 12:20:49 CDT Reviewer Comments:

none SOC Reviewed by: THOMAS S LONSDALE 05/08/2009 09:20:57 CDT SOC Comments:

5/8/09 JMN: The site does not own or operate any wells in Clune Park.

There have never been any wells in Clune Park included in the REMP program. Follow up discussion with the NRC resulted in a recommendation that an additional off-site well be included in the groundwater monitoring associated with the condensate leaks. IR 916938 documents the new recommendation.

Close to comments.

Assignments Assign #: Assigned To: Status: COMPLETE htti):Heamuenco.ceco.com/cat)/servlet/RetortARServlet /1/9Q 6/11Q/?n nIQ

AR - Assignment ReportP Page 2 of 2 01 Aft Fac: Oyster Creek Prim Grp: ACAPALL Due Date: 05/10/2009 Assign Type: TRKG Sec Grp: Orig Due Date: pp/pp/pppp Priority:

Schedule Ref:

Unit Condition:

Subject/Description: EVALUATE IF THE MONITORING WELL BE INCLUDED IN ODCM httv:H/eamiaenco.ceco.com/can/serviet[RenortAR,'ervie-t. ci/1 /0l

, o/,)nno

Remote User TAYLCC http://eamgenco.ceco.com/cap/servlet/Rep 06/19/09 12:34 PM

..... .... ..... == = = ==  :  :; ::

..... . .. . .. .....  : :: :: 1 :: ::

== =...=

== = = = = = =. .... .... ... ... ...

  • [ [ :[: ]: (([ ::

[ : []  :[ : . . .. .. .. .. . .

AR - Assignment Report Page 1 of 2 O Go Back Print INew Search Home AR 00916157 Report Aft Fac: Oyster Creek AR Type: CR Status: APPROVED Aft Unit: 01 Owed To: A5301CAP Due Date: 07/10/2009 Aft System: -- Event Date: 04/30/2009 CR 4/D Disc Date: 04/30/2009 Level/Class:

How H03C Orig Date: 05/05/2009 Discovered:

WR/PIMS AR: Component #:

Action Request Details

Subject:

NOS OBSERVATIONS OF PORC

Description:

Originator: DAVID PEIFFER Supv Contacted: Jeff Dostal Condition

Description:

NOS observed a PORC 09-07 review of OTDM for repairs needed to support restart and operation of the reactor.

The quorum was verified and PORC members asked detailed questions.

The following deficiencies were noted:

- An old version of the Failure Mode Causal Tree FMCT was in the material sent out for preview by the PROC members. Engineering distributed a revised version at the beginning of the PORC meeting and voting members had to review it again to understand the changes.

- Supporting documentation was not made available for PORC members. A drawing of the piping and material types were not provided, and when requested, an engineer left the meeting to get the drawings. The drawing did not accurately indicate the piping runs or material types.

- A map of tritium results was not provided but was discussed, based upon the memory of the chemistry manager.

The PORC meeting was suspended to incorporate comments, and restarted and finished later with additional information.

Immediate actions taken:

Discussed with the PORC chairman Recommended Actions:

Ensure that information brought to PORC is current, accurate, and supporting information is made available to answer questions from the PORC members.

What activities, processes, or procedures were involved?

PORC Why did the condition happen?

Inattention to detail in preparation of PORC information.

What are the consequences?

Potential to make bad decisions based on wrong information.

List of knowledgeable individuals:

Jeff Dostal httn://eam genro cecoc.om/c.nn/.serv1~.tfR enortA P Serviet All Ofl nAG AllQ*N*

AR - Assignment Report Page 2 of 2 Operable Basis:

N/A Reportable Basis:

N/A Reviewed by: THOMAS A DUNN 05/05/2009 22:32:49 CDT Reviewer Comments:

SOC Reviewed by: RICHARD A MILOS 05/07/2009 07:08:47 CDT SOC Comments:

RAM 05/07/09: Close to assignment created.

Trend Codes TC1 TC2 TC3 Proc Org Rank EOR301 *

  • LS RA Assignments Assign #: 01 Assigned To: Status: COMPLETE Aft Fac: Oyster Creek Prim Grp: ACAPALL Due Date: 05/10/2009 Assign Type: TRKG Sec Grp: Orig Due Date: ppi/pp/Ipplp Priority:

Schedule Ref:

Unit Condition:

Subject/Description: NOS OBSERVATIONS OF PORC Assign #: 02 Assigned To: U777RAM Status: ACC/PRI Aft Fac: Oyster Creek Prim Grp: A5301RAPR Due Date: 07/10/2009 Assign Type: ACIT Sec Grp: Orig Due Date: 07/10/2009 Priority:

Schedule Ref:

Unit Condition:

PORC is current, accur ate, and supporting Subject/Description: Ensure that information information is made available to to brought answe r questions from the PORC members.

htti):Heam2enco.ceco.comlcaD/servlet/RenortA RServl et 41ll

/ 0/1) ()(Q t1Q~ll

,, Remote User TAYLCC http://eamgenco.ceco.com/cap/servlet/Rep 06/19/09 12:36 PM

=== = = = = = = == = == == ..

== == . ...:  ; : ::.. . ... ,.. :: ::

= = = = = =

= === =. ... ... .. . . .. .  : .

!!(([!!((i!i!; iii~[!! ........... i[!i

==

= == == = ===== = = = = =. .. ..... .. .:  :

. ..... ... ==.... == .. =  ::  ::  :: ,*

)

AR - Assignment Report Page I of 2 0 Go Back Print I New Search IHome AR 00916157 Report Aft Fac: Oyster Creek AR Type: CR Status: APPROVED Aft Unit: 01 Owed To: A5301CAP Due Date: 07/10/2009 Aft System: -- Event Date: 04/30/2009 CR 4/D Disc Date: 04/30/2009 Level/Class:

How H03C Orig Date: 05/05/2009 Discovered:

WR/PIMS AR: Component #:

Action Request Details

Subject:

NOS OBSERVATIONS OF PORC

Description:

Originator: DAVID PEIFFER Supv Contacted: Jeff Dostal Condition

Description:

NOS observed a PORC 09-07 review of OTDM for repairs needed to support restart and operation of the reactor.

The quorum was verified and PORC members asked detailed questions.

The following deficiencies were noted:

- An old version of the Failure Mode Causal Tree FMCT was in the material sent out for preview by the PROC members. Engineering distributed a revised version at the beginning of the PORC meeting and voting members had to review it again to understand the changes.

- Supporting documentation was not made available for PORC members. A drawing of the piping and material types were not provided, and when requested, an engineer left the meeting to get the drawings. The drawing did not accurately indicate the piping runs or material types.

- A map of tritium results was not provided but was discussed, based upon the memory of the chemistry manager.

The PORC meeting was suspended to incorporate comments, and restarted and finished later with additional information.

Immediate actions taken:

Discussed with the PORC chairman Recommended Actions:

Ensure that information brought to PORC is current, accurate, and supporting information is made available to answer questions from the PORC members.

What activities, processes, or procedures were involved?

PORC Why did the condition happen?

Inattention to detail in preparation of PORC information.

What are the consequences?

Potential to make bad decisions based on wrong information.

List of knowledgeable individuals:

Jeff Dostal htto ://eamyenco.ceco.comlcan//servletfR enortA R Servli.t All1 0/1)()()Q

AR - Assignment Report Page 2 of 2 Operable Basis:

N/A Reportable Basis:

N/A Reviewed by: THOMAS A DUNN 05/05/2009 22:32:49 CDT Reviewer Comments:

SOC Reviewed by: RICHARD A MILOS 05/07/2009 07:08:47 CDT SOC Comments:

RAM 05/07/09: Close to assignment created.

Trend Codes TC1 TC2 TC3 Proc Org Rank EOR301 *

  • LS RA Assignments Assign #: 01 Assigned To: Status: COMPLETE Aft Fac: Oyster Creek Prim Grp: ACAPALL Due Date: 05/10/2009 Assign Type: TRKG Sec Grp: Orig Due Date: pp/pp/pppp Priority:

Schedule Ref:

Unit Condition:

Subject/Description: NOS OBSERVATIONS OF PORC Assign #: 02 Assigned To: U777RAM Status: ACC/PRI Aft Fac: Oyster Creek Prim Grp: A5301RAPR Due Date: 07/10/2009 Assign Type: ACIT Sec Grp: Orig Due Date: 07/10/2009 Priority:

Schedule Ret:

Unit Condition:

Ensure that information brought to PORC is current, accur ate, and supporting Subject/Description: information is made available to answe r questions from the PORC members.

