ML14055A411

From kanterella
Revision as of 15:14, 2 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
FOIA/PA-2012-0325 - Resp 2 - Partial
ML14055A411
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 02/04/2014
From: Graff M H
Office of Information Services
To: Riccio J
Greenpeace
Shared Package
ML14055A421 List: ... further results
References
FOIA/PA-2012-0325
Download: ML14055A411 (11)


Text

NRC FORM 464 Part I U.S. NUCLEAR REGULATORY COMMISSION FOIAPA RESPONSE NUMBER(10-2012)

I 2RESPONSE TO FREEDOM OFINFORMATION ACT (FOIA) I PRIVACYATP RQ SRESPONSE

[: FINAL Z PARTIALSACT (PA) REQUEST TYPEREQUESTER DATEJames Riccio FEB 0 4 2014PART I. -- INFORMATION RELEASEDD No additional agency records subject to the request have been located.Requested records are available through another public distribution program.

See Comments section.APPENDICES Agency records subject to the request that are identified in the listed appendices are already available forC public inspection and copying at the NRC Public Document Room.z APPENDICES Agency records subject to the request that are identified in the listed appendices are being made available forpublic inspection and copying at the NRC Public Document Room.D Enclosed is information on how you may obtain access to and the charges for copying records located at the NRC PublicDocument Room, 11555 Rockville Pike, Rockville, MD 20852-2738.

71APP ENDIED ICE Agency records subject to the request are enclosed.

E Records subject to the request that contain information originated by or of interest to another Federal agency have beenreferred to that agency (see comments section) for a disclosure determination and direct response to you.z We are continuing to process your request.W See Comments.

PART L.A -- FEESAMOUNT El You will be billed by NRC for the amount listed. E None. Minimum fee threshold not met.See comments F You will receive a refund for the amount listed.for details i i w vPART I.B -- INFORMATION NOT LOCATED OR WITHHELD FROM DISCLOSURE El No agency records subject to the request have been located.

For your information, Congress excluded three discretecategories of law enforcement and national security records from the requirements of the FOIA. See 5 U.S.C. § 552(c)(2006 & Supp. IV (2010). This response is limited to those records that are subject to the requirements of the FOIA. Thisis a standard notification that is given to all our requesters and should not be taken as an indication that excluded recordsdo, or do not, exist./ Certain information in the requested records is being withheld from disclosure pursuant to the exemptions described inand for the reasons stated in Part I1.E This determination may be appealed within 30 days by writing to the FOIA/PA Officer, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.

Clearly state on the envelope and in the letter that it is a "FOIA/PA Appeal."PART IC COMMENTS

( Use attached Comments continuation page if required)

The incoming FOIA request is available in ADAMS at ML12263A087.

One record labeled as 'E/13' in this package contained red-highlighted text in the original and thus that dark marking is included inthe copy provided to you.U NRC FORM 464 Part II U.S. NUCLEAR REGULATORY COMMISSION FOIA/PA DATE(4-20 11)RESPONSE TO FREEDOM OF INFORMATION 2012-0325 F 0 4 ZONACT (FOIA) I PRIVACY ACT (PA) REQUESTPART lI.A -- APPLICABLE EXEMPTIONS PPENDICES Records subject to the request that are described in the enclosed Appendices are being withheld in their entirety or in part under theE Exemption No.(s) of the PA and/or the FOIA as indicated below (5 U.S.C. 552a and/or 5 U.S.C. 552(b)).D Exemption 1: The withheld information is properly classified pursuant to Executive Order 12958.D Exemption 2: The withheld information relates solely to the internal personnel rules and practices of NRC.D Exemption 3: The withheld information is specifically exempted from public disclosure by statute indicated.

D Sections 141-145 of the Atomic Energy Act, which prohibits the disclosure of Restricted Data or Formerly Restricted Data (42 U.S.C.2161-2165).

D Section 147 of the Atomic Energy Act, which prohibits the disclosure of Unclassified Safeguards Information (42 U.S.C. 2167).D 41 U.S.C., Section 253b, subsection (m)(1), prohibits the disclosure of contractor proposals in the possession and control of an executive agency to any person under section 552 of Title 5, U.S.C. (the FOIA), except when incorporated into the contract between the agency andthe submitter of the proposal.Exemption 4: The withheld information is a trade secret or commercial or financial information that is being withheld for the reason(s) indicated.

