ML14091A006
From kanterella
Revision as of 01:01, 2 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML14091A006 | |
Person / Time | |
---|---|
Site: | Braidwood |
Issue date: | 03/31/2014 |
From: | Exelon Generation Co |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML14091A243 | List: |
References | |
RS-14-064 | |
Download: ML14091A006 (13) | |
Similar Documents at Braidwood | |
---|---|
Category:Report
MONTHYEARBW230054, Attachment 2: MDMP Deviation Form2023-11-17017 November 2023
[Table view]Attachment 2: MDMP Deviation Form ML23321A0452023-11-17017 November 2023 EC 639996 (Byron), Revision 1 and 640160 (Braidwood), Revision 0, Technical Evaluation for NEI 03-08 Deviation of Baffle-Former Bolts Volumetric Examinations for Byron and Braidwood RS-23-056, Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 102023-04-20020 April 2023 Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 10 BW220062, Pressure and Temperature Limits Report (Ptlr), Revision 92022-10-20020 October 2022 Pressure and Temperature Limits Report (Ptlr), Revision 9 NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits2022-06-30030 June 2022 Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits RS-22-071, License Renewal Response to Commitment 10 - Evaluation of Possible PWSCC Crack Initiation and Propagation in the Steam Generator Channel Head Assembly and Tube-to-Tubesheet Welds2022-06-0707 June 2022 License Renewal Response to Commitment 10 - Evaluation of Possible PWSCC Crack Initiation and Propagation in the Steam Generator Channel Head Assembly and Tube-to-Tubesheet Welds RS-22-047, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2022-04-0808 April 2022 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML21349A1062021-12-15015 December 2021 Justification for the Deviation from MRP 2019-008, Technical Evaluation 635273 BW210065, Pressure and Temperature Limits Report, Revision 82021-10-27027 October 2021 Pressure and Temperature Limits Report, Revision 8 RS-21-112, Updated 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2021-10-22022 October 2021 Updated 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-21-093, R. E. Ginna, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2021-09-0101 September 2021 R. E. Ginna, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections BW210047, ER-BR-330-1008, Revision 0, Snubber Program Plan for the Fourth 10-Year Interval2021-06-30030 June 2021 ER-BR-330-1008, Revision 0, Snubber Program Plan for the Fourth 10-Year Interval RS-21-056, Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Weld2021-05-12012 May 2021 Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Weld RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping2021-01-0404 January 2021 Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping RS-20-154, Application for Revision to TS 5.5.9, Steam Generator (SG) Program for a One-Time Deferral of Steam Generator Tube Inspections2020-12-16016 December 2020 Application for Revision to TS 5.5.9, Steam Generator (SG) Program for a One-Time Deferral of Steam Generator Tube Inspections ML20303A1752020-10-23023 October 2020 Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting ML20195B1622020-06-30030 June 2020 Attachment 11 - SG-SGMP-17-25-NP, Revision 1, Foreign Object Limits Analysis for the Byron and Braidwood Unit 2 Steam Generators June 2020 ML19228A0232019-08-15015 August 2019 Proposed Alternative to Utilize Code Case N-879 ML18348A9792018-12-14014 December 2018 Transmittal of 10 CFR 50.59 Summary Report ML18348A9722018-12-12012 December 2018 Submittal of Analytical Evaluation in Accordance with ASME Code Section XI RS-17-048, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2017-04-0707 April 2017 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML17024A0362016-12-31031 December 2016 Operating Data Report for 2016 RS-16-223, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2016-12-0707 December 2016 Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) RS-16-174, High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review...2016-11-0303 November 2016 High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review... ML17170A1472016-10-0707 October 2016 Areva, 51-9263014-000, PWSCC Evaluation of Uhp Cavitation Peening for Byron and Braidwood Reactor Vessel Head Penetrations. ML16356A0202016-10-0707 October 2016 51-9263014-000, PWSCC Evaluation of Uhp Cavitation Peening for Byron and Braidwood Reactor Vessel Head