Past operability

From kanterella
Revision as of 10:58, 2 May 2018 by StriderTol (talk | contribs) (Created page with "A '''past operabilty evaluation''' determines when a condition existed prior to time of discovery. This type of review is most relevant to the prohibited by TS reporting c...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

A past operabilty evaluation determines when a condition existed prior to time of discovery. This type of review is most relevant to the prohibited by TS reporting criteria because a single train may have been inoperable due to a condition without it being known.