Decommissioning Power Reactors: Zion Decommissioning ProjectCRCPD -May 18, 2016 Safely remove a facility from service and reduce residual radioactivity to a level that permits:
(a)release of the property for unrestricteduse, and terminate the license; or(b) release of the property under restricted conditions, and terminate the license 1
2 3
Safe Storage of Spent FuelEquipmentFinancialCommunity 4
5 Safe Storage of Spent FuelPersonnelSafetyRadiological DecommissioningEnvironmentSiteRestoration 6
Fuel removed from coreTransition from Reactor Oversight ProcessEnter ProgramInspection Manual Chapter 2561FlexibleInspection reports publicly available in ADAMSDecommissioning InspectionsLicense terminationEnd Program 8
Zion Nuclear Power StationTwo unit Westinghouse Pressurized Water Reactor~40 miles North of Chicago in Zion, ILPermanently Shutdown February 13, 1998License transfer to ZionSolutions on September 1, 2010 9
Completed:Spent fuel transfer to Independent Spent Fuel Storage InstallationGreater Than Class C (GTCC) waste removedClass B and C waste removedDemolition of Crib house and South GuardhouseZion Radiological Decommissioning Status 10 11Zion Survey Units Final Status Surveys (FSS):Performed by licenseeDemonstrate compliance with the release criteriaCommunication between regulator, licensee, and stateInspections during FSS:Evaluate compliance with License Termination Plan Independent confirmatory surveysNRC contract with Oak Ridge Associated UniversitiesWhat happens after License Termination?
12 13 14 Safe Storage of Spent FuelQuestions?
15 Decommissioning Power Reactors: Zion Decommissioning ProjectCRCPD -May 18, 2016 Safely remove a facility from service and reduce residual radioactivity to a level that permits:
(a)release of the property for unrestricteduse, and terminate the license; or(b) release of the property under restricted conditions, and terminate the license 1
2 3
Safe Storage of Spent FuelEquipmentFinancialCommunity 4
5 Safe Storage of Spent FuelPersonnelSafetyRadiological DecommissioningEnvironmentSiteRestoration 6
Fuel removed from coreTransition from Reactor Oversight ProcessEnter ProgramInspection Manual Chapter 2561FlexibleInspection reports publicly available in ADAMSDecommissioning InspectionsLicense terminationEnd Program 8
Zion Nuclear Power StationTwo unit Westinghouse Pressurized Water Reactor~40 miles North of Chicago in Zion, ILPermanently Shutdown February 13, 1998License transfer to ZionSolutions on September 1, 2010 9
Completed:Spent fuel transfer to Independent Spent Fuel Storage InstallationGreater Than Class C (GTCC) waste removedClass B and C waste removedDemolition of Crib house and South GuardhouseZion Radiological Decommissioning Status 10 11Zion Survey Units Final Status Surveys (FSS):Performed by licenseeDemonstrate compliance with the release criteriaCommunication between regulator, licensee, and stateInspections during FSS:Evaluate compliance with License Termination Plan Independent confirmatory surveysNRC contract with Oak Ridge Associated UniversitiesWhat happens after License Termination?
12 13 14 Safe Storage of Spent FuelQuestions?