MONTHYEARML24250A1062024-09-0606 September 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24185A1782024-07-0303 July 2024 NRC Email Response to Peach Bottoms Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations ML24163A3522024-05-15015 May 2024 Meeting Feedback from May 14, 2024, Meeting with Constellation on Peach Bottom Atomic Power Station Units Nos. 2 and 3 ML24131A0612024-05-10010 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24122B5072024-05-0101 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-591, Revision 0 ML24088A3192024-03-28028 March 2024 Audit Plan Associated with Peach Bottom, Unit 1 - 10 CFR 50.82(a)(3) Alternate Decommissioning Schedule ML24002A7132023-12-29029 December 2023 Supplement - Peach Bottom Security Rule Exemption Request – ISFSI Docket No. Reference (EPID L-2023-LLE-0032) (Updated) (Email) ML23352A3242023-12-18018 December 2023 Acceptance of Requested Licensing Action Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations (EPID L- 2023-LLN-0004) ML23331A9112023-11-22022 November 2023 Supplement - Peach Bottom Security Rule Exemption Request – ISFSI Docket No. Reference ML23304A0182023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Peach Bottom 2 & 3 - Exemption from Security Rule (L-2023-LLE-0032) ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC – Fleet Request – License Amendment Request to Adopt TSTF-580, Revision 1 ML23237B3972023-08-24024 August 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative Request to Use Updated BWRVIP Guidelines ML23163A2292023-06-12012 June 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-580, Revision 1 ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22325A0052022-11-18018 November 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-273-A, Revision 2 ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22118A3312022-04-28028 April 2022 NRR E-mail Capture - Peach Bottom - Formal RAI for Proposed Alternative I5R-14, Revision 1 ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22024A1852022-01-24024 January 2022 Acceptance for Review of Relief Request Associated with Reactor Pressure Vessel N-16A Nozzle Repair ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0482021-09-0707 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21134A0152021-05-14014 May 2021 Acceptance Ventilation Filter Testing LAR ML21117A0442021-04-26026 April 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21084A2532021-03-24024 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Transfer Application ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21091A1782021-02-0202 February 2021 Ti 2515/194 Inspection Documentation Request ML21033A8552021-02-0202 February 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request to Expand the Use ASME Codes Cases N-878 and N-880 ML21012A1302021-01-12012 January 2021 Request for Additional Information - TSTF-505 ML20357A0972020-12-21021 December 2020 Request for Additional Information - TSTF-505 ML20350B5582020-12-14014 December 2020 NRR E-mail Capture - Exelon Generation Company, LLC -Alternative Request for Documentation of Replacement of Pressure Retaining Bolting ML20343A3492020-12-0707 December 2020 Acceptance of Requested Licensing Action: Peach Bottom Relief Request for N-16 Nozzle ML20324A6472020-11-19019 November 2020 Acceptance of Requested Licensing Action: Peach Bottom One-time Exemption App. B Sect. VI.C.3.(I)(1) Force on Force (COVID-19) ML20314A0282020-11-0606 November 2020 Verbal Relief for Penetration Nozzle ML20283A7722020-10-0909 October 2020 Submittal of Pennsylvania Letter Requesting Exemption from Biennial Exercise Requirements for Pennsylvania Nuclear Power Plants in Calendar Year 2020 ML20276A0762020-10-0202 October 2020 Acceptance of Requested Licensing Action, One-Time Acceptance for Review - Peach Bottom of Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic ML20266G3032020-09-22022 September 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Request to Use Paragraph IWA-5120 of the 2017 Edition of the ASME B&PV Code, Section XI ML20239A7982020-08-25025 August 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet License Amendment Request to Adopt TSTF-568, Revision 2 ML20217L3462020-08-0404 August 2020 Audit Plan Regarding License Amendment Request to Implement Riskinformed Extended Completion Times (L-2020-LLA-0120) ML20191A0182020-07-0101 July 2020 NRR E-mail Capture - Exelon Fleet RR for SPI for Appendix J Valves ML20178A1392020-06-26026 June 2020 Acceptance Review for Peach Bottom - License Amendment Request for TSTF-505 ML20153A7042020-06-0101 June 2020 NRR E-mail Capture - Preliminary RAI for Fleet Request to Use Alternative OMN-26 2024-09-06
[Table view] |
Text
Bower, Fred From: Bower. Fred Sent: Friday, June 04, 2010 7:19 AM To: Powell, Raymond; Prato, Robert; Krohn, Paul; Hughey, John Cc: Ziedonis.