  • /10/gNNO httD://eami~enco.ceco.com/can/,,ervletIRenort AR Se.rvlp~t iono
  • ,. *
    • ,;** ...*,*: ....

=================..............;;;

............. === == ==  : :: ::

AR - Assignment Report Page I of 2 O Go Back Print I New Search Home AR 00916938 Report Aft Fac: Oyster Creek AR Type: CR Status: COMPLETE Aft Unit: NA Owed To: A5332CAP Due Date: 06/06/2009 Aft System: -- Event Date: 05/07/2009 CR 5/D Disc Date: 05/07/2009 Level/Class:

How H03A Orig Date: 05/07/2009 Discovered:

WR/PIMS AR: Component #:

Action Request Details

Subject:

NRC RECOMMENDS SAMPLING ADDITIONAL MONITORING WELL

Description:

Originator: JAMES J VOUGLITOIS Supv Contacted: M. Nixon Condition

Description:

While interviewing Chemistry staff regarding the groundwater monitoring program associated with the condensate leaks from buried pipes during an inspection visit, an NRC inspector recommended that an additional off-site well in the Kirkwood Aquifer (W-4K) be included in the monitoring program.

The inspector understands that there is no technical reason to believe that the Kirkwood Aquifer has been contaminated. However, from a public relations point of view, he feels that we should include this Kirkwood monitoring well in our sampling program in order to provide assurance to the public that the on-site groundwater contamination is not migrating to off-site wells.

Immediate actions taken:

Discussed with Supervisor and wrote this IR.

Recommended Actions:

Chemistry consider the NRC inspector's recommendation and determine if the additional well should be included in the monitoring program.

What activities, processes, or procedures were involved?

Interview with NRC inspector.

Why did the condition happen?

NA What are the consequences?

Additional costs associated with more sampling and analysis.

Were any procedural requirements impacted?

None Were there any adverse physical conditions?

NA List of knowledgeable individuals:

J. Vouglitois, M. Nixon, J. Kandasamy Repeat or similar condition?

No httn:H/eam genco.ceco.com/can/.,erv e~t[R enort AR Se~rvle.t 61Q90 ci11 o/nnn

AR - Assignment Report Page 2 of 2 Operable Basis:

N/A Reportable Basis:

N/A Reviewed by: GARY G FLESHER 05/07/2009 12:08:33 CDT Reviewer Comments:

none SOC Reviewed by: JAMES J VOUGLITOIS 05/08/2009 10:31:23 CDT SOC Comments:

05-08-09 JJV: Chemistry has evaluated the NRC recommendation and determined that monitoring well W-4K should be included in the Adverse Condition Monitoring and Contingency Plan for the Elevated Tritium Concentration Detected Onsite (ACMP). It was also determined that non-functioning lysimeter CST-2 should be removed from the ACMP. ACIT created to revise the ACMP accordingly. Close to ACIT created.

Dynamic AR Attributes L,

KEYWORD: Environmental Assignments Assign #: 01 Assigned To:' Status: COMPLETE Aft Fac: Oyster Creek Prim Grp: ACAPALL Due Date: 05/12/2009 Assign Type: TRKG - Sec Grp: Orig Due Date: pp/IJp/ppl-p Priority:

Schedule Ref:

Unit Condition:

Subject/Description: NRC RECOMMENDS SAMPLING ADDITIONAL MONITORING WELL Assign #: 02 Assigned To: U006JMN Status: COMPLETE Aft Fac: Oyster Creek Prim Grp: A5332CHEM Due Date: 05/22/2009 Assign Type: . ACIT Sec Grp: Orig'Due Date: 05/15/2009 Priority:

Schedule Ref:

Unit Condition:

Revise the Adverse Condition Monitoring and Contingency P lan for Elevated Tritium Subject/Description: Concentration Detected Onsite to include monitoring well W-4K as recommended by the N RC, and to remove the non-functional lysimeter CST-2.

httr):Heamgenco.ceco~corrn/can/verv] (4/R ennrt A R.5'rv1i-t A /11Q /1) ()()a AlOlA

*Remote User TAYLCC http://eamgenco.ceco.com/cap/serviet/Rep 06/19/09 12:37 PM i~iiiiii iii iiii i~ii ii!!

!iii iii~i!! i~i.............  :: : :::  : :. :. :. :. :..:

ii~ i!!

AR - Assignment Report Page 1 of 2 Go Back Print INew Search Home AR 00918708 Report Aft Fac: Oyster Creek AR Type: CR Status: APPROVED Aft Unit: 01 Owed To: A5332CAP Due Date: 09/25/2009 Aft System: 211 Event Date: 05/10/2009 CR 4/D Disc Date: 05/10/2009 Level/Class:

How H02 Orig Date: 05/12/2009 Discovered:

WR/PIMS AR: Component #:

Action Request Details

Subject:

ISO COND RESULTS FOR TRITIUM NOT AS EXPECTED

Description:

Originator: LEANNE K BIRKMIRE Supv Contacted: Jhansi Kandasamy, Chemistry Condition

Description:

On 05/10/09 Operations Bleed and Feed the A Isolation Condenser.

The results after the drain for tritium were:

5/10/2009 03:35 4.17E-06 The results after the filling for tritium were:

5/10/2009 05:55 3.41E-06 These results were expected to be < 1.98E-06.

Immediate actions taken:

Samples were taken again and the results for tritium were:

5/10/2009 18:05 2.40E-06 Recommended Actions:

Create a modification to recirculate the volume of water in the Isolation Condensers to ensure adequate mixing.

Operable Basis:

N/A Reportable Basis:

N/A Reviewed by: GARY G FLESHER 05/12/2009 14:53:06 CDT Reviewer Comments:

none SOC Reviewed by: THOMAS S LONSDALE 05/15/2009 09:51:58 CDT SOC Comments:

05/14/09 LF - Close to action created to take mod request through PHC process.

Trend Codes TC1 TC2 TC3 Proc Org Rank ECY101 *

  • CY90 CH P http:H/eamv~enco.ceco.com/cat)/servlet/RenortAR.Sfrvlf-.t 611/ 0/1)()(o

AR - Assignment Report Page 2 of 2 Assignments Assign #: 01 Assigned To: Status: COMPLETE Aft Fac: Oyster Creek Prim Grp: ACAPALL Due Date: 05/17/2009 Assign Type: TRKG Sec Grp: Orig Due Date: pp/pp/pppp Priority:

Schedule Ref:

Unit Condition:

Subject/Description: ISO COND RESULTS FOR TRITIUM NOT AS EXPECTED Assign #: 02 Assigned To: U777RJA Status: NTFY/ASG Aft Fac: Oyster Creek Prim Grp: A5332CHEM Due Date: 09/25/2009 Assign Type: ACIT Sec Grp: Orig Due Date: 09/25/2009 Priority:

Schedule Ref:

Unit Condition:

Present the following to PHC Subcommittee/PHC - Create a modification to recirculate Subject/Description: the volume of water in the Isolation Condensers to ensure adequate mixing.

