ML14139A381
From kanterella
Revision as of 11:07, 28 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML14139A381 | |
Person / Time | |
---|---|
Site: | Arkansas Nuclear |
Issue date: | 05/14/2014 |
From: | Michael Lee Enercon Services, Entergy Nuclear Operations |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML14139A374 | List: |
References | |
OCAN051402 CALC-ANO2-CS-12-00002, Rev. 1 | |
Download: ML14139A381 (21) | |
Similar Documents at Arkansas Nuclear | |
---|---|
Category:Report
MONTHYEAR2CAN112403, Affidavit for Corrosion Evaluation of ANO-2 RVCH CEDM Idtb Weld Nozzle Penetration Repair, Document Number 51-9384397-0012024-10-31031 October 2024
[Table view]Affidavit for Corrosion Evaluation of ANO-2 RVCH CEDM Idtb Weld Nozzle Penetration Repair, Document Number 51-9384397-001 ML24295A1232024-10-21021 October 2024 Enclosure 3: Relief Request ANO2-RR-24-001, Revision 0 (Non-Proprietary) 1CAN072401, Request for Review and Approval of Changes to the Safety Analysis Report and to a Confirmatory Order Clarifying an Alternate Means of Compliance for Pressurizer Heaters Emergency Power Supply2024-07-0202 July 2024 Request for Review and Approval of Changes to the Safety Analysis Report and to a Confirmatory Order Clarifying an Alternate Means of Compliance for Pressurizer Heaters Emergency Power Supply 1CAN062304, Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2023-06-29029 June 2023 Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 1CAN062302, Enclosure 2: ANO-1 SAR Amendment 31 - Redacted Version2023-06-20020 June 2023 Enclosure 2: ANO-1 SAR Amendment 31 - Redacted Version ML23180A1082023-06-20020 June 2023 ANO Unit 1 SAR Amendment 31, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report ML23088A2172022-12-31031 December 2022 Relief Request for Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 - Technical Report, ANP-4023NP, Revision 0, December 2022 2CAN022202, Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods2022-02-24024 February 2022 Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods CNRO-2021-00023, Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-10-0606 October 2021 Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L 0CAN102102, Units 1 and 210 CFR 50.71(e) Report Revision 20 of the ANO Fire Hazards Analysis2021-10-0606 October 2021 Units 1 and 210 CFR 50.71(e) Report Revision 20 of the ANO Fire Hazards Analysis ML21272A3032021-09-30030 September 2021 Technology Inclusive Content of Application Project (Ticap) for Non-Light Water Reactors Westinghouse Evinci; Micro-Reactor Tabletop Exercise Report ML21237A0512021-08-25025 August 2021 Follow-on Risk Informed Performance Based Implementation Guidance Needed for Advanced Non-Light Water Reactors ML21081A1922021-06-30030 June 2021 Enclosure - USNRC-CNSC Joint Report Concerning X-Energy's Reactor Pressure Vessel Construction Code Assessment 2CAN062103, Request for Alternative ANO2-PT-003 End-of-Interval System Leakage Test for Extended Reactor Coolant Pressure Boundary Piping - Fifth Interval2021-06-29029 June 2021 Request for Alternative ANO2-PT-003 End-of-Interval System Leakage Test for Extended Reactor Coolant Pressure Boundary Piping - Fifth Interval 0CAN052102, Annual 10 CFR 50.46 Report for Calendar Year 2020 Emergency Core Cooling System Evaluation Changes2021-05-10010 May 2021 Annual 10 CFR 50.46 Report for Calendar Year 2020 Emergency Core Cooling System Evaluation Changes ML21272A3382021-04-0101 April 2021 Technology Inclusive Content of Application Project (Ticap) for Non-Light Water Reactors Versatile Test Reactor Ticap Tabletop Exercise Report ML21090A0332021-03-31031 March 2021 