Penetrations. ML17360A1742016-10-0707 October 2016 Attachment 6: Areva Document 51-9263014-000, PWSCC Evaluation of Uhp Cavitation Peening for Byron and Braidwood Reactor Vessel Head Penetrations (Non-Proprietary) RS-17-039, Attachment 6, Areva Document 51-9263014-000, PWSCC Evaluation of Uhp Cavitation Peening for Byron and Braidwood Reactor Vessel Head Penetrations.2016-10-0707 October 2016 Attachment 6, Areva Document 51-9263014-000, PWSCC Evaluation of Uhp Cavitation Peening for Byron and Braidwood Reactor Vessel Head Penetrations. ML17095A2692016-10-0707 October 2016 Attachment 6, Areva Document 51-9263014-000, PWSCC Evaluation of Uhp Cavitation Peening for Byron and Braidwood Reactor Vessel Head Penetrations. ML16236A2082016-08-23023 August 2016 Report of Backfit Appeal Review Panel ML16214A1992016-08-11011 August 2016 an Assessment of Core Damage Frequency for Byron/Braidwood Backit Appeal Review RS-16-099, Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal2016-06-30030 June 2016 Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal ML16250A5182016-04-30030 April 2016 Technical Evaluation Report Related to the Exelon Generation Company, LLC, License Amendment Request to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink. Docket Nos. Stn 50-456 & 457 RS-16-073, Submittal of Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2016-04-0707 April 2016 Submittal of Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-16-057, Supplement to Response to Requests for Additional Information for Relief for Alternate Requirements for Repair of Reactor Vessel Head Penetrations with Nozzles Having Pressure-Retaining Partial-Penetration J-Groove Welds2016-03-15015 March 2016 Supplement to Response to Requests for Additional Information for Relief for Alternate Requirements for Repair of Reactor Vessel Head Penetrations with Nozzles Having Pressure-Retaining Partial-Penetration J-Groove Welds ML16014A1882016-01-22022 January 2016 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1of the Near-Term Task Force Review of Insights ML15344A1592015-12-10010 December 2015 Submittal of Pressure and Temperature Limits Reports (Ptlrs), Revision 8 and Braidwood, Unit 2 - Pressure and Temperature Limits Reports (Ptlrs), Revision 7 ML15322A3172015-11-18018 November 2015 Record of Decision ML15237A3822015-10-15015 October 2015 Pressure and Temperature Limits Report for Measurement Uncertainty Recapture Power Uprate RS-15-259, Final Report: Five Year Post-Construction Monitoring of the Unionid Community Near the Braidwood Station Kankakee River Discharge.2015-09-30030 September 2015 Final Report: Five Year Post-Construction Monitoring of the Unionid Community Near the Braidwood Station Kankakee River Discharge. RS-15-129, Westinghouse Report CCE-15-27, Revision 1, Braidwood Units 1 and 2 - Responses to NRC Request for Additional Information (Rai)Regarding Ultimate Heat Sink Temperature Increase License Amendment Request, April 20152015-04-30030 April 2015 Westinghouse Report CCE-15-27, Revision 1, Braidwood Units 1 and 2 - Responses to NRC Request for Additional Information (Rai)Regarding Ultimate Heat Sink Temperature Increase License Amendment Request, April 2015 ML14349A6572014-12-15015 December 2014 CFR 50.59 Changes, Tests, and Experiments, Paragraph (d)(2), Summary Report RS-14-348, Comments on the Safety Evaluation Report with Open Items, Related to the License Renewal Application2014-12-15015 December 2014 Comments on the Safety Evaluation Report with Open Items, Related to the License Renewal Application RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 12014-09-24024 September 2014 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 ML14141A1332014-06-30030 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident ML14178B2222014-06-24024 June 2014 Technical Review of TIA 2013-02, Single Spurious Assumptions for Braidwood and Byron Stations Safe-Shutdown Methodology ML14101A4452014-06-0404 June 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident (Tac No. MF0095) ML14101A3522014-06-0404 June 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant Accident ML14127A1742014-05-0707 May 2014 Startup Report for the Measurement Uncertainty Recapture Power Uprate ML14120A0392014-04-24024 April 2014 Units 1 & 2 - License Amendment Request to Install New Low Degraded Voltage Relays & Timers on the 4.16 Kv Engineered Safety Features (ESF) Buses 2023-04-20 Category:Technical MONTHYEARRS-23-056, Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 102023-04-20020 April 2023