http://eam~enco.ceco.com/can/servlet/R enort AR Rervl et K/II()I/1 W*

TAYLCC http://eamgenco.ceco.com/cap/servlet/Rep 06/19/09 12:37 PM

~~~..

........... i~ i ii i . . . .. ii.. i i.. i ....... i ii

. i...........

i ii i i

.... .... ... ..... ... = = === . . ... .  :

=. ...

... ==

.. = = =... . . .

.... ..... ...... =

== ....  ; ;;*  ;;

i..................

=.. ..... .

..... = = = = ==.=

.* ;;  ; ;  :*  ;; ' ... .....= ==

.=== = ==.... ==

AR - Assignment Report Page I of 4 Go Back Print New Search Home AR 00919705 Report Aff Fac: Oyster Creek AR Type: CR Status: APPROVED Aft Unit: NA Owed To: A5301CAP Due Date: 07/24/2009 Aff System: -- Event Date: 05/05/2009 CR 4/D Disc Date: 05/05/2009 Level/Class:

How H03C Orig Date: 05/14/2009 Discovered:

WR/PIMS AR: Component #:

Action Request Details

Subject:

NOS ID: EXT. OPEX NOT DOCUMENTED IN ACES AND CCAS

Description:

Originator: MARK J PRESS Supv Contacted: J. Kerr Condition

Description:

Documentation of External OPEX reviews for ACEs and CCA were less than adequate for 10 of 13 products reviewed during the NOS CAP audit.

Specifics were as follows:

1. Review of ACE 835031, Construction Equipment Comes in contact with Live 480V line, found that external operating experience (OPEX) was not documented as being reviewed as part of the investigation. Internal OPEX that was reviewed did not document the relevance to the event being investigated or how/if the OPEX was used to create corrective actions for this event. The investigator was contacted and stated that he reviewed external OPEX using the INPO website and did not find any relative OPEX (this was not documented in the ACE) and the internal OPEX reviewed was also found to be not applicable (this was not documented in the ACE). As a result there is inadequate documentation to support the review of internal and external OPEX in accordance with the requirements of LS-AA-125-1003, Apparent Cause Evaluation Manual, Attachment 1 for the documentation of previous events.
2. OPEX outside of the Oyster Creek station was not evaluated by ACE 757751, INPO AFI ER.2-1 PM Program Weaknesses. Only two recent Oyster Creek IRs were identified in the previous event review section of the ACE.

No non-Oyster Creek or non-Exelon OE was identified in the ACE.

3. ACE 876836, Oyster Creek Work Package Quality Issues, did not evaluate OPEX outside of Exelon. The ACE listed Oyster Creek INPO AFI and a fleet wide IR on planning issues in the previous events review section of the ACE.
4. ACE 842131, Electrical Flash in the 480 V room, did not evaluate OPEX outside of Exelon. The ACE listed the Oyster Creek and TMI IRs on flash issues in the previous event review section of the ACE.
5. No OPEX was found on ACE 869839, FOF Drill Objectives Not Met.
6. ACE 878594, Reportable Leak from Iso Condenser Vent, did not evaluate OPEX outside of Exelon. The ACE listed Limerick and Braidwood IRs on tritium leaks in the previous event review section of the ACE.
7. ACE 841706, OC 1R22 stretch goal of 123 Rem not met, did not evaluate OPEX outside of Exelon. The ACE listed the Exelon CCA IRs on 6 of 10 sites not meeting stretch goals in the previous event review section of the ACE.
8. CCA 884493, Improperly Applied Clearances, did not evaluate OPEX outside of the Oyster Creek station. Three recent Oyster Creek IRs were http://eamgenco.ceco.com/cap/servlet/ReportARServlet 6/19/2009 a

AR - Assignment Report Page 2 of 4 identified in the previous event review section of the ACE. No non-Oyster Creek or non-Exelon-OE was identified in the ACE.

9. CCA 838412, OC 2008 PCE goal not met, did not evaluate OPEX outside of Exelon. The ACE listed an OC CCA and PCEs in the previous event review section of the ACE.
10. CCA 886953, MM clock resets for 2008, did not evaluate OPEX outside of Exelon. The ACE listed an OC Engineering 2007 CCA for clock resets in the previous event section of the ACE.

Two other CCAs and one ACE that were reviewed had internal and external OPEX listed.

These are deficiencies because use of industry OPEX is required by LS-AA-125-1003, Apparent Cause Evaluation Manual and LS-AA-125-1002, Common Cause Analysis Manual. Specifically, section 4.3.7.1.in both revisions 7 and 8 of LS-AA-125-1003 and LS-AA-125-1002, section 4.4.4 state the following:

Review appropriate databases for site and industry events.

Whenever possible, do not limit the OE review to the station CAP database.

Include other databases (like INPO or NRC) in the OE review for similar events.

Immediate actions taken:

Discussed with Regulatory Assurance personnel.

Recommended Actions:

Review this issue with the MRC and department QRTs. Ensure those groups understand that industry OPEX needs to be included in ACEs and CCAs. Also, explain how that OPEX is to be used in proposing corrective actions to address issues that are identified by those products.

Why did the condition happen?

1. NOS observation of MRCs review of ACE 892164, In Storage Maintenance (ISM) activities were not performed on two rotating elements, found that the MRC did not note that the ACE did not evaluate OPEX outside of Exelon.

Thus, a contributing cause for this issue could be a gap in MRC reviews and in the departmental reviews before the product goes to the MRC.

2. This deficiency is repeated from the 2007 audit (see IRs 637963 and 636906)

What are the consequences?

Failure to use external OPEX means that the station does not benefit from solutions used at other plants in the industry.

Were any procedural requirements impacted?

Yes - See condtion description Were there any adverse physical conditions?

None List of knowledgeable individuals:

Childers, Tucker, A. Asarpota, E. Griffin, J. Kerr, R. Aguilar, A. Clark, T. Powell http://eamgenco.ceco.con~cap/servlet/RelportARServlet 6/1 Q/9.no*

61Q90

AR - Assignment Report Page 3 of 4 Repeat or similar condition?

Yes. See IRs 637963 and 636906 Operable Basis:

N/A Reportable Basis:

N/A Reviewed by:- CARL J SUCHTING 05/14/2009 13:42:53 CDT Reviewer Comments:

none SOC Reviewed by: STEVIE G DUPONT 05/19/2009 07:37:05 CDT SOC Comments:

05/18/09 LF - Created ACIT for RP staff to review requirments of LS-AA-125-1003, Apparent Cause Evaluation Manual and LS-AA-125-1002, Common Cause Analysis Manual.

05/18/09 SOC: Follow-up Reg. Assur.

5/19/09 - S. Du Pont - Generated assignment to communicate this issue with the MRC and department QRTs to ensure those groups understand that industry OPEX needs to be included in ACEs and CCAs. Also, explain how that OPEX is to be used in proposing corrective actions to address issues that are identified by those products. Close to assignments generated.

Trend Codes TC1 TC2 TC3 Proc Org Rank EOR302 *

  • LS02 MULT Assignments Assign #: 01 Assigned To: Status: COMPLETE Aft Fac: Oyster Creek Prim Grp: ACAPALL Due Date: 05/19/2009 Assign Type: TRKG Sec Grp: Orig Due Date:

Priority:

Schedule Ref:

Unit Condition:

Subject/Description: NOS ID: EXT. OPEX NOT DOCUMENTED IN ACES AND CCAS Assign #: 02 Assigned To: U998J3R Status: ACC/ASG Aft Fac: Oyster Creek Prim Grp: A5331RP Due Date: 06/30/2009 Assign Type: ACIT Sec Grp: Orig Due Date: 06/30/2009 Priority:

Schedule Ref:

Unit Condition:

RP Department Manager to go over requirements of LS-AA-12 5-1003, Apparent Cause http://eamgenco.ceco.com/cap/servlet/ReportARServlet 6/1 Q/I(3(3c

AR - Assignment Report Page 4 of 4 Subject/Description: Evaluation Manual and LS-AA-125-1002, Common Cause'Analysis Manual at staff meeting.