Historical Context and Perspective on Allowable Stresses and Design Parameters in ASME Section III, Division 5, Subsection Hb, Subpart B (ANL/AMD-21/1) ML21083A1362021-03-23023 March 2021 Completed Activities ML21083A1372021-03-22022 March 2021 NEIMA Reporting ML21083A1382021-03-22022 March 2021 Rulemaking ML21083A1392021-03-22022 March 2021 Strategy 1 ML21083A1402021-03-22022 March 2021 Strategy 2 ML21083A1412021-03-22022 March 2021 Strategy 3 ML21083A1422021-03-22022 March 2021 Strategy 4 ML21083A1432021-03-22022 March 2021 Strategy 5 ML21083A1442021-03-22022 March 2021 Strategy 6 ML21014A2672021-01-14014 January 2021 Preapplication Engagement to Optimize Application Reviews January 12 Version - Copy 1CAN032001, Supplemental Information Related to License Amendment Request to Revise Loss of Voltage Relay Allowable Values2020-03-19019 March 2020 Supplemental Information Related to License Amendment Request to Revise Loss of Voltage Relay Allowable Values 0CAN121901, Summary of Lost Specimens Investigation Report2019-12-0303 December 2019 Summary of Lost Specimens Investigation Report ML18215A1782018-06-30030 June 2018 WCAP-18169-NP, Rev 1, Arkansas Nuclear One Unit 2 Heatup and Cooldown Limit Curves for Normal Operation. ML17214A0292018-02-12012 February 2018 Staff Assessment of Flooding Focused Evaluation (CAC Nos. MF9809 and MF9810) ML17291A0092017-10-26026 October 2017 Staff Assessment Regarding Program Plan for Aging Management for Reactor Vessel Internals (CAC No. MF8155; EPID L-2016-LRO-0001) ML17236A1792017-08-22022 August 2017 Arkansas, Units 1 and 2, ANO Emergency Plan On-Shift Staffing Analysis Report, Revision 2 0CAN081703, Document 51-9257562-001, Revision 1, Arkansas Nuclear One Hfe - High Frequency Confirmation Report2017-08-16016 August 2017 Document 51-9257562-001, Revision 1, Arkansas Nuclear One Hfe - High Frequency Confirmation Report ML17167A0832017-06-28028 June 2017 Arkansas Nuclear One, Unit 2 - Review of Commitment Submittal for License Renewal Regarding Nickel-Based Alloy Aging Management Program Plan (CAC No. MF8154) 0CAN061701, Transmittal of 10 CFR 50.71(e) Report, Revision 17 of the ANO Fire Hazards Analysis2017-06-0707 June 2017 Transmittal of 10 CFR 50.71(e) Report, Revision 17 of the ANO Fire Hazards Analysis 0CAN051704, Engineering Report No. CALC-ANOC-CS-14-00017, Rev 0, 2017 Focused Evaluation for External Flooding at Arkansas Nuclear One.2017-03-13013 March 2017 Engineering Report No. CALC-ANOC-CS-14-00017, Rev 0, 2017 Focused Evaluation for External Flooding at Arkansas Nuclear One. 2CAN011703, Submittal of Additional Protocol Report2017-01-26026 January 2017 Submittal of Additional Protocol Report ML17024A0362016-12-31031 December 2016 Operating Data Report for 2016 0CAN121602, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information Per Nuclear Energy Institute (NEI) 12-06, Appendix H, Revision 2, H.4.3 Path 32016-12-30030 December 2016 Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information Per Nuclear Energy Institute (NEI) 12-06, Appendix H, Revision 2, H.4.3 Path 3 ML17003A2902016-12-20020 December 2016 Areva, Inc. - Engineering Information Record - Arkansas Nuclear One HFE-High Frequency Confirmation Report ML16365A0272016-10-31031 October 2016 ANP-3486NP, Revision 0, MRP-227-A Applicant/Licensee Action Item 6 Analysis for Arkansas Nuclear One Unit 1 (ANO-1). ML16293A5842016-09-30030 September 2016 WCAP-18166-NP, Revision 0, Analysis of Capsule 284 from the Entergy Operations, Inc. Arkansas Nuclear One, Unit 2 Reactor Vessel Radiation Surveillance Program. 