ML18018A879
From kanterella
Revision as of 18:37, 20 April 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML18018A879 | |
Person / Time | |
---|---|
Site: | Nine Mile Point ![]() |
Issue date: | 01/31/1974 |
From: | US Atomic Energy Commission (AEC) |
To: | Niagara Mohawk Power Corp |
References | |
Download: ML18018A879 (482) | |
Similar Documents at Nine Mile Point | |
---|---|
Category:Environmental Analysis Statement
MONTHYEARML18018A8791974-01-31031 January 1974
[Table view]Environmental Statement Related to Operation of Nine Mile Point Nuclear Station Unit 1 ML18018B0591973-10-0505 October 1973 Appendix B to Provisional Operating License No. DPR-17 Draft of Proposed Environmental Technical Specifications ML17037C2951973-09-10010 September 1973 Letter Enclosing Comments in Connection with the Draft Environmental Statement and Requesting a Review and Submittal of Any Questions by October 26, 1973 ML17037C3261973-08-24024 August 1973 Letter Regarding a Review of the Draft Environmental Statement and Enclosed Comments from the Soil Conservation Service and Forest Service ML17037C3031973-07-0505 July 1973 Letter Regarding a Draft Environmental Statement ML17037C3011973-07-0505 July 1973 Letter Regarding Notice of Availability of AEC Draft Environmental Statement ML17037C2991973-07-0505 July 1973 Letter Regarding a Draft Environmental Statement and Federal Register Notice of Availability ML17037C2981973-07-0505 July 1973 Letter Regarding a Draft Environmental Statement and Federal Register Notice of Availability ML17037C2971973-07-0505 July 1973 Letter Transmitting Copies of the Summary Sheet for the Draft Environmental Statement Prepared by the Commission'S Regulatory Staff ML17037C2961973-07-0505 July 1973 Letter Transmitting Copies of the Draft Environmental Statement on Environmental Considerations Under the National Environmental Policy Act of 1969 ML17037C3081973-04-27027 April 1973 Letter Concerning the Environmental Impact Documentation to Provide Information in Advance of Receipt of the Draft Environmental Statement ML17037C2821973-02-0909 February 1973 Letter Responding to February 1, 1973 Requesting Additional Information in Connection with the Preparation of the Environmental Statement ML17037C3121973-02-0101 February 1973 Letter Regarding a Request for Additional Information in Connection with the Preparation of the Environmental Statement 1974-01-31 Category:Draft MONTHYEARML18337A0662018-11-28028 November 2018
[Table view]Initial Operator Licensing Written Examination Approval ML18018A8791974-01-31031 January 1974 Environmental Statement Related to Operation of Nine Mile Point Nuclear Station Unit 1 ML18018B0591973-10-0505 October 1973 Appendix B to Provisional Operating License No. DPR-17 Draft of Proposed Environmental Technical Specifications ML17037C2951973-09-10010 September 1973 Letter Enclosing Comments in Connection with the Draft Environmental Statement and Requesting a Review and Submittal of Any Questions by October 26, 1973 ML17037C3261973-08-24024 August 1973 Letter Regarding a Review of the Draft Environmental Statement and Enclosed Comments from the Soil Conservation Service and Forest Service ML17037C3031973-07-0505 July 1973 Letter Regarding a Draft Environmental Statement ML17037C3011973-07-0505 July 1973 Letter Regarding Notice of Availability of AEC Draft Environmental Statement ML17037C2991973-07-0505 July 1973 Letter Regarding a Draft Environmental Statement and Federal Register Notice of Availability ML17037C2981973-07-0505 July 1973 Letter Regarding a Draft Environmental Statement and Federal Register Notice of Availability ML17037C2971973-07-0505 July 1973 Letter Transmitting Copies of the Summary Sheet for the Draft Environmental Statement Prepared by the Commission'S Regulatory Staff ML17037C2961973-07-0505 July 1973 Letter Transmitting Copies of the Draft Environmental Statement on Environmental Considerations Under the National Environmental Policy Act of 1969 ML17037C3081973-04-27027 April 1973 Letter Concerning the Environmental Impact Documentation to Provide Information in Advance of Receipt of the Draft Environmental Statement 2018-11-28 Category:Environmental Impact Statement MONTHYEARML0612903102006-05-31031 May 2006
[Table view]NUREG-1437, Supp 24, Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Nine Mile Point Nuclear Station, Units 1 & 2 Final Report ML17037C3211974-03-27027 March 1974 Letter Requesting That the Commission Withhold Any Final Question on the Applicant'S Request for a Full-Term Operating License Until After Receipt and Consideration of EPA Comments ML18018A8791974-01-31031 January 1974 Environmental Statement Related to Operation of Nine Mile Point Nuclear Station Unit 1 ML17037C3241973-09-0606 September 1973 Letter Responding to the July 5, 1973 Letter Requesting Comment on the AEC Draft Environmental Statement Relating to the Conversion of the Current Provisional Operating License to a Full-Term License ML17037C3281973-08-17017 August 1973 Letter Responding to the July 5, 1973 Letter to Assistant Secretary Davis Concerning the Draft Environmental Impact Statement for Unit 1 and Enclosing Comments from the Federal Railroad Administration and the U.S. Coast Guard ML17037C3291973-03-0101 March 1973 Letter Regarding the Draft Environmental Impact Statement Which Accompanied the January 17, 1973 Letter and Enclosing Comments ML17037C3151972-09-0505 September 1972 Letter Forwarding Environmental Impact Documentation to Provide Information in Advance of Receipt of the Draft Environmental Statement 2006-05-31 Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50 MONTHYEARML23151A3472023-08-21021 August 2023
[Table view]Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration NMP1L3534, License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2023-08-18018 August 2023 License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling NMP1L3484, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Reatment of Structures, Systems and Components for Nuclear Power Reactors2022-12-15015 December 2022 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Reatment of Structures, Systems and Components for Nuclear Power Reactors NMP1L3482, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-12-15015 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML22298A0112022-10-25025 October 2022 License Amendment Request to Adopt Technical Specification Task Force TSTF-295-A, Modify Note 2 to Actions of (Post-Accident Monitoring) PAM Table To. RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration NMP1L3477, License Amendment Request - Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, to Revise.2022-08-12012 August 2022 License Amendment Request - Application to Partially Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, to Revise. NMP1L3467, License Amendment Request - Revision to Alternative Source Term Calculation for Main Steam Isolation Valve (MSIV) Leakage and Non-MSIV Leakage2022-06-29029 June 2022 License Amendment Request - Revision to Alternative Source Term Calculation for Main Steam Isolation Valve (MSIV) Leakage and Non-MSIV Leakage NMP2L2799, License Amendment Request - Revise Surveillance Requirements to Reduce Excessive Fast Starting of Emergency Diesel Generators2022-05-24024 May 2022 License Amendment Request - Revise Surveillance Requirements to Reduce Excessive Fast Starting of Emergency Diesel Generators RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML21277A1932021-11-16016 November 2021 Enclosure 2, Draft Conforming License Amendments NMP2L2780, Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2021-09-30030 September 2021 Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position NMP2L2762, License Amendment Request Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control2021-05-26026 May 2021 License Amendment Request Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments2021-03-25025 March 2021 Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments ML21057A2732021-02-25025 February 2021 Application for Order Approving License Transfers and Proposed Conforming License Amendments NMP1L3369, Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0 Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-12-18018 December 2020 Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0 Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements RS-20-031, License Amendment Request - Application to Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2 .5 and TS 3.6 .3.2, Using the Consolidated Line Item Improvement Process2020-04-30030 April 2020 License Amendment Request - Application to Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2 .5 and TS 3.6 .3.2, Using the Consolidated Line Item Improvement Process NMP2L2716, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2019-12-26026 December 2019 Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors NMP2L2706, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b.2019-10-31031 October 2019 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. RS-19-044, License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions2019-08-28028 August 2019 License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2019-06-27027 June 2019 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability NMP1L3278, License Amendment Request - Administrative Changes to the Technical Specifications2019-06-26026 June 2019 License Amendment Request - Administrative Changes to the Technical Specifications RS-19-040, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-06-25025 June 2019 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program NMP2L2699, License Amendment Request to Revise Technical Specifications Main Steam Isolation Valve Leak Rate2019-05-31031 May 2019 License Amendment Request to Revise Technical Specifications Main Steam Isolation Valve Leak Rate RS-19-003, Application to Adopt TSTF-564, Safety Limit Mcpr.2019-02-0101 February 2019 Application to Adopt TSTF-564, Safety Limit Mcpr. NMP2L2694, Emergency License Amendment Request: One Time Extension to the High Pressure Core Spray Completion Time and Associated Surveillances2018-12-0606 December 2018 Emergency License Amendment Request: One Time Extension to the High Pressure Core Spray Completion Time and Associated Surveillances NMP1L3192, License Amendment Request - Revise Technical Specification 3.3.1 for Primary Containment Oxygen Concentration2018-06-26026 June 2018 License Amendment Request - Revise Technical Specification 3.3.1 for Primary Containment Oxygen Concentration RS-18-020, Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement2018-06-15015 June 2018 Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement RS-17-161, Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR)2018-03-0101 March 2018 Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR) NMP1L3188, License Amendment Request - Proposed Change to Remove Boraflex Credit from Spent Fuel Racks2018-02-0909 February 2018 License Amendment Request - Proposed Change to Remove Boraflex Credit from Spent Fuel Racks NMP1L3142, License Amendment Request - Revise Technical Specifications to Apply TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 22017-12-15015 December 2017 License Amendment Request - Revise Technical Specifications to Apply TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 RS-17-137, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2017-11-0808 November 2017 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements NMP2L2660, License Amendment Request - Safety Limit Minimum Critical Power Ratio Change2017-11-0303 November 2017 License Amendment Request - Safety Limit Minimum Critical Power Ratio Change NMP2L2652, License Amendment Request - Revise Surveillance Requirement 3.5.1.2 to Remove Note2017-08-22022 August 2017 License Amendment Request - Revise Surveillance Requirement 3.5.1.2 to Remove Note NMP1L3158, Enclosure 4E - Procedure Matrix for Nine Mile Point Nuclear Station, Unit 12017-05-31031 May 2017 Enclosure 4E - Procedure Matrix for Nine Mile Point Nuclear Station, Unit 1 NMP2L2641, License Amendment Request - Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Revision 02017-05-31031 May 2017 License Amendment Request - Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Revision 0 ML17164A1532017-05-31031 May 2017 Enclosure 4B - EAL Red-Line Basis Document for Nine Mile Point Nuclear Station, Unit 1 ML17164A1552017-05-31031 May 2017 Enclosure 4D - EAL Front Matter for Nine Mile Point Nuclear Station, Unit 1 ML17164A1542017-05-31031 May 2017 Enclosure 4C - EAL Basis Document for Nine Mile Point Nuclear Station, Unit 1 JAFP-17-0050, Exigent License Amendment Request to Revise Emergency Action Level HU1.52017-05-19019 May 2017 Exigent License Amendment Request to Revise Emergency Action Level HU1.5 ML17037C4192017-05-11011 May 2017 Amendment to Operating License/Change to Appendix a of Technical Specification Concerning Certain Repairs at Facility and Concomitantly to Allow a Continuation of a Slightly Lower Water Level in the Reactor... NMP2L2643, License Amendment Request-Adoption of TSTF-283-A, Revision 3, Modify Section 3.8 Mode Restriction Notes2017-04-0505 April 2017 License Amendment Request-Adoption of TSTF-283-A, Revision 3, Modify Section 3.8 Mode Restriction Notes RS-17-049, Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process2017-03-28028 March 2017 Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process NMP2L2640, License Amendment Request - Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 22017-02-28028 February 2017 License Amendment Request - Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 NMP2L2639, Supplement to License Amendment Request - Proposed Revision to Technical Specification in Response to GE Energy- Nuclear 10 CFR Part 21 Safety Communication SC05-032017-02-17017 February 2017 Supplement to License Amendment Request - Proposed Revision to Technical Specification in Response to GE Energy- Nuclear 10 CFR Part 21 Safety Communication SC05-03 NMP1L3122, License Amendment Request - Proposed Changes Regarding Partial Length Fuel Rod (PLR) Burnup2017-01-0303 January 2017 License Amendment Request - Proposed Changes Regarding Partial Length Fuel Rod (PLR) Burnup NMP2L2584, License Amendment Request - Proposed Revision to Technical Specification in Response to GE Energy - Nuclear 1 O CFR Part 21 Safety Communication SC05-032016-12-13013 December 2016 License Amendment Request - Proposed Revision to Technical Specification in Response to GE Energy - Nuclear 1 O CFR Part 21 Safety Communication SC05-03 NMP2L2634, Emergency License Amendment Request - Proposed Changes to the High Pressure Core Spray System and Reactor Core Isolation Cooling System Actuation Instrumentation Technical Specifications2016-11-26026 November 2016 Emergency License Amendment Request - Proposed Changes to the High Pressure Core Spray System and Reactor Core Isolation Cooling System Actuation Instrumentation Technical Specifications 2023-08-21 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML18018A879&oldid=593907"