ML13220A260

From kanterella
Revision as of 14:29, 4 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Email from R. Guzman to W. Jessup, VY Steam Dryer Inspection Reports
ML13220A260
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 04/11/2012
From: Guzman R V
Office of Nuclear Reactor Regulation
To: Jessup W T
Division of Engineering
References
FOIA/PA-2013-0139
Download: ML13220A260 (5)


Text

Basavaraju, Chakrapani From: Guzman, RichardSent: Wednesday, Apil 1 ,2012 447 PMTo: Jessup, WilliamCc: Basavaraju, Chakrapani

Subject:

RE: VY Steam Dryer Inspection ReportsThanks Billy. That was my understanding.

I appreciate the confirmation.

RichFrom: Jessup, WilliamSent: Wednesday, April 11, 2012 4:23 PMTo: Guzman, RichardCc: Basavaraju, Chakrapani

Subject:

RE: VY Steam Dryer Inspection ReportsRich,I don't think it will be necessary for me to attend (I copied Pani -he may or may not wantto attend).

EMCB's role in the review is pretty much limited to supporting EVIB with anystructural evaluation questions they may have.Thanks.BillyFrom: Guzman, RichardSent: Wednesday, April 11, 2012 1:19 PMTo: Cheruvenki, Ganesh; Scarbrough, Thomas; Sheng, SimonCc: Kim, James; Basavaraju, Chakrapani; Jessup, William

Subject:

RE: VY Steam Dryer Inspection ReportsGreat. I spoke to Simon and he can support 5/1, as well. Therefore, we'll move forwardwith that date with an 8am start time. Our GEH contact will reserve the space for the entireday, so if needed, you can come back after lunch and complete any outstanding items.Moreover, you may also want to discuss any questions or clarifications with the GErepresentative(s),

some of which may be on the west coast -so an afternoon conference or VTCmay actually work out better.I'll provide more information once I firm out the details with the GE contact (Patricia

Campbell, GEH), who will be there w/you at the local office.Thanks,Rich GuzmanSr. Project ManagerNRR/DORLUS NRC301-415-1030 Richard.Guzman@nrc.gov 1 61P I From: Cheruvenki, Ganesh \' .Sent: Wednesday, April 11, 2012 12:38 PMTo: Scarbrough, Thomas; Guzman, Richard; Sheng, SimonCc: Kim, James; Basavaraju, Chakrapani; Jessup, William

Subject:

RE: VY Steam Dryer Inspection ReportsAll-5/1-looks good to me.From: Scarbrough, ThomasSent: Wednesday, April 11, 2012 12:12 PMTo: Guzman, Richard; Cheruvenki, Ganesh; Sheng, SimonCc: Kim, James; Basavaraju, Chakrapani; Jessup, William

Subject:

RE: VY Steam Dryer Inspection ReportsHow about 8 a.m. to noon on 5/1?I think 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> would be sufficient.

Thanks.TomFrom: Guzman, RichardSent: Wednesday, April 11, 2012 12:06 PMTo: Scarbrough, Thomas; Cheruvenki, Ganesh; Sheng, SimonCc: Kim, James; Basavaraju, Chakrapani; Jessup, William

Subject:

RE: VY Steam Dryer Inspection ReportsThe GE / VY folks can support the following week -preferably 4/30, 5/1, and/or afternoon of5/2. Are you all available that week? The plan is to have the documents ready for yourreview in the NEI office space / conference room (across the street, next to the Chile's),

and have the GE folks in Wilmington available to answer any questions

-either via phone orweb. How much time do you expect you will need to review the requested 20+ documents?

Does anyone else besides Tom, Ganesh, and Simon plan to participate?

Thanks,RichX1030From: Scarbrough, ThomasSent: Friday, April 06, 2012 9:42 AMTo: Kim, James; Cheruvenki, Ganesh; Basavaraju, Chakrapani; Jessup, William; Sheng, SimonCc: Guzman, Richard

Subject:

RE: VY Steam Dryer Inspection ReportsI can attend for about an hour early in the morning on April 11, 12, or 13 in Rockville.

If I am not available, please continue with the plan without me.My next availability would be the week of April 23.Thanks.TomFrom: Kim, James \ "Sent: Thursday, April 05, 2012 3:39 PMTo: Cheruvenki, Ganesh; Basavaraju, Chakrapani; Jessup, William; Scarbrough, Thomas; Sheng,SimonCc: Guzman, Richard2

-

Subject:

RE: VY Steam Dryer Inspection ReportsGentlemen, I would like to propose either April 11th (Wed) or 12th (Thursday).

Please let me know ASAP.ThanksJim Kimp.s. As of April 9, 2012, Rich Guzman will be a new Vermont Yankee Project Manager and anyfuture communications regarding Vermont Yankee should be directed to Rich Guzman. He islocated at O-8H5 and his phone number is 301-415-1030.