W- The information is considered to be confidential business (proprietary) information.

7] The information is considered to be proprietary because it concerns a licensee's or applicant's physical protection or material control andEl. accounting program for special nuclear material pursuant to 10 CFR 2.390(d)(1).

F'1 The information was submitted by a foreign source and received in confidence pursuant to 10 CFR 2.390(d)(2).

D Disclosure will.harm an identifiable private or governmental interest.Exemption 5: The withheld information consists of interagency or intraagency records that are not available through discovery during litigation.

Applicable privileges:

z Deliberative process:

Disclosure of predecisional information would tend to inhibit theopen and frank exchange of ideas essential to thedeliberative process..

Where records are withheld in their entirety, the facts are inextricably intertwined with the predecisional information.

There also are no reasonably segregable factual portions because the release of the facts would permit an indirect inquiry into thepredecisional process of the agency.D Attorney work-product privilege.

(Documents prepared by an attorney in contemplation of litigation)

D Attorney-client privilege.

(Confidential communications between an attorney and his/her client)F71 Exemption 6: The withheld information is exempted from public disclosure because its disclosure would result in a clearly unwarranted LJ( invasion of personal privacy.[ Exemption 7: The withheld information consists of records compiled for law enforcement purposes and is being withheld for the reason(s) indicated.

FD- (A) Disclosure could reasonably be expected to interfere with an enforcement proceeding (e.g., it would reveal the scope, direction, andfocus of enforcement

efforts, and thus could possibly allow recipients to take action to shield potential wrong doing or a violation of NRCrequirements from investigators).

E (C) Disclosure could constitute an unwarranted invasion of personal privacy.(D) The information consists of names of individuals and other information the disclosure of which could reasonably be expected to revealidentities of confidential sources.(E) Disclosure would reveal techniques and procedures for law enforcement investigations or prosecutions, or guidelines that couldreasonably be expected to risk circumvention of the law.(F) Disclosure could reasonably be expected to endanger the life or physical safety of an individual.

z OTHER (Specify)

Outside of ScopePART II.B -- DENYING OFFICIALS Pursuant to 10 CFR 9.25(g) 9.25(h),

and/or 9.65(b) of the U.S. Nuclear Regulatory Commission regulations, it has been determined that the information withheld is exempt from production or disclosure, and that its production or disclosure is contrary to the publicinterest.

The person responsible for the denial are those officials identified below as denying officials and the FOIA/PA Officer for anydenials that may be appealed to the Executive Director for Operations (EDO).DENYING OFFICIAL TITLE/OFFICE RECORDS DENIED EDO SECY IGEric J. Leeds Office Director, Nuclear Reactor Regulation See Appendix E E El DVictor McCree Regional Administrator, Region II See Appendix E 21 El EDAppeal must be made in writing within 30 days of receipt of this response.

Appeals should be mailed to the FOIA/Privacy Act Officer,U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, for action by the appropriate appellate official(s).

You shouldclearly state on the envelope and letter that it is a "FOIA/PA Appeal."NRC FORM 464 Part II (4-2011)

FOIA/PA-20112-0325 APPENDIX CRECORDS ALREADY PUBLICLY AVAILABLE NO. DATE DESCRIPTION (page count)1 02/22/07 Memo To: William D. Travers, RA from: Brian R. Bonser, RudolphH. Bernhard, Jeff A. Circle, Mark S. Haire and Mark S. Lesser,

Subject:

Manual Chapter 0609.02 Appeal PanelRecommendations (Oconee Reply to a Notice of Violation andWhite Finding (EA-06-199))

(14 pages) ML070590329 2 03/01/07 Manual Chapter 0609.02 Appeal Panel Review of OconeeStandby Shutdown Facility

-White Finding (EA-06-199)

(12 pages) ML070610460 3 11/20/07 Reconsideration of Final Significance Determination Associated with Standby Shutdown Facility Flood Barrier White Finding (5pages) ML073241045 4 03/13/09 Summary of Closed December 4, 2008, Meeting to Discuss theDuke Energy Carolina, LLCs, September 26, 2008, Response tothe NRC's August 15, 2008, 50.54(f)