[Table view]Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 10 BW220062, Pressure and Temperature Limits Report (Ptlr), Revision 92022-10-20020 October 2022 Pressure and Temperature Limits Report (Ptlr), Revision 9 NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits2022-06-30030 June 2022 Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits BW210065, Pressure and Temperature Limits Report, Revision 82021-10-27027 October 2021 Pressure and Temperature Limits Report, Revision 8 RS-21-093, R. E. Ginna, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2021-09-0101 September 2021 R. E. Ginna, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections BW210047, ER-BR-330-1008, Revision 0, Snubber Program Plan for the Fourth 10-Year Interval2021-06-30030 June 2021 ER-BR-330-1008, Revision 0, Snubber Program Plan for the Fourth 10-Year Interval RS-21-056, Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Weld2021-05-12012 May 2021 Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Weld RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping2021-01-0404 January 2021 Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping RS-20-154, Application for Revision to TS 5.5.9, Steam Generator (SG) Program for a One-Time Deferral of Steam Generator Tube Inspections2020-12-16016 December 2020 Application for Revision to TS 5.5.9, Steam Generator (SG) Program for a One-Time Deferral of Steam Generator Tube Inspections ML20195B1622020-06-30030 June 2020 Attachment 11 - SG-SGMP-17-25-NP, Revision 1, Foreign Object Limits Analysis for the Byron and Braidwood Unit 2 Steam Generators June 2020 ML19228A0232019-08-15015 August 2019 Proposed Alternative to Utilize Code Case N-879 ML18348A9792018-12-14014 December 2018 Transmittal of 10 CFR 50.59 Summary Report ML18348A9722018-12-12012 December 2018 Submittal of Analytical Evaluation in Accordance with ASME Code Section XI RS-16-223, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2016-12-0707 December 2016 Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) ML16356A0202016-10-0707 October 2016 51-9263014-000, PWSCC Evaluation of Uhp Cavitation Peening for Byron and Braidwood Reactor Vessel Head Penetrations. ML17360A1742016-10-0707 October 2016 Attachment 6: Areva Document 51-9263014-000, PWSCC Evaluation of Uhp Cavitation Peening for Byron and Braidwood Reactor Vessel Head Penetrations (Non-Proprietary) ML16250A5182016-04-30030 April 2016 Technical Evaluation Report Related to the Exelon Generation Company, LLC, License Amendment Request to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink. Docket Nos. Stn 50-456 & 457 RS-16-057, Supplement to Response to Requests for Additional Information for Relief for Alternate Requirements for Repair of Reactor Vessel Head Penetrations with Nozzles Having Pressure-Retaining Partial-Penetration J-Groove Welds2016-03-15015 March 2016 Supplement to Response to Requests for Additional Information for Relief for Alternate Requirements for Repair of Reactor Vessel Head Penetrations with Nozzles Having Pressure-Retaining Partial-Penetration J-Groove Welds RS-15-259, Final Report: Five Year Post-Construction Monitoring of the Unionid Community Near the Braidwood Station Kankakee River Discharge.2015-09-30030 September 2015 Final Report: Five Year Post-Construction Monitoring of the Unionid Community Near the Braidwood Station Kankakee River Discharge. RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 12014-09-24024 September 2014 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 ML14178B2222014-06-24024 June 2014 Technical Review of TIA 2013-02, Single Spurious Assumptions for Braidwood and Byron Stations Safe-Shutdown Methodology RS-14-064, Section 5 - Summary of Regulatory Commitments2014-03-31031 March 2014 Section 5 - Summary of Regulatory Commitments ML14091A0062014-03-31031 March 2014 Section 2 - Braidwood Station, Units 1 and 2, Selsmic Hazard and Screening Report RS-14-064, Section 2 - Braidwood Station, Units 1 and 2, Selsmic Hazard and Screening Report2014-03-31031 March 2014 Section 2 - Braidwood Station, Units 1 and 2, Selsmic Hazard and Screening Report RS-14-082, ECCS Evaluation Model Error - 10 CFR 50.46 30-Day Report2014-02-27027 February 2014 ECCS Evaluation Model Error - 10 CFR 50.46 30-Day Report RS-12-159, Enclosure 2 to RS-14-034 - Updated Transmittal 2 (Annex B) Seismic Walkdown Report in Report to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 