From: Kim, JamesSent: Wednesday, April 04, 2012 11:21 AMTo: Kim, James; Cheruvenki, GaneshCc: Basavaraju, Chakrapani; Jessup, William; Scarbrough, Thomas; Sheng, Simon

Subject:

RE: VY Steam Dryer Inspection ReportsGentlemen, GE is planning to bring down the reports to a local office in Rockville for you to review thereports.

Please provide me with a couple of dates for next week that are good for you toreview the reports.ThanksJim KimFrom: Kim, JamesSent: Tuesday, February 28, 2012 9:05 AMTo: Cheruvenki, GaneshCc: Basavaraju, Chakrapani; Jessup, William; Scarbrough, Thomas; Sheng, Simon

Subject:

VY Steam Dryer Inspection ReportsGentlemen, VY is working with GE representative, Patricia

Campbell, concerning the logistics ofgathering and bring down the inspection reports and INRs. Please let me know what dates aregood for you to review the reports.

The earliest date they can bring the reports is the weekof March 26th.ThanksJim KimFrom: Kim, JamesSent: Monday, February 27, 2012 8:45 AMTo: Cheruvenki, GaneshCc: Basavaraju, Chakrapani; Jessup, William; Scarbrough, Thomas; Sheng, Simon

Subject:

RE: Inspections--Steam dryer--Today's meeting at 1.00 pm at 09B6.Gentlemen, VY has provided the final counts for GE reports and INRs regarding the steam dryerinspections.

3 There are 3 RF024 evaluations, 1 RF025 evaluation, 2 RF026 evaluations, 1 RF027 evaluation and I RF028 evaluation to make 8 in all.There are 4 INR's from GE for RF024, 7 INF's from AREVA for RF025, 17 INR's from GE forRF026, 24 INR's from AREVA for RF027, 23 INR's from AREVA for RF028 and 1 INR from GE forRF029. These INR's and INF's from GE and AREVA are just for the steam dryer and note thatthere are sometimes more than one indication per INR or INF.ThanksJim KimFrom: Cheruvenki, GaneshSent: Thursday, February 23, 2012 2:23 PMTo: Kim, JamesCc: Basavaraju, Chakrapani; Jessup, William; Scarbrough, Thomas; Sheng, Simon

Subject:

RE: Inspections--Steam dryer--Today's meeting at 1.00 pm at 09B6.Jim,Please inform the licensee that disposition of the detected flaws is critical for our review.If Simon is not satisfied, we may have to reject the request.From: Sheng, SimonSent: Thursday, February 23, 2012 2:09 PMTo: Cheruvenki, GaneshCc: Kim, James; Basavaraju, Chakrapani; Jessup, William; Scarbrough, Thomas

Subject:

RE: Inspections--Steam dryer--Today's meeting at 1.80 pm at 09B6.Ganesh,I am more interested in reports documenting disposition of the detected flaws. Do these 20or so inspection reports also contain information regarding disposition of the detectedflaws? Or GE has separate reports to document the disposition?

SimonFrom: Cheruvenki, GaneshSent: Thursday, February 23, 2012 1:48 PMTo: Kim, James; Basavaraju, Chakrapani; Scarbrough, Thomas; Jessup, William; Sheng, Simon

Subject:

RE: Inspections--Steam dryer--Today's meeting at 1.00 pm at 09B6.It is OK with me. At least Pani/Tom and Simon should be present.From: Kim, JamesSent: Thursday, February 23, 2012 10:32 AMTo: Cheruvenki, Ganesh; Basavaraju, Chakrapani; Scarbrough, Thomas; Jessup, William; Sheng,Simon

Subject:

RE: Inspections--Steam dryer--Today's meeting at 1.00 pm at 09B6.Gentlemen, VY has proposed that both GE and VY representatives are willing to bring the inspections reports (approx.

20 GE proprietary inspection reports) to NRC for tech staff to review thesteam dryer inspection reports and answer any questions NRC tech staff may have. Please letme know if this approach is acceptable.

ThanksJim KimFrom: Cheruvenki, Ganesh4 Sent: Tuesday, February 21, 2012 8:59 AMTo: Basavaraju, Chakrapani; Scarbrough, Thomas; Jessup, William; Sheng, SimonCc: Kim, James

Subject:

Inspections--Steam dryer--Today's meeting at 1.00 pm at 09B6.Importance:

HighPani, Tom, Simon and BillyHere is my draft report on the inspection results (RF-26, 27 and 28) of the steam dryer andit contains status of new indications.

I still think we need to see the GE evaluation reportwhich can provide information on the licensee's justification for using less frequentinspections.

S