1CAN091601, Submittal of Initial Examination Completion of Post-Examination Analysis2016-09-0101 September 2016 Submittal of Initial Examination Completion of Post-Examination Analysis ML16202A1672016-07-0505 July 2016 Report 1500227.401, PWR Internals Aging Management Program Plan. ML16147A3242016-05-31031 May 2016 ANP-3417NP, Rev. 1, MRP-227-A Applicant/Licensee Action Item #7 Analysis for Arkansas Nuclear One, Unit 1. ML16004A1792015-12-31031 December 2015 Attachment 2, ANP-3418NP, Revision 0, Arkansas Nuclear One Unit 1 Reactor Vessel Internals License Renewal Scope and MRP-189, Revision 1 Comparison (MRP-227-A Action Item 2) Licensing Report. (Non-Proprietary) ML15278A0242015-09-28028 September 2015 Attachment 2, Areva Document ANP-3417NP, Revision 0, MRP-227-A Applicant / Licensee Action Item No. 7 Analysis for Arkansas Nuclear One, Unit 1 (Non-Proprietary), Attachment 3, Affidavit, and Attachment 4, List of Commitments ML15099A1522015-04-16016 April 2015 Review of Spring 2014 Steam Generator Tube Inspection Report, Inspection During Refueling Outage 2R23 ML15071A0552015-03-31031 March 2015 ANP-3300Q2NP, Revision 0, Response to Request for Additional Information on Reactor Coolant System Pressure/Temperature and Low Temperature Overpressure Protection System Limits to 54 EFPY for Arkansas Nuclear One, Unit 1. 2024-07-02 Category:Technical MONTHYEAR2CAN112403, Affidavit for Corrosion Evaluation of ANO-2 RVCH CEDM Idtb Weld Nozzle Penetration Repair, Document Number 51-9384397-0012024-10-31031 October 2024
[Table view]Affidavit for Corrosion Evaluation of ANO-2 RVCH CEDM Idtb Weld Nozzle Penetration Repair, Document Number 51-9384397-001 ML24295A1232024-10-21021 October 2024 Enclosure 3: Relief Request ANO2-RR-24-001, Revision 0 (Non-Proprietary) 1CAN072401, Request for Review and Approval of Changes to the Safety Analysis Report and to a Confirmatory Order Clarifying an Alternate Means of Compliance for Pressurizer Heaters Emergency Power Supply2024-07-0202 July 2024 Request for Review and Approval of Changes to the Safety Analysis Report and to a Confirmatory Order Clarifying an Alternate Means of Compliance for Pressurizer Heaters Emergency Power Supply 1CAN062304, Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2023-06-29029 June 2023 Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML23180A1082023-06-20020 June 2023 ANO Unit 1 SAR Amendment 31, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report 1CAN062302, Enclosure 2: ANO-1 SAR Amendment 31 - Redacted Version2023-06-20020 June 2023 Enclosure 2: ANO-1 SAR Amendment 31 - Redacted Version ML23088A2172022-12-31031 December 2022 Relief Request for Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 - Technical Report, ANP-4023NP, Revision 0, December 2022 2CAN022202, Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods2022-02-24024 February 2022 Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods 0CAN102102, Units 1 and 210 CFR 50.71(e) Report Revision 20 of the ANO Fire Hazards Analysis2021-10-0606 October 2021 Units 1 and 210 CFR 50.71(e) Report Revision 20 of the ANO Fire Hazards Analysis ML21272A3032021-09-30030 September 2021 Technology Inclusive Content of Application Project (Ticap) for Non-Light Water Reactors Westinghouse Evinci; Micro-Reactor Tabletop Exercise Report ML21237A0512021-08-25025 August 2021 Follow-on Risk Informed Performance Based Implementation Guidance Needed for Advanced Non-Light Water Reactors ML21081A1922021-06-30030 June 2021 Enclosure - USNRC-CNSC Joint Report Concerning X-Energy's Reactor Pressure Vessel Construction Code Assessment 2CAN062103, Request for Alternative ANO2-PT-003 End-of-Interval System Leakage Test for Extended Reactor Coolant Pressure