Letter on External Floodingat Oconee Nuclear Station (7 pages) ML090680737 5 07/09/09 Letter from D. Baxter, Duke to NRC on Final 60-Day Response toReference 2 (6 pages) Exemption 7F ML092020480 6 07/09/09 Summary of Closed June 11, 2009, Meeting to Discuss ExternalFlooding at Oconee (5 pages) ML091620669 7 08/12/09 Memo from M. Cunningham, NRR, P. Hiland, NRR and J. Guitter,NRR to B. Boger, NRR, M. Evans, NRR and V. McCree, RII onTechnical Basis for Allowing Oconee Nuclear Station to Remain inOperation Through November 2010 (9 pages) ML090570117 8 11/10/09 Summary of Closed Meeting May 11, 2009, with Duke EnergyCarolina, LLC, to discuss Preliminary Results Concerning Failureof the Jocassee Dam and Resultant Flooding at the OconeeNuclear Station, Units 1, 2, and 3 (5 pages) ML092940769 9 01/06/10 Briefing to the Executive Team on the Oconee Nuclear StationExternal Flooding Issue (6 pages) ML100280954 10 06/01/10 Communication Plan for Issuance of Confirmatory Action Letter toDuke for Oconee Units 1,2 and 3 -Regarding the impact ofexternal flooding June 2010 (6pgs) ML101750619 11 07/26/10 Summary of Closed June 29, 2010, Meeting to Discuss ExternalFlooding at Oconee (5 pages) ML101890803 12 10/26/10 Memo from G. Wilson, NRR to D. Persinko, NRR on NRC StaffAssessment of Duke Energy Carolinas, LLC., Oconee ExternalFlooding Issue (18 pages) ML102990064 13 03/05/11 Memo from P. Hiland, NRR and J. Giitter, NRR to J. Grobe, NRR,B. Boger, NRR and L. Wert, RII on Technical Basis for theTimeline to Resolve External Flooding Issues at Oconee.(6 pages) ML103410042 14 09/20/12 Communication Plan for Oconee Nuclear Station (ONS)Regarding External Flood Protection (13pgs) ML12268A404 FOIA/PA-20112-0325 APPENDIX DRECORDS BEING RELEASED IN THEIR ENTIRETYNO. DATE DESCRIPTION (page count)1. Undated Draft Memorandum from M. Cunningham, NRR to E. Leeds, NRRon Oconee Flood Protection and the Jocassee Dam HazardBasis for Continued Operation (7 pages)2. Undated Meeting Slides on Standby Shutdown Facility Flood BarrierBreach Violation Informal Reassessment (9 pages)3. Undated Meeting Slides on Oconee Flood Protection and the 10 CFR50.54(f)

Response (29 pages)4. Undated NRC Staff Comments to Duke Energy Request for Information Response (8 pages)5. Undated NRR Briefing on Oconee Flood Protection (NRR/DRA)

(1 page)6. Undated Oconee Nuclear Site Adequate Protection Backfit Documented Evaluation (4 pages)7. Undated Questions and Answers Related to Oconee Flood Barrier(1 page)8. Undated Slides on Oconee Nuclear Station -Standby Shutdown Facility(SSF) Flood Barrier Breach Violation SDP Assessment (8 pages)9. Undated Use of FERC Inundation Calculation Parameters (2 pages)10. Undated Oconee Nuclear Site Adequate Protection BackfitDocumented Evaluation (8 pages)11, Undated Draft Memo from M. Cunningham, NRR et al to E. Leeds,NRR on Oconee Flood Protection and the Jocassee DamHazard Basis for NRC allowing Continued Operation (8 pages)

12. Undated Draft Memo from M. Cunningham, NRR et al to E. Leeds,NRR on Oconee Flood Protection and the Jocassee DamHazard Basis for NRC allowing Continued Operation.

