ML17228A879

From kanterella
Revision as of 16:04, 7 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Forwards Rev 0 to PSL-200-AOA-94-1, St Lucie Nuclear Plant, Unit 2 First ISI Interval Request for Authorization of Alternative Exam, Per 10CFR50.55a(g)(6)(ii)(A)(5)
ML17228A879
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 10/12/1994
From: SAGER D A
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17228A880 List:
References
RTR-REGGD-01.150, RTR-REGGD-1.150 L-94-254, NUDOCS 9410200227
Download: ML17228A879 (4)


Text

PR.IC3R.I EY'ACCELERATED RIDS PROCESSIi Fl.p/x REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9410200227 DOC.DATE: 94/10/12 NOTARIZED-NO FACIL:50-389 St.Lucie Plant, Unit 2, Florida Power&Light Co.AUTH.NAME AUTHOR AFFILIATION SAGER,D.A.

Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)DOCKET 05000389

SUBJECT:

Forwards Rev 0 to PSL-200-AOA-94-1,"St Lucie Nuclear Plant, Unit 2 First ISI Interval Request for Authorization of Alternative Exam," per 10CFR50.55a(g)(6)(ii)(A)(5).

DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR j ENCL 2 SIZE: TITLE: OR Submittal:

Inservice/Testing/Relief from ASME Code-GL-89-04 NOTES: RECIPIENT ID CODE/NAME PD2-2 LA NORRIS,J INTERNAL: CR E CENT R 1 NRR/DE EB OGC/HDS3 EXTERNAL: EG&G BROWN,B NOAC COPIES LTTR ENCL 1 0 2 2 6 6 1 1 1 1 1 0 1 1 1 1 RECIPIENT ID CODE/NAME PD2-2 PD AEOD/SPD/RAB NRR/DE/EMCB NUDOCS-ABSTRACT RES/DSIR/EIB EG&G RANSOME,C NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 YOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVKSTE!CONTACTTI IE DOCL'WfENT CONTROL DESK, ROOhf Pl-37 (EXT.504-7083)TO ELDfIVATL YOUR NAif L PROif DISTRIBU'I'ION LIS'I'S I'OR DOCI.'MLN'I'S YOL" DON" I'I.'ED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 19 P r i[i P.O.Box14000, Juno Beach, FL 33408-0420 tI=IPll October 12, 1994 L-94-254 10 CFR 50.4 10 CFR 50.55a U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 RE: St.Lucie Unit 2 Docket No.50-389 In-Service-Inspection Plan Initial Ten-Year Interval Request for Authorization of Alternative Examination of Reactor Vessel Welds Pursuant to 10 CFR 50.55a(g)(6)(ii)(A)(5), Florida Power and Light Company (FPL)'equests approval of alternative examination requirements for the augmented reactor vessel weld inspection required by 10CFR55a(g)(6)(ii)(A).

FPL has determined pursuant to 10 CFR 50.55a(g)(6)(ii)(A)(5) that the proposed alternatives would provide an acceptable level of quality and safety.The request for authorization of alternative examination requirements including the justification is attached.Please contact us if there are any questions about this submittal.

Very truly yours, D.A.ger Vice r sident St.Lu ie Plant DAS/GRM cc: Stewart D.-Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant>pU 0 r'cg 9410200227 941012 an FPL Group coinpany.PDR ADQCK 05000389 Q PDR 0<(ii[

0 A