Boundary Piping - Fifth Interval2021-06-29029 June 2021 Request for Alternative ANO2-PT-003 End-of-Interval System Leakage Test for Extended Reactor Coolant Pressure Boundary Piping - Fifth Interval ML21272A3382021-04-0101 April 2021 Technology Inclusive Content of Application Project (Ticap) for Non-Light Water Reactors Versatile Test Reactor Ticap Tabletop Exercise Report ML21090A0332021-03-31031 March 2021 Historical Context and Perspective on Allowable Stresses and Design Parameters in ASME Section III, Division 5, Subsection Hb, Subpart B (ANL/AMD-21/1) ML18215A1782018-06-30030 June 2018 WCAP-18169-NP, Rev 1, Arkansas Nuclear One Unit 2 Heatup and Cooldown Limit Curves for Normal Operation. ML17236A1792017-08-22022 August 2017 Arkansas, Units 1 and 2, ANO Emergency Plan On-Shift Staffing Analysis Report, Revision 2 0CAN081703, Document 51-9257562-001, Revision 1, Arkansas Nuclear One Hfe - High Frequency Confirmation Report2017-08-16016 August 2017 Document 51-9257562-001, Revision 1, Arkansas Nuclear One Hfe - High Frequency Confirmation Report 0CAN061701, Transmittal of 10 CFR 50.71(e) Report, Revision 17 of the ANO Fire Hazards Analysis2017-06-0707 June 2017 Transmittal of 10 CFR 50.71(e) Report, Revision 17 of the ANO Fire Hazards Analysis 0CAN051704, Engineering Report No. CALC-ANOC-CS-14-00017, Rev 0, 2017 Focused Evaluation for External Flooding at Arkansas Nuclear One.2017-03-13013 March 2017 Engineering Report No. CALC-ANOC-CS-14-00017, Rev 0, 2017 Focused Evaluation for External Flooding at Arkansas Nuclear One. ML16365A0272016-10-31031 October 2016 ANP-3486NP, Revision 0, MRP-227-A Applicant/Licensee Action Item 6 Analysis for Arkansas Nuclear One Unit 1 (ANO-1). ML16293A5842016-09-30030 September 2016 WCAP-18166-NP, Revision 0, Analysis of Capsule 284 from the Entergy Operations, Inc. Arkansas Nuclear One, Unit 2 Reactor Vessel Radiation Surveillance Program. ML16202A1672016-07-0505 July 2016 Report 1500227.401, PWR Internals Aging Management Program Plan. ML16004A1792015-12-31031 December 2015 Attachment 2, ANP-3418NP, Revision 0, Arkansas Nuclear One Unit 1 Reactor Vessel Internals License Renewal Scope and MRP-189, Revision 1 Comparison (MRP-227-A Action Item 2) Licensing Report. (Non-Proprietary) ML15278A0242015-09-28028 September 2015 Attachment 2, Areva Document ANP-3417NP, Revision 0, MRP-227-A Applicant / Licensee Action Item No. 7 Analysis for Arkansas Nuclear One, Unit 1 (Non-Proprietary), Attachment 3, Affidavit, and Attachment 4, List of Commitments ML15071A0552015-03-31031 March 2015 ANP-3300Q2NP, Revision 0, Response to Request for Additional Information on Reactor Coolant System Pressure/Temperature and Low Temperature Overpressure Protection System Limits to 54 EFPY for Arkansas Nuclear One, Unit 1. ML15041A0742015-02-0606 February 2015 ANP-3300Q1NP, Rev. 0, Response to Request for Additional Information on Reactor Coolant System Pressure/Temperature and Low Temperature Overpressure Protection System Limits to 54 EFPY for Arkansas Nuclear One, Unit 1, Attachment 2 to 1CAN0 ML14330A2502014-11-30030 November 2014 Attachment 4 to 1CAN111401, ANP-3300, Revision 1, Pressure-Temperature Limits at 54 Efpy. ML14241A2412014-06-30030 June 2014 ANP-3300, Arkansas Nuclear One (ANO) Unit 1 Pressure-Temperature Limits at 54 EFPY, Attachment 4 ML14139A3812014-05-14014 May 2014 CALC-ANO2-CS-12-00002, Revision 1, Flooding Walkdown Report for Resolution of Fukushima Near Term Task Force Recommendation 2.3, Attachment 2 to 0CAN051402 ML14139A3802014-05-14014 May 2014 CALC-ANO1-CS-12-00003, Revision 1, Flooding Walkdown Report for Resolution of Fukushima Near Term Task Force Recommendation 