Assign #: 03 Assigned To: U001JK2 Status: COMPLETE Aft Fac: Oyster Creek Prim Grp: A5301EP Due Date: 07/24/2009 Assign Type: ACIT Sec Grp: Orig Due Date: 07/24/2009 Priority:

Schedule Ref:

Unit Condition:

Communicate this issue with the MRC and department QRTs. Ensure those groups understand that industry OPEX needs to be include d in ACEs and CCAs. Also, explain Subject/Description: how that OPEX is to be used in proposing corrective actions to address issues that are identified by those produ cts.

http://eamgenco.ceco.com/cap/servlet/ReportARServlet 6/19/2009

. .Remote User TAYLCC http://eamgenco.ceco.com/cap/serviet/Rep 06/19/09 12:39 PM

. ... .... == = == =

AR - Assignment Report Page I of 3 Go Back Print INew Search Home AR 00922031 Report Aft Fac: Oyster Creek AR Type: CR Status: APPROVED Aft Unit: NA Owed To: A5332CAP Due Date: 07/07/2009 Aft System: -- Event Date: 05/20/2009 CR 5/D Disc Date: 05/20/2009 Level/Class:

How H02 Orig Date: 05/20/2009 Discovered:

WRPPIMS AR: Component #:

Action Request Details

Subject:

TRNG - IMPROVEMENTS IDENTIFIED FOR PROCEDURE 101.4

Description:

Originator: PETER C DECKMAN Supv Contacted: Nelson, M.P.

Condition

Description:

While reviewing training materials and related procedures for initial chemistry technician training some potential improvements were noted for procedure 101.4, Release of Non-Process Water to the Environment from within the Radiological Controlled Area:

1. The last revision in 2001 was for Exelon name changes only, and the last substantive revision was in 1999. Given that there may have been ODCM changes in that time gap, and since some sampling requirements and expectations have changed since Oyster Creek and other tritium-related events, it would be prudent to revalidate this procedure against the ODCM and company / Oyster Creek environmental procedures.
2. The procedure needs upgrading to current formatting standards.
3. Most of the procedure references have been superceded.

Immediate actions taken:

Documented in IR Recommended Actions:

1. Review and revise procedure 101.4 to ensure alignment with the ODCM and company / OC environmental procedures. Reviewing groups include Environmental, Chemistry, and Radiation Protection.
2. Upgrade procedure to current formatting standards.
3. Update references.

What activities, processes, or procedures were involved?

Procedure 101.4; training Why did the condition happen?

TBD N

What are the consequences?

Incorrect response to water accumulation in the RCA.

http://eamgzenco.ceco.com/lcaD/servlet/RenortARServiet A/11Q/gNNQ I1I9Q

AR - Assignment Report Page 2 of 3 Were any procedural requirements impacted?

TBD Were there any adverse physical conditions?

N/A List of knowledgeable individuals:

Deckman / Nelson / Vouglitois / Birkmire Operable Basis:

N/A Reportable Basis:

N/A Reviewed by: GARY G FLESHER 05/20/2009 19:05:00 CDT Reviewer Comments:

none SOC Reviewed by: THOMAS S LONSDALE 05/22/2009 09:35:24 CDT SOC Comments:

05/22/09 SOC: Close to action created. Sig. 5 enhancement.

Assignments Assign #: 01 Assigned To: Status: COMPLETE Aft Fac: Oyster Creek Prim Grp: ACAPALL Due Date: 05/25/2009 Assign Type: TRKG Sec Grp: Orig Due Date: pp/pp/pppp Priority:

Schedule Ref:

Unit Condition:

Subject/Description: TRNG - IMPROVEMENTS IDENTIFIED FOR PROCEDURE 101.4 Assign #: 02 Assigned To: U777RJA Status: COMPLETE Aft Fac: Oyster Creek Prim Grp: A5332CHEM Due Date: 06/05/2009 Assign Type: ACIT Sec Grp: Orig Due Date: 06/05/2009 Priority:

Schedule Ref:

Unit Condition:

Subject/Description: Chemistry to Review IR Recommended actions for PCRA.

Assign #: 03 Assigned To: U777RJA Status: ACC/ASG Aft Fac: Oyster Creek Prim Grp: A5332CHEM Due Date: 07/07/2009 Assign Type: PCRA Sec Grp: Orig Due Date: 07/07/2009 Priority:

Schedule Ref:

Unit Condition:

http://eamgenco.ceco.com/caD/servlet/RenortARServlet ~;1Q90 6/1 o/gmm

AR - Assignment Report Page 3 of 3 I Subject/Description: Revise Procedure 101.4 into the EXELON Format I I

http://eamgenco.ceco.com/caD/servlet/RenortARServlet i* /1 (19113

  • °;* **;*
  • ' ** **!**;* *' *;*

==== = == = ==.. == = == ==.. .. .... .. .. . .. .. .. ... .. ... ...

!!i iiii i?[i.............i~

";i1 11*i ; 12 : *i .. .. ... . ...

. ........ ~~~...........  : :: :: :: ::

ii?

ii ii?

i? ?ii?i ?ii ii i?? i~ ii ii i?? i? !??..............? ????i ?? ??

AR - Assignment Report Page-1 of 3 Go Back Print I.New Search I Home AR 00922841 Report Aft Fac: Oyster Creek AR Type: CR Status: APPROVED Aft Unit: NA Owed To: A5332CAP Due Date: 06/21/2009 Aft System: 180 Event Date: 05/22/2009 CR 4/D Disc Date: 05/22/2009 Level/Class:

How H02 Orig Date: 05/22/2009 Discovered:

WR/PIMS AR: Component #:

Action Request Details

Subject:

PRESENCE OF XENON IN SAMPLE AT COND. EXCAVATION SITE

Description:

Originator: ROBERT 3 ARTZ Supv Contacted: M. Nixon Condition

Description:

In routine sampling of water from the excavation site on 04/14/09, a sample was found to have positive activity for tritium and xenon-135 (Xe-135). The State of New Jersey asked for an evaluation why other fission products were not found.

In Oyster Creek's steam-water cycle, steam containing various radionuclides passes from the reactor pressure vessel through the various turbine stages and after condensing becomes condensate. This condensate is pumped to the condensate demineralizer vessels where impurities, including radionuclides are removed. Thus almost all fission products are removed by the condensate demineralizers therefore they are not normally seen in the CSt samples. However, tritium and noble gases are not removed in the condensate demineralizers. Since January 01, 2009, for the weekly andmost recently daily sampling of the CST, Xe-135 has been found in the CST three times out of 23 samples.

Tritium, being an isotope of hydrogen is incorporated in the water molecule, which can exist as steam or liquid water. The condensate demineralizers do not remove water, and therefore do not remove tritium.

The condensate demineralizers do not remove noble gases either. While the steam-jet air ejectors remove most noble gases and other non-condensable gases prior to the condensate demineralizers, the SJAEs are not 100%

efficient at removing all the noble gases. In the steam-water cycle, downstream of the condensate demineralizers, the condensate can be directed to either feedwater or the condensate storage tank (CST).

The noble gas, xenon-135 (Xe-135) has several unique characteristics:

1. It is a fission product having a half-life of 9.10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br />.

Significantly, Xe-135's fission yield from U-235 is rather high - on the order of 6.54%.

2. It is formed via Isomeric Transition (IT) from Xe-135m (another fission product), which has a half-life of 15.3 minutes.
3. It is also formed from Xe-134 via a neutron, gamma reaction. Xe-134 is one of those fission products that is stable and its fission yield is 7.87.% which is even higher than Xe-135's
4. Xe-135 is also produced by.the decay of iodine-135 (1-135), which has a half-life of 6.57 hours6.597222e-4 days <br />0.0158 hours <br />9.424603e-5 weeks <br />2.16885e-5 months <br /> although most 1-135 would be removed by the http://eamgenco.ceco.com/cap/servlet/RenortARServlet (*11 QI")(*Q iiOl~O

AR - Assignment Report Page 2 of 3 condensate demineralizers so the contribution of 1-135 to produce Xe-135 would be expected to be quite small.

As stated above, the condensate demineralizers do not remove noble gases such as Xe-135. Some condensate is automatically transferred to the CST via a level control system and hence, Xe-135 can be placed into the CST as well.

