ML15175A228

From kanterella
Revision as of 02:25, 9 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Shine Medical Technologies V. 0 - Chapter 01 - Figures 1.3-001 Through 1.3-006
ML15175A228
Person / Time
Site: SHINE Medical Technologies
Issue date: 06/16/2015
From: Bynum R V
Shine Medical Technologies
To:
Office of Nuclear Reactor Regulation
Lynch S
References
SHINE, SHINE.SUBMISSION.20, SHN.PSAR.P, SHN.PSAR.P.9
Download: ML15175A228 (7)


Text

Chapter 1 - The Facility General Description of the Facility SHINE Medical Technologies Rev. 0 Figure 1.3 Production Building Subfloor Plans Preliminary Arrangement

Security-Related Information - Withhold Under 10 CFR 2.390

Chapter 1 - The Facility General Description of the Facility SHINE Medical Technologies Rev. 0 Figure 1.3 Production Building Floor Plans Preliminary Arrangement

Security-Related Information - Withhold Under 10 CFR 2.390 Chapter 1 - The FacilityGeneral Description of the FacilitySHINE Medical TechnologiesRev. 1Figure 1.3 Production Building Sections Preliminary ArrangementSecurity-Related Information - Withhold Under 10CFR2.390 Chapter 1 - The Facility General Description of the Facility SHINE Medical Technologies Rev. 0 Figure 1.3 SHINE Facility Site Layout

Chapter 1 - The Facility General Description of the Facility SHINE Medical Technologies Rev. 0 Figure 1.3 RCA Boundaries

Security-Related Information - Withhold Under 10 CFR 2.390 Chapter 1 - The Facility General Description of the Facility SHINE Medical Technologies Rev. 1 Figure 1.3 Legend for Process Flow Diagrams Sheet 1 of 2 Chapter 1 - The Facility General Description of the Facility SHINE Medical Technologies Rev. 0 Figure 1.3 Legend for Process Flow Diagrams (Sheet 2 of 2)