Adam; Tinkler, Charles; Schaperow, Jason
Subject:
RE: Peach Bottom SOARCA Site Visit I am already working with the licensee to see which date is best for them.Once I get that, I will need names as they are on your NRC badge (bring the badge to the site) and SSNs so that you can get access as an escorted visitor.More to follow.37Aad fRipwp Senior Resident Inspector Peach Bottom Atomic Power Station USRNC, Region I, DRP, PB4 El Fred.Bower@NRC.gov 19 717-45g-7614 (worký1(b)(6) 3YjM-P -X (, From: Powell, Raymond Sent: Thursday, June 03, 2010 1:55 PM To: Prato, Robert; Krohn, Paul; Bower, Fred; Hughey, John Cc: Ziedonis, Adam; Tinkler, Charles; Schaperow, Jason
Subject:
RE: Peach Bottom SOARCA Site Visit I don't believe anyone has said you can't walk down the protective measures -I think most comments have been looking to help you gain any efficiencies.
Work with Fred and pick a date.Ray Powell Chief, Technical Support and Assessment Branch Division of Reactor Projects From: Prato, Robert Sent: Thursday, June 03, 2010 1:29 PM To: Krohn, Paul; Bower, Fred; Hughey, John; Powell, Raymond Cc: Ziedonis, Adam; Tinkler, Charles; Schaperow, Jason
Subject:
RE: Peach Bottom SOARCA Site Visit Paul The ACRS request was to walk down the mitigative measures, if we cannot do that maybe we should not go.Again our perspective, objectives and focus will be considerably different from the inspection activities.
We have no plans to impact the region or the residents.
Robert Prato Senior Reactor Operation Engineer NRO / DCIP / CQVA iimbaton in this record v-" de~eted tM aoKkInce with th 9 Freedoa of InfofmflnO l-,w -POWPA T7D43 / 415-6035 From: Krohn, Paul Sent: Thursday, June 03, 2010 11:57 AM To: Bower, Fred; Hughey, John; Powell, Raymond Cc: Ziedonis, Adam; Prato, Robert
Subject:
RE: Peach Bottom SOARCA Site Visit All, Fred raises a good point, We should get what we can from the previous TI and inspection report.That being said, presenting to the ACRS is important and I can understand the desire for the SOARCA engineers to have verified some of the licensee's statements and ascertains.
Therefore, I would recommend some form of a site visit, but with a minimal impact to the resident staff and licensee.Paul From: Bower, Fred Sent: Thursday, June 03, 2010 11:51 AM To: Hughey, John; Krohn, Paul; Powell, Raymond Cc: Ziedonis, Adam; Prato, Robert
Subject:
RE: Peach Bottom SOARCA Site Visit All, A couple of things regarding this request: (k\(7 17 kU\ A A AL Second, it is Exelon policy for visitors to the site to meet with plant management even if they are only here for working level activities.
So I would suggest that if a site visit is necessary, the visit schedule should allow for 1/2 hour long entrance and exit meetings.
If a visit is needed, please let me know if you would like the meeting from 9:30- 10or10 -10:30AM and 1:30 -2or2 -2:30PM?Look forward to your response.
I will not engage the licensee until I know that a visit is required.
Please let me know if you have any questions or comments.Thanks, Fred From: Hughey, John Sent: Thursday, June 03, 2010 10:53 AM To: Bower, Fred; Krohn, Paul; Powell, Raymond Cc: Ziedonis, Adam
Subject:
RE: Peach Bottom SOARCA Site Visit 2 I also want to note that this would be a "working level" visit only (i.e. no meetings w/ plant management.)
From: Hughey, John Sent: Thursday, June 03, 2010 10:42 AM To: Bower, Fred; Krohn, Paul; Powell, Raymond Cc: Ziedonis, Adam
Subject:
FW: Peach Bottom SOARCA Site Visit Importance:
High Ray. Paul and Fred: Below is the request from Research for a Peach Bottom visit. The SOARCA PM, Bob Prato attempted to fill out the online form, but it failed to route as it should have. I understand that we had a similar problem last week and our tech folks are looking into this. In the mean time, I asked Bob to provide the details which are presented below. Of special note is that the request date is for next week ahead of an ACRS meeting.Thanks, John In summary, here is the information you requested:
- Jason Schaperow, Charles Tinkler, and Robert Prato will be the participants for this site visit.* The site visit needs to take place next week in preparation for an ACRS meeting that is scheduled for 6/21/2010.
We are requesting 6/9 or 6/10/2010 between the hours of 10:00 am and 2:00 pm" The reason for our site visit is as follows: During our previous SOARCA meeting with the ACRS, the staff was asked if we walked down the mitigative measures to assess their viability with regards to feasibility, timing and accessibility under extreme accident conditions.
The staff is returning to ACRS and needs to report that we have walked down the mitigative measures in response to their request and then summarize our findings.In general, we will need a knowledgeable escort to walk down the RCIC black start, and the portable pump and power supply hook-ups from the place of storage of the portable equipment, pre-staged tools and transport capability, the typical routes that will be used, the connection points, and a discussion on the hook-up process.If you need any more information please let me know. Thanks so much for your assistance.
Robert Prato Senior Reactor Operation Engineer NRO / DCIP / CQVA T7D43 / 415-6035 3