The Xe-135 was, correctly identified because of a decay study that was performed in which the radionuclide followed the decay rate according to its half-life. e Therefore the water found in the pit containing tritium and xenon-135 is not an unexpected result. The condensate demineralizers remove the vast majority of fission products and activation products.

Immediate actions taken:

Accelerated sampling of intake, discharge and various wells around the site.

Recommended Actions:

Close to trend. IR submitted to document why only tritium and xenon-135 were found in the water sample.

What activities, processes, or procedures were involved?

Routine sampling of electrical cable vault.

Why did the condition happen?

Leak from underground piping carrying condensate transfer water.

What are the consequences?

Discharge of tritiated water to the environment.

Were any procedural requirements impacted?

None List of knowledgeable individuals:

3. Vouglitois, 3. Kandasamy, M. Nixon, R. Wiebenga, D. Odell Repeat or similar condition?

No Operable Basis:

N/A Reportable Basis:

N/A SOC Reviewed by: LYNDA FILEPPI 05/27/2009 10:24:11 CDT SOC Comments:

CCT 5-22-09: Discussed with originator regarding ESW cable vault.

Originator erroneously wrote ESW cable vault sample when he meant to say excavation pit sample. According to sample data, no gamma has been detected in ESW cable vault above LLD.

05/27/09 SOC: Close to trend and actions taken.

Reviewed by: HERBERT G TRITT II 05/22/2009 10:31:39 CDT Reviewer Comments:

none Dynamic AR Attributes http://eamgenco.ceco.com/cap/servlet/ReportARServlet 11/1Q/') n0Q

AR - Assignment Report Page 3 of 3 KEYWORD: ENV Assignments Assign #: 0__ Assigned To: Status: COMPLETE Aft Fac: Oyster Creek Prim Grp: ACAPALL Due Date: 05/27/2009 Assign Type: TRKG Sec Grp: Orig Due Date: pp/pp/pppp Priority:

Schedule Ref:

Unit Condition:

Subject/Description: PRESENCE OF XENON IN SAMPLE AT COND. EXCAVATION SITE http://eamgenco.ceco.com/cal)/servlet/ReiportARServlet /QI.O 6q/1 Q/?.O3nQ

i

~KY '7 ~Remote User TAYLCC http://eamgenco.ceco.com/cap/servlet/Rep 06/19/09 12:41 PM

=

===== ..= ... = .=.....

====  :

==

===== === == =====.. ..........  ;:

iiiiiiiii. ............

i ............ .. iii ii i..

ii

...i..

i i....

ii *  !!

.. ...... ...... = == = == == = == =

. . ...... = = == = = = == = = == = = =

. == = == == = == = == = == =

AR - Assignment Report Page I of 2 Go Back Print I New Search Home AR 00924730 Report Aft Fac: Oyster Creek AR Type: CR Status: APPROVED Aft Unit: NA Owed To: A5311CAP Due Date: 06/27/2009 Aft System: - Event Date: 05/27/2009 CR 4/D Disc Date: 05/27/2009 Level/Class:

How H02 Orig Date: 05/28/2009 Discovered:

WR/PIMS AR: A2225485 Component #: 168 Action Request Details

Subject:

SAFETY - HATCH AT INTAKE STRUCTURE IS STUCK CLOSED

Description:

Originator: PHILIP E OLIVIERI Supv Contacted: Jhansi Kandasamy Condition

Description:

Currently, sampling the intake structure for large volumes of water to support the tritium ACMP requires chemistry technicians to lift a diamond plate grate between the trash rake grates and the traveling screens. This has been reviewed for safety and personnel are required to wear life vests while sampling and fall pirotection is not required since it is less than six feet to the water surface. Although this task can be performed safely, it is preferred to sample the intake from a hatch located in front of the trash rake grate.

Security has replaced the old rusted lock with an MB1 lock so technicians can access the hatch. The hatch does not open due to physical damage from some unknown event. This hatch needs to be repaired so it will open and close freely. Sampling from this hatch is the safest way to sample the intake structure and should be addressed. Sampling by removing the diamond plate in front of the screens is a safety concern, requires security support daily, an FME concern, and physically challenging, which can be eliminated by repairing this hatch.

Immediate actions taken:

Supervisor notified, current sampling practice reviewed for safety, initiated IR Recommended Actions:

Repair the hatch so that samples can be taken in a safer and more time conducive manner.

What activities, processes, or procedures were involved?

Sampling Intake structure for tritium monitoring and NJPDES permit requirements Why did the condition happen?

unknown What are the consequences?

Potential safety issues challenging technicians on a daily basis Were any procedural requirements impacted?

No.

httt):Heamizenco.ceco.com/can/gerv1 et/R enort AR Se-rvii-t A / I () /1) Ano i;1O'Af

AR - Assignment Report Page 2 of 2 Were there any adverse physical conditions?

FME concern lifting diamond plate, sampling from a opening that personnel could potentially fit through opposed to an opening less than lft square List of knowledgeable individuals:

Leanne-Birkmire, Philip Olivieri, Jhansi Kandasamy Operable Basis:

N/A Reportable Basis:

N/A Reviewed by: HERBERT G TRITT 11 05/28/2009 20:47:23'CDT Reviewer Comments:

none SOC Reviewed by: RONALD W FITTS 05/29/2009 07:13:28 CDT SOC Comments:

INTAKE STRUCTURE & CANAL 5/29/09 rwf - close to pims ar pri 5 om.

Dynamic AR Attributes INDUSTRIAL SAFETY: Y Assignments Assign #: 01 Assigned To: Status: COMPLETE Aft Fac: Oyster Creek Prim Grp: ACAPALL Due Date: 06/02/2009 Assign Type: TRKG Sec Grp: Orig Due Date: pp/pp/pppp Priority:

Schedule Ref:

Unit Condition:

Subject/Description: SAFETY - HATCH AT INTAKE STRUCTURE IS STUCK CLOSED http://eamgenco.ceco.com/cai)/servlet/RevortARServiet d~ /0l ci/1 Qo'nnQ

Remote User TAYLCC http://eamgenco.ceco.com/cap/servlet/Rep 06/19/09 1241 PM

==

= = =.= = = ==.=.....

= .... . .... ..

"iiii i i i l. . . . .

........ ===

....... ===

; : :' = === == ==... .. ..

=

... ... ..... ...= = = = = = = = =

. .. ..  ::  : : = = = = = = = = = = = = = =

AR - Assignment Report Page I of 2 O Go Back Print l New Search Home AR 00925296 Report Aft Fac: Oyster Creek AR Type: CR Status: APPROVED Aft Unit: NA Owed To: A5322CAP Due Date: 06/28/2009 Aft System: 858 Event Date: 05/29/2009 CR 4/D Disc Date: 05/29/2009 Level/Class:

How H02 Orig Date: 05/29/2009 Discovered:

WR/PIMS AR: A2225331 Component #: P-57-1 Action Request Details

Subject:

CHEMISTRY LAB VACUUM PUMP NEEDS REPAIR

Description:

Originator: GARY XXINACTIVE-TEST Supv Contacted: Leanne Birkmire, Chemistry Condition

Description:

On 05/29/09 the Chemistry Lab'Vacuum Pump was being used for routine daily analysis. The pump was seen to be smoking and a smell of burning rubber was present.

Immediate actions taken:

Turned off the pump, control room was notified of issue and chemistry supervisor was notified.

Recommended Actions:

Repair or replace the pump. This pump is used daily by chemistry for analysis within the lab and is currently being used to support the tritium project.

Operable Basis:

N/A Reportable Basis:

N/A Reviewed by: HERBERT G TRITT II 05/29/2009 16:55:14 CDT Reviewer Comments:

none SOC Reviewed by: RONALD W FITTS 06/01/2009 09:25:54 CDT SOC Comments:

VACUUM PUMP FOR CHEMISTRY LAB AUXILIARY GASES 6/1/09 rwf close to pims ar A2225331 pulled through as pri 3 em.

Assignments Assign #: 01 Assigned To: Status: COMPLETE Aft Fac: Oyster Creek Prim Grp: ACAPALL Due Date: 06/03/2009 Assign Type: TRKG Sec Grp: Orig Due Date: lIp/pp/pppp http://eamgenco.ceco.com/cap/servlet/ReDortARServlet */1 Q/Ot3I*Q

AR - Assignment Report Page 2 of 2 Priority:

Schedule Ref:

Unit Condition:

Subject/Description: CHEMISTRY LAB VACUUM PUMP NEEDS REPAIR http://eamgenco.ceco.com/cai)/servlet/ReinortARServlet 6/11Q/'nno 61Q90

TAYLCC http://eamgenco.ceco.com/cap/servlet/Rep 06/19/09 12:41 PM

... .....  !!i i ii

======================...............ii~

.. . ... . = ==

.. ==...

... = ...

==..

. . . ...... . . .. = = = = = = = == == = == = =

AR - Assignment Report Page I of 2 O Go Back Print INew Search Home AR 00925296 Report Aft Fac: Oyster Creek AR Type: CR Status: APPROVED Aft Unit: NA Owed To: A5322CAP Due Date: 06/28/2009 Aft System: 858 Event Date: 05/29/2009 CR 4/D Disc Date: 05/29/2009 Level/Class:

How H02 Orig Date: 05/29/2009 Discovered:

WR/PIMS AR: A2225331 Component #: P-57-1 Action Request' Details

Subject:

CHEMISTRY LAB VACUUM PUMP NEEDS REPAIR

Description:

Originator: GARY XXINACTIVE-TEST Supv Contacted: Leanne Birkmire, Chemistry Condition

Description:

On 05/29/09 the Chemistry Lab Vacuum Pump was being used for routine daily analysis. The pump was seen to be smoking and a smell of burning rubber was present.

Immediate actions taken:

-Turned off the pump, control room was notified of issue and chemistry supervisor was notified.

Recommended Actions:

Repair or replace the pump. This pump is used daily by chemistry for analysis within the lab and is currently being used to support the tritium project.

Operable Basis:

N/A Reportable Basis:

N/A Reviewed by: HERBERT G TRITT II 05/29/2009 16:55:14 CDT Reviewer Comments:

none SOC Reviewed by: RONALD W FITTS 06/01/2009 09:25:54 CDT SOC Comments:

VACUUM PUMP FOR CHEMISTRY LAB AUXILIARY GASES 6/1/09 rwf close to pims ar A2225331 pulled through as pri 3 em.

Assignments Assign #: 01 Assigned To: Status: COMPLETE Aft Fac: Oyster Creek Prim Grp: ACAPALL Due Date: 06/03/2009 Assign Type: TRKG Sec Grp: Orig Due Date: pp/pp/pppp http://eamgenco.ceco.com/cap/servlet/ReportARServlet 6/19/2009

AR - Assignment Report Page 2 of 2 Priority:

Schedule Ref:

Unit Condition:

Subject/Description: CHEMISTRY LAB VACUUM PUMP NEEDS REPAIR http://eamgenco.ceco.comncap/servlet/ReportARServlet 6/19/2009

Remote User TAYLCC http://eamgenco.ceco.com/cap/servlet/Rep 06/19/09 12:41 PM

. .. . . ... .. : : : : : : :  : :  : :  : :  : :.. .. . .. . .  :  :  : 1. . . . . . . . .

=

==== == =

= ==== =. .. .... . .. ..... .. . .. .. .

"i~iii!!ii  !!iii ii~ i~ iii!............. i~ i

":[:((.....................:

: : : '. . . .. .... .. ..... .. .. ..... .. . . . . . . . .I. . . .

AR - Assignment Report Page I of 3 Go Back Print I New Search Home AR 00925996 Report Aff Fac:. Oyster Creek AR Type: CR Status: APPROVED Aff Unit: 01 Owed To: A5320CAP Due Date: 11/17/2009 Aff System: -- Event Date: 05/31/2009 CR 4/D Disc Date: 05/31/2009 Level/Class:

How H02 Orig Date: 05/31/2009 Discovered:

WR/PIMS AR: Component #:

Action Request Details

Subject:

CCP - SITE WALKDOWN FOR ENVIRON CONCERNS

Description:

Originator: THOMAS A DUNN Supv Contacted: Herb Tritt Condition

Description:

A walk down of the Site was conducted to identify environmental vulnerabilities. The following concerns were identified:

- 1. Both USSIA3 and USS1B3 electrical transformers have moats around them with drain valves. The drain valves have no valve numbers and are not locked closed. The drain valves on the SBO Xfmr and EDG waste oil tank are both locked closed. Suggest Valves be identified, labeled and locking closed with MIB key.

2. There is a washout around sampling well MW-54 that was identified in IR 925330. The washout exposes soil, which, if there were some kind of leak, could become contaminated instead of just rocks.
3. There is a Bldg. #3 Ingersoll-Rand air compressor installed on the west side of the bldg. that:

a) has no catch containment under the unit.

b) air receiver valving is not identified or labeled.

4. There are 3 large vinyl looking temporary black moats that contain substantial amounts of water. Not sure who has the responsibility to assure these temporary moats are maintained sampled & drained to minimize worst-case scenarios.

a) Huge Exelon Blue Trailer west of new demineralized Water Storage Tank has 5 inches of water in the SW corner of its moat.

b) 2 moats, 1 for each staged transformer just south of the FIN shop has water.

5. The spill kit station just NE of the Main Fuel Oil Moat is not labeled and does not have a kit checklist.
6. An 11 h.p. hydraulic (what looks like a pave roller) machine has an inadequate containment. The handle-operating unit that contains hydraulic lines has no catch containment directly underneath these lines. The unit and its partial containment should be moved off of the stones on the East side of the site just outside the Jingoli trailer.
7. Security Vehicle 4688 was parked on stones just North of the maintenance bldg. with no occupancy.

http://eamgenco.ceco.com/cap/servlet/ReportARServlet 6/19/2009

I AR - Assignment Report Page 2 of 3 Immediate actions taken:

Notified Security and they had security vehicle 4688 moved.

Recommended Actions:

Assign responsibilities to address each environmental vulnerability concern.

Operable Basis:

N/A Reportable Basis:

N/A Reviewed by: HERBERT G TRITT II 05/31/2009 17:32:30 CDT Reviewer Comments:

none SOC Reviewed by: RONALD W FITTS 06/04/2009 09:29:21 CDT SOC Comments:

6/3/09 RCL: ACIT assigned to engineering for item 1 to identify moat drain valve tag numbers to operations for labeling OR to issue new tag numbers.

6/3/09 rwf - item 2) close to existing pims'ar A2225480.

6/3/09 JMN: Item 3 - I believe it is Building #4 that has a compressor outside the west wall, it is an electric compressor which is surrounded by.

asphalt and does not require catch containment. Item 4a Site Tritium Management Team will manage draining the FRAC Tank Moat. Item 4b - These moats are included in the Chemistry Outside Tour Sheets and drained weekly as required. Item 5 - This will be addressed under IR 00882827 03 Follow-up Maint 6/4/09 rwf - item 3) the air compressor is actually beside building 4 and is electric with minimal oil inside. No containment is needed.

item 6) - this equipment has been removed from site. Discussed with Jingoli Site Manager who understands the issue identified and will install containment if the unit is brought back on site.

item 7) - the vehicle has been moved, close to actions created/taken.

6/4/09 SOC close to actions taken Dynamic AR Attributes KEYWORD: ENV Trend Codes TC1 TC2 TC3 Proc Org Rank ECY102, *

AR - Assignment Report Page 3 of 3 Assign Type: TRKG Sec Grp: Orig Due Date: pp/pp/pppp Priority:

Schedule Ref:

Unit Condition:

Subject/Description: CCP - SITE WALKDOWN FOR ENVIRON CONCERNS Assign #: 02 Assigned To: U777DJA Status: ACC/ASG Aff Fac: Oyster Creek Prim Grp: A5352NESDM Due Date: 11/17/2009 Assign Type: ACIT Sec Grp: Orig Due Date: 08/06/2009 Priority:

Schedule Ref:

Unit Condition:

Mech Dwg update - For item 1 of IR, identify moat drain valve tag numbers for USS1A3 Subject/Description: and USS1B3 and provide informationto Operations to have labeled OR issue new tag numbers and have Operations label the valves.

http://eamgenco.ceco.com/cap/servlet/ReportARServlet 6/19/2009

Remote User TAYLCC http :lleamgenco.ceco.com/cap/servletlRep 06/19/09 12:46 PM

== ========= == ... .. .. .. ... .. ...  ; ;

= = == = ==== == == = =.

== == =. .... .. ...:

AR - Assignment Report Page I of 2 Go Back Print I New Search Home AR 00926251 Report Aff Fac: Oyster Creek AR Type: CR Status: APPROVED Aft Unit: 01 Owed To: A5332CAP Due Date: 07/01/2009 Aft System: -- Event Date: 06/01/2009 CR 4/D Disc Date: 06/01/2009 Level/Class:

