LER-1980-009, /03L-0:on 801003,during Performance of PT-12.1 to Verify Operability of 1A Emergency Generator,Part from Barring Device Seen to Fly Out.Caused by Bearings Not Designed to Withstand Operation W/Generator Running |
| Event date: |
|
|---|
| Report date: |
|
|---|
| 2441980009R03 - NRC Website |
|
text
NRC,FQPRM 366 (7.77I 80-009/03L-0 LICENSEE EVENT REPORT ~
(CAR 1224)
CONTROL BLOCK:
QI
{PLEASE PRINT OR TYPE ALLREQUIRED INFORMATION)
I 6
NY RE G1Q200 00000 00Q241111QR~QE 9
LICENSEE, CODE 14 15 LICENSE NUMBER 25 26 LICENSE TYPE 30 57 CAT 58
~O 7
8 CON'T
~01
~LQ60 5
0 0
0 2
4 4Q7 1
0 0
3 8
OQB1 0
3 1
8 0
Qe 60 61 DOCKET NUMBER 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES Q10 During performance of PT-12.1 to verif o erabilit of lA Emer enc
'Generator EG 7
8 and 1B EG started during inspection of 1A EG.
(T. S. 3. 7. 1d. ) Investigation, 'ncluding 6
con suiting with manufacturer,showed that device, used to rotate shaft during overhaul when engaged did not affect operability of EG or upon failure would not damage EG or other equipment.
~3 parts found to be from barring device were seen to fly out.
EG was immediately stoppe
~OB 7
8 9
80
~Oe 7
8 SYSTEM
CAUSE
CAUSE
- COMP, VALVE CODE CODE SUBCODE COMPONENT CODE SUBCODE SUBCODE
~EE Qll A
QI2
~XQTE E N G
1 N
E 04
~ZQ>>
~Z Q'8 9
10 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION LERJRO EVENT YEAR REPORT NO.
CODE TYPE NO.
Qlz REPQRT ~80
+
~00 0
+W
~02
+L
+
0 21 22 23 24 26 27 28 29 30 31 32 ACTION FUTURE EFFECT SHUTDOWN ATTACHMENT NPRDP PRIME COMP.
COMPONENT TAKEN ACTION ON PLANT METHOD HOURS Q22 SUBMITTED FORM SUB.
SUPPLIER MANUFACTURER Q18 ~G plz
~ZQ20
~Z pzl 0
0 0
0
~N pzz
~N Qzz
~A Q25 A
1 S
2 Qzs 33 34 35 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS Q27 8
investigation could not Identity person who engaged barring device.
According to manufacturer bearings for devices are not designed to withstand continued operation 1
being engaged with EG running.
Devices have been removed from both units.
Proce-3 dures have been changed to instal 1 and remove them before and after maintenance 7
6 9
FACILITY STATUS
% POWER OTHER STATUS QBO 6
E zs 0
0 ze NA CO Lip~O ACTIVITY CONTENT RELEASED OF RELEASE AMOUNTOF ACTIVITYQS 6
~~
Q33
~~Q34 7
8 9
10 44 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION Q39 1 ~00 0
Qzl ~ZQ38 NA 7
8 9
11 12 13 PERSONNEL INJURIES NUMBER DESCRIPTIONQ41 8 ~00 0
Q45 NA METHOD OF DISCOVERY DISCOVERY DESCRIPTION Q32
~BQ31 Performance of PT 12.1 45 46 LOCATIONOF RELEASE Q6 NA 45 0
80 80 80 80 7
8 7
8 o
8 NAME OF PREPARER S. M. Spector 9
11 12 LOSS OF OR DAMAGETO FACILITYQ43 TYPE
DESCRIPTION
Z Qz NA 9
10 PUBLICITY ISSUED DESCRIPTION~
'A 9
10 80 68 69 NRC USE ONLY 80 o
80 ER PHDNE 5/524-4446, ext. 214 a
$811040 Vcc g
J a
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000244/LER-1980-001, Forwards LER 80-001/03L-0 | Forwards LER 80-001/03L-0 | | | 05000244/LER-1980-001-03, /03L-0:on 800118,while Performing PT-12.1, Emergency Generator 1A Would Not Accept Nameplate Steady Load Rating.Caused by Adjusting Governor Setting to Incorrect Value Indicated on Dynotape Sticker Setting Mod | /03L-0:on 800118,while Performing PT-12.1, Emergency Generator 1A Would Not Accept Nameplate Steady Load Rating.Caused by Adjusting Governor Setting to Incorrect Value Indicated on Dynotape Sticker Setting Mod | | | 05000244/LER-1980-002, Forwards LER 80-002/03L-0 | Forwards LER 80-002/03L-0 | | | 05000244/LER-1980-002-03, /03L-0:on 800331,during Review of Special Instructions,Discovered That Time from Previous Boron Concentration Sample Exceeded 75 Days.Caused by Inadequate Guidance for Bimonthly Sampling Schedule.Schedule Changed | /03L-0:on 800331,during Review of Special Instructions,Discovered That Time from Previous Boron Concentration Sample Exceeded 75 Days.Caused by Inadequate Guidance for