ML13219A039

From kanterella
Revision as of 02:37, 14 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Email from J. Poehler to C. Basavaraju, Peer Review of SE Input for Vermont Yankee Core Plate Bolt Analysis
ML13219A039
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 02/22/2012
From: Poehler J C
Office of Nuclear Reactor Regulation
To: Chakrapani Basavaraju
NRC/NRR/DE/EMCB
References
FOIA/PA-2013-0139
Download: ML13219A039 (2)


Text

Poehler, Jeffrey //From: Poehler, Jeffrey ,*Sent: Wednesday, FebrL~ary 22, 2012 12:40 PM To: Basavaraju, Chakrapani Cc: Brown, Eva; Jessup, William; Cheruvenki, Ganesh; Purtscher, Patrick Subject; RE: Peer Review of SE Input for Vermont Yankee Core Plate Bolt Analysis (ME6248)_Question on BFN CP bolts analysis Thanks Pani, let me know if I can help with the integration.

I am not the reviewer for BFN, I think it may be Ganesh or Pat Purtscher in my branch.Jeffrey C. Poehler Sr. Materials Engineer NRR/DE/EVIB (301) 415-8353..... ..... ...... ..From: Basavaraju, Chakrapani

.. " Sent: Wednesday, February 22, 2012 12:04 PM To: Poehler, Jeffrey Cc: Brown, Eva; Jessup, William; Cheruvenki, Ganesh

Subject:

RE: Peer Review of SE Input for Vermont Yankee Core Plate Bolt Analysis (ME6248) -Question on BFN CP bolts analysis Thanks Jeff. I will integrate my structural portions of the input into the Vermont Yankee SE. Are you also involved in Browns Ferry 1-2-3 Core plate holddown bolts analysis?

Billy Jessup will be doing the structural portion for BFN 1-2-3.Thanks Pani From: Poehler, Jeffrey Sent: Wednesday, February 15, 2012 10:03 AM To: Basavaraju, Chakrapani Cc: Kim, James; Cheruvenki, Ganesh

Subject:

RE: Peer Review of SE Input for Vermont Yankee Core Plate Bolt Analysis (ME6248)Pani, I made some more changes to the input based on peer review -use the attached version rather than the previous version.Jeffrey C. Poehler Sr. Materials Engineer NRR/DE/EVIB (301) 415-8353 From: Poehler, Jeffrey Sent: Tuesday, February 14, 2012 1:25 PM To: Basavaraju, Chakrapani Cc: Kim, James; Cheruvenki, Ganesh

Subject:

FW: Peer Review of SE Input for Vermont Yankee Core Plate Bolt Analysis (ME6248)6 Pani, attached is my input to the SE for the areas that I reviewed -specifically, the determination of the amount of preload loss and the adequacy of the proposed inspection plan. Ganesh peer reviewed for me, see email below.I'm not sure how you structured your SE, so feel free to move things around and cut and paste my sections as needed. We probably should meet to discuss. I'll be in the office tomorrow and Thursday.Thanks, Jeff From: Cheruvenkl, Ganesh Sent: Tuesday, February 14, 2012 10:20 AM To: Poehler, Jeffrey

Subject:

RE: Peer Review of SE Input for Vermont Yankee Core Plate Bolt Analysis (ME6248)Jeff-Looks good-specially the statistical approach From: Poehler, Jeffrey Sent: Tuesday, February 14, 2012 9:25 AM To: Cheruvenki, Ganesh Cc: Purtscher, Patrick

Subject:

RE: Peer Review of SE Input for Vermont Yankee Core Plate Bolt Analysis (ME6248)Did you guys have time to comment?From: Cheruvenki, Ganesh Sent: Tuesday, February 07, 2012 12:07 PM To: Poehler, Jeffrey

Subject:

RE: Peer Review of SE Input for Vermont Yankee Core Plate Bolt Analysis (ME6248)Will do.From: Poehler, Jeffrey Sent: Tuesday, February 07, 2012 10:45 AM To: Cheruvenki, Ganesh Cc: Purtscher, Patrick

Subject:

Peer Review of SE Input for Vermont Yankee Core Plate Bolt Analysis (ME6248)Ganesh, As discussed yesterday, please peer review (technical only) my SE input for Vermont Yankee. Use TAC ME6248. Note that it is not a complete SE because Pani has the lead on the SE. He can integrate my inputs into the structure of his SE.If you.can give me comments by the end of the week that would be fine.Pat, I copied you so if you have time to review your comments would also be appreciated.

Thanks, Jeff 7