(8pages)13. Undated Draft Memo from M. Cunningham, NRR et al to E. Leeds,NRR on Oconee Flood Protection and the Jocassee DamHazard Basis for NRC allowing Continued Operation (8pages)14. Undated TIA -(6 pages)15. Undated SSF Flooding URI number 1 (12 pages)16. Undated The safe shutdown facility (2 pages)17. 12/00/06 TIA- Regarding the licensing basis for external flooding(GDC-2) for the Oconee Nuclear Station Standby ShutdownFacility (SSF) (44 pages)18. 02/00/08 Regional Administrator Briefing Sheet (7 pages)19. 07/03/08 Email from M. Franovich, NRR to M. Wong, NRR on QUERY:Draft POP for July 18th briefing of Grobe and Boger (3 pages)20. 08/12/08 Briefing Slides for Commission Assistants Brief on Oconee FloodProtection and the Jocassee Dam Hazard (11 pages)21. 08/15/08 Status of OCO Flood Issue (2 pages)22. 09/19/08 DHS Briefing Slides on Oconee Flood Protection and theJocassee Dam Hazard (12 pages)23. 10/21/08 NRR LT Meeting on Oconee Flood Protection and the 10 CFR50.54(f)

Response (11 pages)24. 10/21/08 NRR LT Meeting on Oconee Flood Protection and the JocasseeDam Hazard (17 pages)25. 10/23/08 NRR ET Meeting on Oconee Flood Protection and the 10 CFR50.54(f)

Response (11 pages)26. 11/26/08 DHS Briefing on Oconee Flood Protection and the Jocassee DamHazard (16 pages)

27. 05/05/09 Presentation to the Lessons Learned Oversight Board on OconeeNuclear Station External Flood Protection Issue (8 pages)28. 05/05/09 Presentation to the Lessons Learned Oversight Board on OconeeNuclear Station External Flood Protection Concern (11 pages)29. 12/03/09 Email from J. Mitman, NRR to M. Khanna, NRR onAdequate Protection Backfit Documented Evaluation (7pages)30. 12/14/09 Email from M.Khanna, NRR to J. Mitman, NRR on OconeeAdequate Protection Backfit Documentation Evaluation

-Draft (8 pages)31. 01/06/10 Email from M. Galloway, NRR to J. Mitman, NRR and L.James, NRR RE: Revised Adequate Protection BackfitDocumented Evaluation (11 pages)32. 02/18/10 Email from M. Khanna, NRR to J. Mitman, NRR FW:Oconee Adequate Protection Backfit Documented Evaluation

-Draft (8 pages)33. 03/22/10 Email from F. Ferrante, NRR to J. Mitman, NRR RE: Emailing:

1994 damRepairAnchoringFroutingpdf (1 page)34. 04/22/10 Email from A. Zoulis, NRR to J. Mitman, NRR RE:Comments on the NRR Draft Memo: Supplement to TechBasis for Allowing ONS to Remain in Operation (3 pages)35. 05/25/10 Email from J. Mitman, NRR to F. Ferrante, NRR FW:OUO/Security Related Information

-Briefing toCommissioner Apostolakis on Oconee External FloodingEvent (9 pages)36. 05/25/10 Slides from Commission Briefing on Oconee External FloodingIssue (4 pages)37. 06/00/11 Inspection Plan -Oconee (8 pages)38. 10/17/11 Email from S. Weerakkody, NRR to F. Ferrante, NRR RE: OUOSRI -RE: IN Dam .Failure Frequency (2 pages)

39. 09/20/12 History of Oconee Flood Concerns (6 pages)40. 12/02/08 Email from R. Schaaf, NRR to J. Circle, NRR RE: Meeting withFERC Concerning Oconee (2 pages)

FOIA/PA-2012-0325 APPENDIX ERECORDS BEING WITHHELD IN PARTNO. DATE DESCRIPTION (page count)1. Undated Questions and Answers Related to the Oconee External FloodingIssue (3 pages) Exemption 7F2. Undated Jocassee Overtopping Notes (2 pages) Exemption 7F3. Undated Slides on Oconee SSF Flood Barrier Breach SDP -LessonsLearned (20 pages) Exemption 7F4. Undated Slides on Oconee SSF Flood Barrier Breach SDP LessonsLearned (21 pages) Exemption 7F5. 09/06/07 Email from W. Rogers, NRR to J. Circle, NRR Re: Surry Visit. (1page) Outside of Scope6. 10/01/07 Slides on Final Regulatory Assessment of Oconee Flood BarrierIssue (12 pages) Exemption 7F7. 12/05/07 Slides on Insights from Regulatory Assessments of Oconee FloodBarrier Issue (11 pages) Exemption 7F8. 09/04/08 Email from M. Franovich, NRR to M. Wong, NRR et al RE:Keowee and Jocassee Operation Report Request -FERCInspections Reports on Jocassee and Keowee Dams (2 pages)Exemption

