ENS 48072
ENS Event | |
---|---|
17:58 Jul 5, 2012 | |
Title | Unanalyzed Condition Due To Blocking Both Reactor Building Railroad Bay Doors |
Event Description | At 1258 CDT on 07/05/2012, Operations was notified that both panels of Door 45 (south doors for the reactor building railroad bay airlock) were blocked by a man lift. Blocking both doors represents an unanalyzed condition as a flow path through the door is assumed for pressure relief during postulated HELB events. The man lift was immediately removed correcting the situation and all work related to Door 45 was stopped. Door 45 was blocked for approximately 20 minutes.
The NRC Resident Inspector has been notified.
The purpose of this notification is to retract the previous Event Notification Report (#48072) made by the Monticello Nuclear Generating Plant on 7/5/2012. The initial report indicated that blocking both panels of the railroad bay doors by a man lift represented an unanalyzed condition, as a flow path through the door is assumed for pressure relief during postulated HELB events, and was reported in accordance with 10CFR50.72(b)(3)(ii)(B), Unanalyzed Condition. Since the initial report, Engineering has completed an evaluation that demonstrates equipment supporting safe shutdown would have been capable of performing their specified design function during postulated HELB events. Based on this analysis, the condition initially reported in EN#48072 did not result in an unanalyzed condition that significantly degraded plant safety and is therefore retracted. The NRC Resident Inspector has been informed of this retraction. Notified R3DO (Cameron). |
Where | |
---|---|
Monticello Minnesota (NRC Region 3) | |
Reporting | |
10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition | |
Time - Person (Reporting Time:+3.43 h0.143 days <br />0.0204 weeks <br />0.0047 months <br />) | |
Opened: | William Stang 21:24 Jul 5, 2012 |
NRC Officer: | Howie Crouch |
Last Updated: | Aug 31, 2012 |
48072 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 48072\u003C/a\u003E - \u003Ca href=\"/Monticello\" title=\"Monticello\"\u003EMonticello\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EUnanalyzed Condition Due to Blocking Both Reactor Building Railroad Bay Doors\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 48072 - Monticello\n","link":"","lat":45.333647222222226,"lon":-93.8490361111111,"icon":"/w/images/6/6c/Xcel_Energy_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |