|
---|
Category:Letter
MONTHYEARML24289A1232024-10-24024 October 2024 Letter to James Barstow Re Environmental Scoping Summary Report for Browns Ferry CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20243012024-10-17017 October 2024 Operator Licensing Examination Approval 05000390/2024301 and 05000391/2024301 ML24282B0412024-10-15015 October 2024 Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 CNL-24-077, Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 12024-10-0909 October 2024 Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 1 ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 ML24261C0062024-10-0404 October 2024 Correction to Amendment No. 134 to Facility Operating License No. NPF-90 and Amendment No. 38 to Facility Operating License No. NPF-96 ML24270A2162024-09-27027 September 2024 Notice of Intentions Regarding Preliminary Finding from NRC Inspection Report 05000260/2024090, EA-24-075 ML24284A1072024-09-26026 September 2024 Affidavit for Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 05000328/LER-2024-001, Reactor Trip Due to an Electrical Trouble Turbine Trip2024-09-25025 September 2024 Reactor Trip Due to an Electrical Trouble Turbine Trip CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems ML24262A1502024-09-24024 September 2024 Requalification Program Inspection - Browns Ferry Nuclear Plant CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24263A2952024-09-19019 September 2024 Site Emergency Plan Implementing Procedure Revision ML24267A0402024-09-19019 September 2024 Cycle 27 Core Operating Limits Report Revision 0 ML24185A1742024-09-18018 September 2024 Cover Letter - Issuance of Exemption Related to Non-Destructive Examination Compliance Regarding Sequoyah Nuclear Plant Independent Spent Fuel Storage Installation CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000260/20240902024-09-17017 September 2024 NRC Inspection Report 05000260/2024090 and Preliminary White Finding and Apparent Violation - 1 CNL-24-062, Cycle 16 Reload Analysis Report2024-09-16016 September 2024 Cycle 16 Reload Analysis Report ML24255A8862024-09-10010 September 2024 Core Operating Limits Report for Cycle 16 Operation, Revision 0 ML24253A0152024-09-0808 September 2024 Emergency Plan Implementing Procedure Revisions 05000390/LER-2024-002, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-09-0505 September 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation ML24239A3332024-09-0303 September 2024 Full Audit Plan IR 05000259/20244042024-09-0303 September 2024 Cyber Security Inspection Report 05000259/2024404 and 05000260-2024404 and 05000296/2024404-Cover Letter ML24247A2212024-08-29029 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-21-160, NEI 03-08 Needed Guidance: PWR Lower Radial Support Clevis Insert X-750 Bolt Inspection Requirements, September 1, 2021 ML24247A1802024-08-28028 August 2024 Application to Revise the Fuel Handling Accident Analysis, to Delete Technical Specification 3.9.4, Containment Penetrations, and to Modify Technical Specification 3.3.6, Containment Ventilation Isolation Instrumentation for Sequoyah Nuclea IR 05000390/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390-2024005 and 05000391-2024005 ML24218A1442024-08-27027 August 2024 Issuance of Amendment Nos. 169 and 75 Regarding Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate IR 05000327/20240052024-08-26026 August 2024 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2024005 and 05000328/2024005 IR 05000259/20240052024-08-26026 August 2024 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2024005, 05000260/2024005 and 05000296/2024005 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000390/20244022024-08-20020 August 2024 – Security Baseline Inspection Report 05000390-2024402 and 05000391/2024402 - Public CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), ML24225A1682024-08-16016 August 2024 – Notification of Inspection and Request ML24219A0262024-08-12012 August 2024 Request for Withholding Information from Public Disclosure IR 05000390/20240022024-08-0707 August 2024 Integrated Inspection Report 05000390/2024002 and 05000391/2024002 Rev IR 05000259/20244022024-08-0606 August 2024 Security Baseline Inspection Report 05000259/2024402 and 05000260/2024402 and 05000296/2024402 ML24219A0272024-08-0606 August 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000259/20240022024-08-0202 August 2024 Brown Ferry Nuclear Plant – Integrated Inspection Report05000259/2024002 and 05000260/2024002 and 05000296/2024002 IR 05000327/20240022024-07-31031 July 2024 Integrated Inspection Report 05000327/2024002 and 05000328/2024002 ML24211A0572024-07-29029 July 2024 Submittal of Emergency Plan Implementing Procedure Revision ML24211A0542024-07-29029 July 2024 Operator License Examination Report ML24211A0412024-07-26026 July 2024 Unit 1 Cycle 26 Refueling Outage - 90-Day Inservice Inspection Summary Report ML24204A2652024-07-25025 July 2024 Regulatory Audit Summary Related to Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24170A8002024-07-15015 July 2024 Issuance of Amendment Nos. 168 and 74 Regarding Revision to Technical Specification Table 1.1-1 for Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts IR 05000390/20244402024-07-12012 July 2024 95001 Supplemental Inspection Supplemental Report 05000390-2024440 and 05000391-2024440 and Follow-Up Assessment Letter ML24183A4142024-07-10010 July 2024 – License Renewal Regulatory Limited Scope Audit Regarding the Environmental Review of the License Renewal Application (EPID Number: L-2024-SLE-0000) (Docket Numbers: 50-259, 50-260, and 50-296) 2024-09-08
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 28, 2015 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3R-C Chattanooga, TN 37 402-2801
SUBJECT:
BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3, SEQUOYAH NUCLEAR PLANT, UNITS 1AND2, WATTS BAR NUCLEAR PLANT, UNITS 1 AND 2, AND BELLEFONTE NUCLEAR PLANT, UNITS 1 AND 2 -REASSIGNMENT OF U.S. NUCLEAR REGULATORY COMMISSION BRANCH CHIEF
Dear Mr. Shea:
This letter is to inform you that effective November 1, 2015, Mr. Benjamin G. Beasley will be assigned as the U.S. Nuclear Regulatory Commission's Chief for Plant Licensing Branch 11-2, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation.
Mr. Beasley will assume all licensing oversight and supervisory duties previously performed by Ms. Shana R. Helton regarding the following Tennessee Valley Authority plants: Browns Ferry Nuclear Plant, Units 1, 2, and 3, and Sequoyah Nuclear Plant, Units 1 and 2. Mr. Beasley will also assume the licensing oversight and supervisory duties previously performed by Mr. Jessie F. Quichocho regarding Watts Bar Nuclear Plant, Units 1 and 2, and Bellefonte Nuclear Plant, Units 1 and 2. Mr. Beasley may be reached at 301-415-2062 or Benjamin.Beasley@nrc.gov.
Docket Nos. 50-259, 50-260, 50-296, 50-327, 50-328, 50-390, 50-391, 50-38, and 50-439 cc: Distribution via Listserv Sincerely, James M. Trapp, Acting Deputy Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3R-C Chattanooga, TN 37 402-2801 October 28, 2015
SUBJECT:
BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3, SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2, WATTS BAR NUCLEAR PLANT, UNITS 1 AND 2, AND BELLEFONTE NUCLEAR PLANT, UNITS 1 AND 2 -REASSIGNMENT OF U.S. NUCLEAR REGULATORY COMMISSION BRANCH CHIEF
Dear Mr. Shea:
This letter is to inform you that effective November 1, 2015, Mr. Benjamin G. Beasley will be assigned as the U.S. Nuclear Regulatory Commission's Chief for Plant Licensing Branch 11-2, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation.
Mr. Beasley will assume all licensing oversight and supervisory duties previously performed by Ms. Shana R. Helton regarding the following Tennessee Valley Authority plants: Browns Ferry Nuclear Plant, Units 1, 2, and 3, and Sequoyah Nuclear Plant, Units 1 and 2. Mr. Beasley will also assume the licensing oversight and supervisory duties previously performed by Mr. Jessie F. Quichocho regarding Watts Bar Nuclear Plant, Units 1 and 2, and Bellefonte Nuclear Plant, Units 1 and 2. Mr. Beasley may be reached at 301-415-2062 or Benjamin.Beasley@nrc.gov.