How H02 Orig Date: 06/01/2009 Discovered:

WR/PIMS AR: A2225520 Component #: 126 Action Request Details

Subject:

WELL TESTING REQUIRED TO SUPPORT TRITIUM INVESTIGATION

Description:

Originator: JAMES J VOUGLITOIS Supv Contacted: M. Nixon Condition

Description:

As part of the ongoing investigation of the tritiated water that leaked from underground pipes, a new monitoring/pumping well (W-55) was installed in the roadway near the Condensate Storage Tank on 05/26. This new well now needs to be tested by our contractor, Conestoga Rovers & Associates (CRA). The testing includes three phases: 1) Well Development - Pumping the well for a period of approximately 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> to remove excess sediment,

2) Step-Drawdown Test - Pumping the well at various flow rates over an 8-hour period to determine the maximum sustainable flow, and 3) Long-Term Aquifer Pumping Test - Pumping the well at a constant rate for a 48-hour period to evaluate the impact of continuous pumping on the aquifer. All of this work will be performed by our contractor, CRA, in accordance with their proposal dated 05/28/09. Senior Management wishes to have Phase 1 implemented by the end of this week or early next week at the latest. This IR is being written to generate an AR to provide the required plant support and get the work on the schedule.

Immediate actions taken:

Discussed proposed work with M. Sullivan and provided him with a copy of the proposal.

Recommended Actions:

Pull AR through to support this work.

What activities, processes, or procedures were involved?

Investigation of the tritiated water that leaked from underground pipes.

Why did the condition happen?

Need to continue the investigation of the tritiated water that leaked from underground pipes.

What are the consequences?

NA Were any procedural requirements impacted?

NA Were there any adverse physical conditions?

NA http://eam~enco.ceco.com/cap/servlet/ReportARServlet 6/19/2009

AR - Assignment Report Page 2 of 2 List of knowledgeable individuals:

J. Vouglitois, J. Kandasamy, M. Nixon, M. Sullivan, C. Donovan Repeat or similar condition?

No Operable Basis:

N/A Reportable Basis:

N/A Reviewed by: HERBERT G TRITT II 06/01/2009 15:37:34 CDT Reviewer Comments:

none.

SOC Reviewed by: RONALD W FITTS 06/02/2009 15:46:55 CDT SOC Comments:

UNDERGROUND-OTHER 6/2/09 rwf - close to pims ar A2225520 pulled through as pri 3 em.

Assignments Assign #: 01 Assigned To: Status: COMPLETE Aft Fac: Oyster Creek Prim Grp: ACAPALL Due Date: 06/06/2009 Assign Type: TRKG Sec Grp: Orig Due Date: pp/Jp/pl/pp Priority:

Schedule Ref:

Unit Condition:

Subject/Description: WELL TESTING REQUIRED TO SUPPORT TRITIUM INVESTIGATION http://eamgenco.ceco.con/cap/servlet/ReportARServlet 6/19/2009

.. i i i i! ! !i~

:::::: i ii i i.... i~ i ii i

...... .: : : == == = == == = == == = == =

... ........ .. ... .....il li !!!! !i

AR - Assignment Report Page l'of 2 Go Back Print I New Search Home AR 00927310 Report Aff Fac: Oyster Creek AR Type: CR Status: APPROVED Aft Unit: NA Owed To: A5332CAP Due Date: 07/03/2009 Aft System: -- Event Date: 06/01/2009 CR 4/D Disc Date: 06/01/2009 Level/Class:

How H02 Orig Date: 06/03/2009 Discovered:

WR/PIMS AR: Component #:

Action Request Details

Subject:

FALSE POSITIVE TRITIUM FROM ANALYSIS OF WELL WATER

Description:

Originator: JAMES J VOUGLITOIS Supv Contacted: J. Kandasamy Condition

Description:

As part of the ongoing investigation of the tritiated water that leaked from underground pipes, monitoring well MW-1I-1A was sampled on 05/27/09.

The Chemistry Department filtered and analyzed this water sample in accordance with CY-OC-130-530 "Tritium Analysis Liquid Samples'. The results of the analysis showed 83,000 pCi/L tritium. This result was inconsistent with the facts that all prior samples from this well showed no detectable tritium, and that the well is located in an area not believed to be impacted by the pipe leaks. Suspecting a false positive result due to interferences caused by sediment or micro-organisms in the sample, the sample was distilled and re-analyzed in accordance with CY-OC-130-530. The result of the re-analysis was less than the lower limit of detection.

Immediate actions taken:

Discussed the anomalous result with the Chemistry Supervisor and requested the distallation/re-analysis.

Recommended Actions:

Close to trend.

What activities, processes, or procedures were involved?

Analysis of well water samples in accordance with CY-OC-130-530 "Tritium Analysis Liquid Samples" Why did the condition happen?

Interferences caused by sediment or micro-organisms in the sample.

What are the consequences?

None - The distallation and re-analysis in accordance with the procedure eliminated the interferences.

Were any procedural requirements impacted?

No - The analysis and re-analysis were performed in accordance with the procedure ( CY-OC-130-530 "Tritium Analysis Liquid Samples").

Were there any adverse physical conditions?

NA http://eamzenco.ceco.com/cap/servlet/RenortARServlet 6/19/2009

AR - Assignment Report Page 2 of 2 List of knowledgeable individuals:

J. Kandasamy, L. Birkmire, J. Vouglitois Repeat or similar condition?

No - not as part of this investigation.

Operable Basis:

N/A Reportable Basis:

N/A Reviewed by: HERBERT G TRITT II 06/03/2009 12:05:09 CDT Reviewer Comments:

none SOC Reviewed by: THOMAS S LONSDALE 06/08/2009 10:21:14 CDT SOC Comments:

06/08/09 LF - Close to trend as recommended.

Dynamic AR Attributes KEYWORD: ENV Assignments Assign #: 01 Assigned To: Status: COMPLETE Aft Fac: Oyster Creek Prim Grp: ACAPALL Due Date: 06/08/2009 Assign Type: TRKG Sec Grp: Orig Due Date: pp/ipp/pppp Priority:

Schedule Ref:

Unit Condition:

Subject/Description: FALSE POSITIVE TRITIUM FROM ANALYSIS OF WELL WATER http://eamgenco.ceco.com/cap/servlet/ReportARServlet 6/19/2009

Remote User TAYLCC http://eamgenco.ceco.com/cap/serviet/Rep 06/19/09 12:47 PM

==

= == == = = = = = = = .= = = .. = = .. .. .. . . .... .... .. . .. .. .

===== == = ==== == = = == = = *. . . . . . . . . . . . . . .. . .

= ... = ..= == = == = = = . .. . . . . . . . . ..

AR - Assignment Report Page 1 of 2 O Go Back I Print New Search Home AR 00927369 Report Aft Fac: Oyster Creek AR Type: CR Status: APPROVED Aft Unit: NA Owed To: A5301CAP Due Date: 07/10/2009 Aft System: -- Event Date: 04/15/2009 CR 4/D Disc Date: 06/01/2009 Level/Class:

How H02 Orig Date: 06/03/2009 Discovered:

WR/PIMS AR: Component #:

Action Request Details

Subject:

NEI NOT FORMALLY NOTIFIED PER RAD 1.34 FOR TRITIUM LEAK

Description:

Originator: CALVIN C TAYLOR Supv Contacted: Pam Cowan Condition

Description:

Following the positive sample for elevated tritium level in the ESW cable vault and subsequent elevated sample in a monitoring well, NEI was not formally notified at the email address (GWNotice@nei.org) as required by LS-AA-120, Reportable Event RAD 1.34, Industry Groundwater Protection Initiative (GPI) Voluntary Communication. Environmental stated that NEI was notified; however, a record of emailing the specific email address specified in RAD 1.34 has not been identified. ANS was notified by Reg Assurance as required by RAD 1.34 the morning after the leak was identified and RA has been updating the ANS Account Engineer.

Immediate actions taken:

None required.

Recommended Actions:

Submit an NER regarding this and other lessons learned from implementation of RAD 1.34 for the tritium event.

Operable Basis:

N/A Reportable Basis:

N/A Reviewed by: HERBERT G TRITT II 06/03/2009 16:23:58 CDT.

Reviewer Comments:

none SOC Reviewed by: MATTHEW J NIXON 06/10/2009 08:10:48 CDT SOC Comments:

06/08/09 SOC: Follow-up Chem 6/10/09 JMN: Created NER assignment for Regulatory Assurance to submit an NER regarding this and other lessons learned from implementation of RAD 1.34 for the tritium event.

Trend Codes http://eamzenco.ceco.com/cat/servlet/RenortARServiet 6,/1Q/") (*OJQ

AR - Assignment Report P age 2 of 2 TC1 TC2 TC3 Proc Org Rank EOR302 *

  • LS02 RA Assignments Assign #: 01 Assigned To: Status: COMPLETE Aft Fac: Oyster Creek Prim Grp: ACAPALL Due Date: 06/08/2009 Assign Type: TRKG Sec Grp: Orig Due Date: pp/pp/pppp Priority:

Schedule Ref:

Unit Condition:

Subject/Description: NEI NOT FORMALLY NOTIFIED PER RAD 1.34 FOR TRITIUM LEAK Assign #: 02 Assigned To: Status: NTFY/PRI Aft Fac: Oyster Creek Prim Grp: A5301RAPR Due Date: 07/10/2009 Assign Type: NER Sec Grp: Orig Due Date:

Priority:

Schedule Ref:

Unit Condition:

Subject/Description: Regulatory Assurance to submit an NER regarding this and other lessons learned from implementation of RAD 1.34 for the tritium event.

http://eamzenco.ceco.corncap/servlet/ReportARServlet 6/19/2009

Remote User TAYLCC http://eamgenco.ceco.com/cap/servlet/Rep 06/19/09 12:48 PM

== ...... == =.=. .. =. .... .... ... ..

AR - Assignment Report Page 1 of 3 0Go Back Print New Search Home AR 00928211 Report Aft Fac: Oyster Creek AR Type: CR Status: APPROVED Aft Unit: NA Owed To: A5332CAP Due Date: 07/05/2009 Aft System: -- Event Date: 06/04/2009 CR 3/D Disc Date: 06/04/2009 Level/Class:

How H02 Orig Date: 06/05/2009 Discovered:

WR/PIMS AR: Component #:

Action Request Details

Subject:

TRITIUM RESULTS FROM UNDERGROUND VAULT INSPECTIONS

Description:

Originator: JHANSI R KANDASAMY Supv Contacted: Pete Orphanos, Dave Dicello Condition

Description:

Tritium Sample analysis were performed on water found in electrical vaults and one pipe vault in support of scheduled cable and pipe inspections.

The work orders are R2139427 and C02019960.

Two out of four vaults were found with Tritium activity:

1. Electrical Vault located near the MIA Xfmr (SBO MH-1) - 102,000pCi/l -

previous inspection performed in February 2009 was LLD - This vault is in the vicinity of the other Monitoring wells in review for the Tritium issues managment team.

2. SE RB pipe vault - located inside of the RCA - 14, 200pCi/l - This vault has had history of Tritium activity in the past - in the vicinity of the ISO condenser vent condensation run off.
3. Switchyard vault on the opposite side of the canals was LLD.
4. The Vault at the CTs was LLD. This is located at the backsite Forked River, Combustion Turbine area There were no Gamma activity in the samples.

Regulatory Assurance performed a reportability review and determined both positive results to be not reportable due to previous reports on the GW tritium inspection and Iso-condenser activities Immediate actions taken:

Completed data review of the results and past results.

Completed reportability review Generated the IR for further actions Recommended Actions:

Complete an EOC review of the following and any other potential concerns http://eamaenco.ceco.com/caD/servlet/ReDortARServlet 41ý/1 Q/9('lf3 lO/00

AR - Assignment Report Page 2 of 3 with other vaults including potential contributers of Tritium activity in the following:

AR A2205002 documents the inspection of the pipe vault - There are six pipes in the vault requiring inspection as listed below

1) 4 INSTRUMENT AIR LINE (CS-10)
2) 4 INSTRUMENT AIR LINE 2 (CS-11
3) 2 LAUNDRY DRAIN LINE (CS-6)
4) 3 REACTOR BUILDING SUMP LINE (CS-7)
5) 2 DWEDT LINE (CS-8).
6) A 14 INCH CONTAINMENT SPRAY LINE There are two lines in the vcinity of the MIA transformer vault - that also need to be reviewed as EOC:
1) 4" abondoned Demin water line
2) 12" FP line The water pumped out of the SE RB vault will be pumped into a FRAC tank instead of processing through RW.

What activities, processes, or procedures were involved?

Environmental stewardship for, Vault inspections - sampling of water found in vaults List of knowledgeable individuals:

Jay Vouglitois, Matt, Nixon, Tom Dunn, the leadership team.

Operable Basis:

N/A Reportable Basis:

No Reportability Thresholds have been exceeded Reviewed by: THOMAS A DUNN 06/05/2009 21:52:02 CDT Reviewer Comments:

Reg. Assurance has concurred with no reportability issues. T.A.Dunn SOC Reviewed by: THOMAS S LONSDALE 06/12/2009 09:31:23 CDT SOC Comments:

6/8/09 TAP - Sig 3 due to contamination levels significantly above normal levels. Risk and uncertainty Low / Moderate.

6/10/09 JMN: Created ACIT for Chemistry to complete an EOC sample review of the following and any other potential concerns with other vaults including potential contributers of Tritium activity in the following:

AR A2205002 documents the inspection of the pipe vault - There are six pipes in the vault requiring inspection as listed below

1) 4 INSTRUMENT AIR LINE (CS-10)
2) 4 INSTRUMENT AIR LINE 2 (CS-11
3) 2 LAUNDRY DRAIN LINE (CS-6)
4) 3 REACTOR BUILDING SUMP LINE (CS-7)
5) 2 DWEDT LINE (CS-8).

6/11/09 RCL: Discussed with underground piping engineer. There are PMs in place to inspect pipes in the southeast vault on a 2 year frequency. The tritium water found in the southeast vault has been attributed to prior isolation condenser initiation events and leakage from the isolation condenser vents during normal operations. A clean water source of makeup to the isolation condensers has been installed at the site to eliminate.,

future releases of tritium.from the isolation condensers during initiation events. The tritium water that was found in the electrical vault by the http://eamzenco.ceco.com/cap/servlet/RenortARServlet 6/19/2009

AR - Assignment Report Page 3 of 3 main power transformers can be attributed to the leak that was repaired in the general area during 1F20 and addtional inspections that were performed (work completed on AR A2222268 which also includes one inspection for the CRD return line is currently scheduled under that AR, the rest being complete). The two potential "sources" identified in the body of this IR do not contain tritium water and therefore can not be a potential source of tritium water in this vault. Close to actions taken, sample PMs, and trending.

Assignments Assign #: 01 Assigned To: Status: COMPLETE Aff Fac: Oyster Creek Prim Grp: ACAPALL Due Date: 06/10/2009 Assign Type: TRKG Sec Grp: Orig Due Date:

Priority:

Schedule Ref:

Unit Condition:

Subject/Description: TRITIUM RESULTS FROM UNDERGROUND VAULT INSPECTIONS Assign #: 02 Assigned To: U777KCL Status: NTFY/ASG Aff Fac: Oyster Creek Prim Grp:. A5332CHEM Due Date: 06/24/2009 Assign Type: ACIT Sec Grp: Orig Due Date: 06/24/2009 Priority:

Schedule Ref:

Unit Condition:

Chemistry to complete an EOC review of the following and any other potential concerns with other vaults including potential contributers of Tr itium activity in the following: AR A2205002 documents' the inspection of the pipe vault'- There are six pipes in the vault requiring inspection as listed below : 1) 4 INSTRUMENT AIR LINE (CS-10) 2) 4 Subject/Description: INSTRUMENT AIR LINE 2 (CS-11 3) 2 LAUNDRY DRAIN LINE (CS-6) 4) 3 REACTOR BUILDING SUMP LINE (CS-7) 5) 2 DWEDT LINE (CS-8). 6) A 14 INCH CONTAINMENT SPRAY LINE There are two lines in the vcinity of the MIA transforme r vault -.that also need to be reviewed as EOC: 1) 4" abondoned Demin water line 2) 12" FP line http://eamgzenco.ceco.com/cao/servlet/RenortARServiet rill 019?n0 f1Q90