A Traditional Enforcement Violation (TEV) is a type of NRC finding used for violations involving actual consequences, willfulness, or the potential for impacting the regulatory process.

List

 SignificanceSiteTitle
05000010/FIN-2012012-01Severity level IVDresdenFailure to provide complete and accurate decommissioning status reports
05000219/FIN-2005006-03Severity level IVOyster CreekFailure to Perform an Adequate 10 CFR 50.59 Analysis (ESW Overboard)
05000219/FIN-2009007-01Severity level IVOyster CreekInadequate 10 CFR 50.59 Evaluation for Trunnion Room Door/Secondary Containment Temporary Modification
05000219/FIN-2011002-03Severity level IVOyster CreekFailure to Administer Post Event Fitness for Duty Testing
05000219/FIN-2011503-01Severity level IVOyster Creek(Traditional Enforcement) Changes to EAL Basis Decreased the Effectiveness of the Plan without Prior NRC Approval
05000219/FIN-2012002-04Severity level IVOyster CreekFailure to Ensure Licensed Operators Met License Conditions for Medical Examinations
05000219/FIN-2012002-05Severity level IVOyster CreekLicensee-Identified Violation
05000219/FIN-2012012-01Severity level IVOyster CreekFailure to provide complete and accurate decommissioning status reports
05000219/FIN-2015001-03Severity level IVOyster CreekIncomplete 50.72 and 50.73 Reports Associated with Secondary Containment Integrity
05000219/FIN-2015008-01Severity level IVOyster CreekUse of an Analytical Method to Determine the Core Operating Limits Without Prior NRC Approval
05000219/FIN-2018001-01Severity level IVOyster CreekUntimely Licensee Event Report for Reportable Conditions Associated with the No. 2 Emergency Diesel Generator
05000220/FIN-2002009-01Severity level IVNine Mile PointInaccurate Reporting of Performance Indicator Data
05000220/FIN-2009003-02Severity level IVNine Mile PointOperator Failure to Obtain Senior Reactor Operator Permission Prior to Changing Reactor Power
05000220/FIN-2010008-01Severity level IVNine Mile PointDeliberately Failing to Use a Whole Body Contamination monitor When Exiting the Radiologically Controlled Area
05000220/FIN-2011009-01Severity level IVNine Mile PointIntentional Failure to Follow Procedure
05000220/FIN-2012005-04Severity level IVNine Mile PointLicensee-Identified Violation
05000220/FIN-2013002-03Severity level IVNine Mile PointFailure to Submit a Required Licensee Event Report
05000220/FIN-2013005-03Severity level IVNine Mile PointInadequate DSC Welding Procedure to Control and Monitor Hydrogen Concentrations
05000220/FIN-2014005-01Severity level IIINine Mile PointIncomplete and Inaccurate Medical Information Provided by Exelon Which Impacted Issuance of Initial and Renewal Licenses
05000237/FIN-2007004-03Severity level IVDresdenInadequate Reactor Operators Shift Turnover
05000237/FIN-2007405-01Severity level IIIDresdenSecurity
05000237/FIN-2009301-01Severity level IVDresdenFailure to Provide Complete and Accurate Information to the NRC Associated with Verifying No Operating Test Item Duplication with the Audit Test
05000237/FIN-2010002-01Severity level IVDresdenFailure to Record the Identity of Personnel Performing Post-Maintenance Tests
05000237/FIN-2011008-05Severity level IVDresdenFailure to Obtain NRC Approval for Change Adverse to Safe Shutdown
05000237/FIN-2012002-08Severity level IVDresdenFailure to Make a Required 8 Hour Event Report Per 10 CFR 50.72(b)(3)(v)(D)
05000237/FIN-2012008-03Severity level IVDresdenFailure to Provide Complete and Accurate Information to the NRC
05000237/FIN-2013004-01Severity level IVDresdenFailure to Update the UFSAR for Reactor Water Cleanup Design Changes
05000237/FIN-2014004-01Severity level IVDresdenFailure to Perform an Adequate 10 CFR 50.59 Evaluation for Procedure DOP 130002
05000237/FIN-2014403-02Severity level IVDresdenLicensee-Identified Violation
05000237/FIN-2018003-02Severity level IVDresdenLicensee-Identified Violation
05000244/FIN-2003003-03Severity level IVGinnaThree SRO Licensed Operator Certifications Were Not Renwed by Rg&E
05000244/FIN-2010010-01Severity level IVGinnaDeliberately Providing Inappropriate Assistance During General Employee Training
05000244/FIN-2014005-01Severity level IIIGinnaIncomplete and Inaccurate Medical Information Provided by Exelon Which Resulted in Issuance of an Initial Senior Operator License without a Required Medical Restriction
05000247/FIN-2005005-07Severity level IVIndian PointFailure to Make a 10 CFR 50.72(B)(3)(XIII) Notification
05000247/FIN-2009005-01Severity level IVIndian PointIncomplete Licensed Operator Medical Examinations
05000247/FIN-2009005-04Severity level IVIndian PointTransient Combustibles Stored on the ISFSI pad
05000247/FIN-2010008-01Severity level IVIndian PointUFSAR Section 5.1.3.12, Cathodic Protection, not updated consistent with current plant conditions
05000247/FIN-2012003-02Severity level IVIndian PointAn LER for an Inoperable Main Steam Safety Valve Was Not Submitted When Required
05000247/FIN-2013012-01Severity level IVIndian PointFailure to Submit a Required 10 CFR 50.73 Report
05000247/FIN-2014005-02Severity level IIIIndian PointIncomplete and Inaccurate Medical Information Provided by the Licensee Which Impacted an Operators License Renewal
05000247/FIN-2014403-01Severity level IVIndian PointSecurity
05000247/FIN-2014404-01Severity level IVIndian PointSecurity
05000247/FIN-2016004-05Severity level IVIndian PointLicensee-Identified Violation
05000247/FIN-2017001-03Severity level IVIndian PointLicensee-Identified Violation
05000250/FIN-2007004-02Severity level IVTurkey PointInappropriate Blanket Overtime Authorization
05000250/FIN-2007402-01Severity level IITurkey PointTampering with security weapons
05000250/FIN-2008005-01Severity level IVTurkey PointFailure to Accomplish An Activity Affecting Quality in Accordance with Procedures
05000250/FIN-2010008-02Severity level IIITurkey PointFailure to correct Boraflex degradation in the SFP in a timely manner
05000250/FIN-2010009-02Severity level IIITurkey PointFailure to report Unit 3 spent fuel pool operation with degrading Boraflex.
05000250/FIN-2010009-03Severity level IVTurkey PointFailure to maintain FSAR description of Unit 3 spent fuel pool activities