ENS 57530
ENS Event | |
|---|---|
01:15 Feb 1, 2025 | |
| Title | Shutdown Required by Technical Specifications |
| Event Description | The following information was provided by the licensee via phone and email:
On 1/31/2025, at 2015 EST, a technical specification required shutdown was initiated at Hope Creek Unit 1. Technical Specification 3.8.1.1.e. 'AC sources - operating' was entered on 1/31/2025, at 0735 EST, with a required action to restore at least one of the inoperable diesel generators to operable status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. This required action was not completed within the allowed outage time; therefore a technical specification required shutdown was initiated, and this event is being reported as a four-hour, non-emergency notification per 10CFR50.72(b)(2)(i). On 1/31/2025, at 2121 EST, one of the inoperable diesel generators was restored to operable prior to the Technical Specification 3.8.1.1.e required time to be in hot shutdown. The Unit 1 shutdown was suspended at that time. Technical Specification 3.8.1.1.b remains active for one diesel inoperable. There was never an impact on the health and safety of the public or plant personnel. The NRC Resident Inspector has been notified. |
| Where | |
|---|---|
| Hope Creek New Jersey (NRC Region 1) | |
| Reporting | |
| 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown | |
| Time - Person (Reporting Time:+-2.48 h-0.103 days <br />-0.0148 weeks <br />-0.0034 months <br />) | |
| Opened: | Matthew Jermusyk 22:46 Jan 31, 2025 |
| NRC Officer: | Josue Ramirez |
| Last Updated: | Feb 1, 2025 |
| 57530 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 57530\u003C/a\u003E - \u003Ca href=\"/Hope_Creek\" title=\"Hope Creek\"\u003EHope Creek\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EShutdown Required by Technical Specifications\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 57530 - Hope Creek\n","link":"","lat":39.46618888888889,"lon":-75.53605833333333,"icon":"/w/images/c/cc/PSEG_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
|---|---|
| Reactor critical | Critical |
| Scram | No |
| Before | Power Operation (100 %) |
| After | Power Operation (81 %) |
WEEKMONTHYEARENS 575302025-02-01T01:15:0001 February 2025 01:15:00
[Table view]10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Shutdown Required by Technical Specifications ENS 564952023-04-30T06:00:00030 April 2023 06:00:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown ENS 442402008-05-25T13:30:00025 May 2008 13:30:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Inverter Fuse Failure ENS 419562005-08-28T15:00:00028 August 2005 15:00:00 10 CFR 50.72(b)(3)(v)(A), Loss of Safety Function - Shutdown the Reactor, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Due to Inoperable Suppression Chamber Vacuum Breaker ENS 408762004-07-16T14:00:00016 July 2004 14:00:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Shutdown/Loss of Single Safety Function ENS 405392004-02-23T06:52:00023 February 2004 06:52:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Started Due to Grass Intrusion 2025-02-01T01:15:00 | |