2.3, Attachment 1 to 0CAN051402 1CAN051401, Time-Limited Aging Analysis Regarding Reactor Vessel Internals Loss of Ductility for Arkansas Nuclear One, Unit 1 at 60 Years Arkansas Nuclear One Unit 12014-05-0606 May 2014 Time-Limited Aging Analysis Regarding Reactor Vessel Internals Loss of Ductility for Arkansas Nuclear One, Unit 1 at 60 Years Arkansas Nuclear One Unit 1 ML14141A5552014-05-0101 May 2014 Attachment 1 to 1CAN051403 PWR Internals Aging Management Program Plan ML14007A4592014-02-25025 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14045A1562014-02-20020 February 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Arkansas Nuclear One, Units 1 and 2, TAC Nos.: MF0942 and MF0943 1CAN091301, Updated Seismic Walkdown Report2013-09-30030 September 2013 Updated Seismic Walkdown Report ML13213A2702013-07-22022 July 2013 Stator Drop Root Cause Evaluation Report CR-ANO-C-2013-00888, Rev. 0, Unit 1 Main Turbine Generator Stator. ML13113A2182013-04-23023 April 2013 Technical Letter Report, PNNL Evaluation and Modeling of Licensee'S Alternative for Volumetric Inspection of Dissimilar Metal Butt Welds at Arkansas Nuclear One ML12334A0092012-11-19019 November 2012 CALC-ANO1-CS-12-00003, Flooding Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Flooding, Attachment 1 to 1CAN111202 ML12334A0072012-11-19019 November 2012 CALC-ANO2-CS-12-00002, Rev. 0, Arkansas Nuclear One Unit 2 Flooding Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Flooding. 1CAN111201, Engineering Report CALC-ANO1-CS-12-00002, Rev. 0, Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Pages 332 Through 5602012-11-16016 November 2012 Engineering Report CALC-ANO1-CS-12-00002, Rev. 0, Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Pages 332 Through 560 ML12342A2202012-11-16016 November 2012 Engineering Report CALC-ANO1-CS-12-00002, Rev. 0, Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Pages 1 Through 331 2CAN111201, Arkansas, Unit 2, Attachment 1 - Engineering Report CALC-ANO2-CS-12-00001, Rev. 0, Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page 364 of 533 Through End2012-11-16016 November 2012 Arkansas, Unit 2, Attachment 1 - Engineering Report CALC-ANO2-CS-12-00001, Rev. 0, Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page 364 of 533 Through End 1CAN111201, Engineering Report CALC-ANO1-CS-12-00002, Rev. 0, Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Pages 1 Through 3312012-11-16016 November 2012 Engineering Report CALC-ANO1-CS-12-00002, Rev. 0, Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Pages 1 Through 331 ML12342A0522012-11-16016 November 2012 Arkansas, Unit 2, Attachment 1 - Engineering Report CALC-ANO2-CS-12-00001, Rev. 0, Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, and Attach. 2, List of Regulatory Commitments, Cover - ML1200903102012-01-0909 January 2012 Email Apparent Cause Evaluation Report, Final ACE for Tube to Tube Wear ML0832603222008-11-12012 November 2008 Letter to Elmo E. Collins from FEMA, Region IV, Denton, Texas Dated 11-12-2008 Subj: ANO Radiological EP Final Report for ANO ML0821900132008-08-0707 August 2008 Monthly Operating Reports Second Quarter 2008 2CAN040801, Summary of Design and Analyses of Weld Overlays for Hot Leg Nozzle Dissimilar Metal Welds for Alloy 600 Mitigation at ANO-22008-04-0202 April 2008 Summary of Design and Analyses of Weld Overlays for Hot Leg Nozzle Dissimilar Metal Welds for Alloy 600 Mitigation at ANO-2 ML0713703522007-05-0808 May 2007 Stress Analysis Summary Report, Pressurizer and Reactor Coolant Hot Leg Weld Overlays 2024-07-02 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML14139A381&oldid=726697"