3.4. Part 12014-02-13013 February 2014 Enclosure 2 to RS-14-034 - Updated Transmittal 2 (Annex B) Seismic Walkdown Report in Report to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 3.4. Part 1 ML14119A3772014-02-13013 February 2014 Enclosure 1 to RS-14-034 - Update Transmittal 2 (Annex B) Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic ML13338A6242013-12-0909 December 2013 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Braidwood Station, Units 1 and 2, TAC Nos.: MF0895 and MF0896 ML11206B1802011-07-20020 July 2011 ARS1-11-01372 - Braidwood Water Sample Results RS-12-023, WCAP-17330-NP, Rev. 1, H*: Resolution of NRC Technical Issue Regarding Tubesheet Bore Eccentricity (Model F/Model D5).2011-06-30030 June 2011 WCAP-17330-NP, Rev. 1, H*: Resolution of NRC Technical Issue Regarding Tubesheet Bore Eccentricity (Model F/Model D5). ML12083A1232011-06-30030 June 2011 WCAP-17330-NP, Rev. 1, H*: Resolution of NRC Technical Issue Regarding Tubesheet Bore Eccentricity (Model F/Model D5). ML1117900382011-06-23023 June 2011 Steam Generator Tube Rupture Analysis Report, Attachment 5a to Braidwood Station, Units 1 & 2, Byron Station, Unit 1 & 2, Request for License Amendment Regarding Measurement Uncertainty Recapture (Mur) Power Uprate ML1117900422011-06-21021 June 2011 Mur Technical Evaluation, (Non-Proprietary Version), Attachment 7 to Braidwood Station, Units 1 & 2, Byron Station, Unit 1 & 2, Request for License Amendment Regarding Measurement Uncertainty Recapture (Mur) Power Uprate ML1110902792011-04-15015 April 2011 ARS1-10-02678, Revised Laboratory Analysis Report. ML0925202652009-09-0404 September 2009 Attachment 3, Corrected Pages to WCAP-17072-NP (Non-Proprietary) ML0918110302009-06-30030 June 2009 Startup Report for the Installation of Areva Np, Inc. Advanced Mark-BW(A) Fuel Assemblies in Braidwood Unit 1 Cycle 15 ML0821900132008-08-0707 August 2008 Monthly Operating Reports Second Quarter 2008 ML17255A8412008-06-30030 June 2008 Full Action Request Report AR 792215, MSLB Calc. Energy Release Error, Redacted RS-17-119, Braidwood, Units 1 and 2 - Full Action Request Report AR 792215, MSLB Calc. Energy Release Error, Redacted2008-06-30030 June 2008 Braidwood, Units 1 and 2 - Full Action Request Report AR 792215, MSLB Calc. Energy Release Error, Redacted RS-17-119, Braidwood, Units 1 and 2 - Full Action Request Report AR 789791, Potential Loss of Margin in Ms Tunnel Pressurization Calc., Redacted2008-06-20020 June 2008 Braidwood, Units 1 and 2 - Full Action Request Report AR 789791, Potential Loss of Margin in Ms Tunnel Pressurization Calc., Redacted ML17255A8392008-06-20020 June 2008 Full Action Request Report AR 789791, Potential Loss of Margin in Ms Tunnel Pressurization Calc., Redacted ML0910702272008-01-31031 January 2008 Guidance for Post Fire Safe Shutdown Circuit Analysis ML0802304842008-01-14014 January 2008 Evaluation of 2002 USGS National Seismic Hazard Assessment, Final Report RS-07-100, Emergency Core Cooling System Evaluation Model Error - 10 CFR 50.46 Report2007-06-22022 June 2007 Emergency Core Cooling System Evaluation Model Error - 10 CFR 50.46 Report RS-07-059, Transmittal of WCAP-16401-NP, Revision 0, Technical Basis for Repair Options for Reactor Vessel Head Penetration Nozzles and Attachment Welds: Byron and Braidwood Units 1 & 2.2007-05-0303 May 2007 Transmittal of WCAP-16401-NP, Revision 0, Technical Basis for Repair Options for Reactor Vessel Head Penetration Nozzles and Attachment Welds: Byron and Braidwood Units 1 & 2. ML0634601312006-12-0707 December 2006 Attachment 11, Exelon/Amergen Response to the Request for Additional Information, EP-EAL-0611, Criteria for Choosing Containment Radiation Monitor Reading Indicative Loss of the RCS Barrier RS-06-039, Relaxation Request for First Revised Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors2006-03-31031 March 2006 Relaxation Request for First Revised Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors RS-05-129, LTR-CDME-05-32-NP, Rev. 2, Limited Inspection of the Steam Generator Tube Portion within the Tubesheet at Byron 2 & Braidwood 2.2005-08-31031 August 2005 LTR-CDME-05-32-NP, Rev. 2, Limited Inspection of the Steam Generator Tube Portion within the Tubesheet at Byron 2 & Braidwood 2. ML0522900832005-08-19019 August 2005 Response to NRC Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized Water Reactors ML0503304802005-01-24024 January 2005 Pressure and Temperature Limits Reports (Ptlrs), Revision 3 2023-04-20 |