69. 02/03/09 Briefing Book for Commissioner Peter B. Lyons -Oconee NuclearStation (31pgs) Exemptions 4 and 610. 04/20/09 Meeting Agenda for Oconee External Flooding Team Meeting(3 pages) Exemption 6.11. 06/23/09 Briefing Book for Chairman Gregory B. Jaczko -Oconee NuclearStation (31 pgs) Exemptions 4 and 612. 01/08/10 Email from G. Wilson, NRR to J. Mitman, NRR Re:Questions on OFI (1 page) Exemption 6
13. 02/19/10 Email from J. Mitman, NRR to L. James, NRR RE: Action:please provide BC with latest version of the Oconee RiskComparison paper by COB 2/19/10 (14 pages) Exemption 7F14. 02/19/10 Email from J. Mitman, NRR to L. James, NRR RE:ACTION: provide BC with latest version of DRA/APOB's documentation of the generic dam failure frequency by COB02/19/10 (16 pages) Exemption 7F15. 03/15/10 Email from J. Mitman, NRR to L. James, NRR on GenericFailure Rate Evaluation for Jocassee (16 pages)Exemption 7F16. 03/16/10 Memo from J. Mitman, NRR to M. Cunningham, NRR onGeneric Failure Rate Evaluation for Jocassee Dam (16 pages)Exemption 7F17. 04/13/10 Draft Oconee Nuclear Site Adequate Protection BackfitDocumented Evaluation (8 pages) Exemption 7F18. 04/14/10 Email from M. Khanna, NRR to P. Hiland, NRR et al., onOconee Adequate Protection Backfit Documented Evaluation (9 pages) Exemption 7F19. 06/03/10 Email from M. Khanna, NRR to D. Skeen, NRR et al., FW:Additional Oconee ICM Information (1 page) Exemptions 6 and7F20. 06/08/10 Email from J. Mitman, NRR to M. Khanna, NRR RE:External Flood Commitments Letter (1 page) Exemption 621. 10/20/10 Email from J. Mitman, NRR to F. Ferrante, NRR FW: OUO-SRI -Oconee Management decision supplement October2010.doc (14 pages, 1 page released)

Exemption 5.22. 11/10/10 Email from J. Mitman, NRR to M. Khanna, NRR RE:Oconee Intake Dike Letter (2 pages) Exemption 623. 12/17/10 Email from M. Khanna, NRR to J. Mitman, NRR onOUO/SRI Oconee Adequate Protection Backfit Documented Evaluation April 12, 2010 (9 pages) Exemption 7F

24. 12/22/10 Meeting request on Oconee External Flooding Issue.(1 page) Exemption 625. 12/22/10 Email from M. Khanna, NRR to J. Mitman, NRR Re: OUO-Oconee Flooding Issue Presentation (35 pages) Exemption 7F26. 02/14/11 Briefing Book for Martin J. Virgilio

-Oconee Nuclear Station(28 pages) Exemption 627. 03/03/11 Briefing Book for Commissioner William C. Ostendorff

-OconeeNuclear Station (24 pages) Exemption 628. 05/18/11 E-mail from: Jonathan Bartley To: Meena Khanna, Gloria Kulesaand George Wilson cc: Leonard Wert, Rick Croteau and WilliamJones

Subject:

Oconee External Flood Path Forward -OUO/SRI(2 pages) Exemption 629. 09/13/11 Briefing Book for Commissioner George Apostolakis

-OconeeNuclear Station (25 pages) Exemption 630. 01/13/12 Email from D. Aird, RES to F. Ferrante, NRR RE: GI-204 DamFailure Comm. Plan Answer (3 pages) Outside of Scope31. 02/01/12 Briefing Book for Commissioner Kristine L. Svinicki

-OconeeNuclear Station (25 pages) Exemptions 6