Sincerely, /RA/ James M. Trapp, Acting Deputy Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-259, 50-260, 50-296, 50-327, 50-328, 50-390, 50-391, 50-38, and 50-439 cc: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL2-2 R/F RidsACRS_MailCTR Resource RidsNrrDorl Resource TOrf, NRR RidsNrrDorllpl2-2 Resource RidsNrrLABClayton Resource RidsNrrOd Resource RidsNrrPMBrownsFerry Resource RidsNrrPMSequoyah Resource RidsRgn2Mai1Center Resource LCox, NRR BBeasley, NRR ADAMS Accession No.: ML 15288A497 OFFICE NRR/DORULPL2-2/PM NRR/DORULPL2-2/PM NRR/DORULPL2-2/PM NAME FSaba (AHon for) A Hon RSchaaf DATE 10/15115 10/15/15 10/ /15 OFFICE NRR/DORULPL2-2/LA NRR/DORULPL2-2/BC NRR/DORUDD(A)
NAME BClayton BBeasley JTrapp DATE 10/28/15 10/28/15 10/28/15 OFFICIAL RECORD COPY UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 28, 2015 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3R-C Chattanooga, TN 37 402-2801
SUBJECT:
BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3, SEQUOYAH NUCLEAR PLANT, UNITS 1AND2, WATTS BAR NUCLEAR PLANT, UNITS 1 AND 2, AND BELLEFONTE NUCLEAR PLANT, UNITS 1 AND 2 -REASSIGNMENT OF U.S. NUCLEAR REGULATORY COMMISSION BRANCH CHIEF
Dear Mr. Shea:
This letter is to inform you that effective November 1, 2015, Mr. Benjamin G. Beasley will be assigned as the U.S. Nuclear Regulatory Commission's Chief for Plant Licensing Branch 11-2, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation.
Mr. Beasley will assume all licensing oversight and supervisory duties previously performed by Ms. Shana R. Helton regarding the following Tennessee Valley Authority plants: Browns Ferry Nuclear Plant, Units 1, 2, and 3, and Sequoyah Nuclear Plant, Units 1 and 2. Mr. Beasley will also assume the licensing oversight and supervisory duties previously performed by Mr. Jessie F. Quichocho regarding Watts Bar Nuclear Plant, Units 1 and 2, and Bellefonte Nuclear Plant, Units 1 and 2. Mr. Beasley may be reached at 301-415-2062 or Benjamin.Beasley@nrc.gov.
Docket Nos. 50-259, 50-260, 50-296, 50-327, 50-328, 50-390, 50-391, 50-38, and 50-439 cc: Distribution via Listserv Sincerely, James M. Trapp, Acting Deputy Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3R-C Chattanooga, TN 37 402-2801 October 28, 2015
SUBJECT:
BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3, SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2, WATTS BAR NUCLEAR PLANT, UNITS 1 AND 2, AND BELLEFONTE NUCLEAR PLANT, UNITS 1 AND 2 -REASSIGNMENT OF U.S. NUCLEAR REGULATORY COMMISSION BRANCH CHIEF
Dear Mr. Shea:
This letter is to inform you that effective November 1, 2015, Mr. Benjamin G. Beasley will be assigned as the U.S. Nuclear Regulatory Commission's Chief for Plant Licensing Branch 11-2, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation.
Mr. Beasley will assume all licensing oversight and supervisory duties previously performed by Ms. Shana R. Helton regarding the following Tennessee Valley Authority plants: Browns Ferry Nuclear Plant, Units 1, 2, and 3, and Sequoyah Nuclear Plant, Units 1 and 2. Mr. Beasley will also assume the licensing oversight and supervisory duties previously performed by Mr. Jessie F. Quichocho regarding Watts Bar Nuclear Plant, Units 1 and 2, and Bellefonte Nuclear Plant, Units 1 and 2. Mr. Beasley may be reached at 301-415-2062 or Benjamin.Beasley@nrc.gov.
Sincerely, /RA/ James M. Trapp, Acting Deputy Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-259, 50-260, 50-296, 50-327, 50-328, 50-390, 50-391, 50-38, and 50-439 cc: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL2-2 R/F RidsACRS_MailCTR Resource RidsNrrDorl Resource TOrf, NRR RidsNrrDorllpl2-2 Resource RidsNrrLABClayton Resource RidsNrrOd Resource RidsNrrPMBrownsFerry Resource RidsNrrPMSequoyah Resource RidsRgn2Mai1Center Resource LCox, NRR BBeasley, NRR ADAMS Accession No.: ML 15288A497 OFFICE NRR/DORULPL2-2/PM NRR/DORULPL2-2/PM NRR/DORULPL2-2/PM NAME FSaba (AHon for) A Hon RSchaaf DATE 10/15115 10/15/15 10/ /15 OFFICE NRR/DORULPL2-2/LA NRR/DORULPL2-2/BC NRR/DORUDD(A)
NAME BClayton BBeasley JTrapp DATE 10/28/15 10/28/15 10/28/15 OFFICIAL RECORD COPY