Bimonthly Sampling Schedule.Schedule Changed | | | 05000244/LER-1980-003-01, /01T-0:on 800414,during Steam Generator Inservice Insp,One Tube in a Steam Generator & 34 Tubes in B Generator Showed Pluggable Indications.Probably Caused by Concentration of Caustics in Crevices | /01T-0:on 800414,during Steam Generator Inservice Insp,One Tube in a Steam Generator & 34 Tubes in B Generator Showed Pluggable Indications.Probably Caused by Concentration of Caustics in Crevices | | | 05000244/LER-1980-003, Forwards LER 80-003/01T-0 | Forwards LER 80-003/01T-0 | | | 05000244/LER-1980-004, Forwards LER 80-004/01T-0 | Forwards LER 80-004/01T-0 | | | 05000244/LER-1980-004-01, /01T-0:on 800506,during post-installation Test of Reactor Vessel Head Vent,Dc Power Switches for Both Trains of Low Temp Overpressurization Protection Found in Off Position W/No RCS Vent Open.Cause Unknown | /01T-0:on 800506,during post-installation Test of Reactor Vessel Head Vent,Dc Power Switches for Both Trains of Low Temp Overpressurization Protection Found in Off Position W/No RCS Vent Open.Cause Unknown | | | 05000244/LER-1980-005-01, /01T-0:on 800603,during Performance of Monthly Verification Procedure,Loop a Accumulator Injection Circuit Breaker Found in on Position.Cause Not Stated.Breaker Returned to Off Position | /01T-0:on 800603,during Performance of Monthly Verification Procedure,Loop a Accumulator Injection Circuit Breaker Found in on Position.Cause Not Stated.Breaker Returned to Off Position | | | 05000244/LER-1980-005, Forwards LER 80-005/01T-0 | Forwards LER 80-005/01T-0 | | | 05000244/LER-1980-006, Forwards LER 80-006/01T-0 | Forwards LER 80-006/01T-0 | | | 05000244/LER-1980-006-01, /01T-0:on 800711,during Routine Analysis of Boric Acid Tank Samples,Concentration Exceeded Tech Spec Limit on Three Occasions.Caused by Entry of Ascarite Into Tank. Reagent Check Now Performed W/Sampling | /01T-0:on 800711,during Routine Analysis of Boric Acid Tank Samples,Concentration Exceeded Tech Spec Limit on Three Occasions.Caused by Entry of Ascarite Into Tank. Reagent Check Now Performed W/Sampling | | | 05000244/LER-1980-007, Forwards LER 80-007/03L-0 | Forwards LER 80-007/03L-0 | | | 05000244/LER-1980-007-03, /03L-0:on 800829,controller TC-402R for Channel II Did Not Respond to Change in Input.Caused by Faulty Main Amplifier Bridge Assembly & Low Limit Transmitter.Controller Replaced & Calibr | /03L-0:on 800829,controller TC-402R for Channel II Did Not Respond to Change in Input.Caused by Faulty Main Amplifier Bridge Assembly & Low Limit Transmitter.Controller Replaced & Calibr | | | 05000244/LER-1980-008, Forwards LER 80-008/03L-0 | Forwards LER 80-008/03L-0 | | | 05000244/LER-1980-008-03, /03L-0:on 800910,during PT-12.2 Test for B Emergency Generator,Bus 16 Breaker Did Not Close.Caused by Guide Pin Split End Opening & Binding Control Relay Antipump Release Lever.Split End Closed | /03L-0:on 800910,during PT-12.2 Test for B Emergency Generator,Bus 16 Breaker Did Not Close.Caused by Guide Pin Split End Opening & Binding Control Relay Antipump Release Lever.Split End Closed | | | 05000244/LER-1980-009, Forwards LER 80-009/03L-0 | Forwards LER 80-009/03L-0 | | | 05000244/LER-1980-009-03, /03L-0:on 801003,during Performance of PT-12.1 to Verify Operability of 1A Emergency Generator,Part from Barring Device Seen to Fly Out.Caused by Bearings Not Designed to Withstand Operation W/Generator Running | /03L-0:on 801003,during Performance of PT-12.1 to Verify Operability of 1A Emergency Generator,Part from Barring Device Seen to Fly Out.Caused by Bearings Not Designed to Withstand Operation W/Generator Running | | | 05000244/LER-1980-010, Forwards LER 80-010/03L-0 | Forwards LER 80-010/03L-0 | | | 05000244/LER-1980-010-03, /03L-0:on 801125,pinhole Leak Found in Weld on RHR Thermowell.Caused by Poor Quality Weld.Weld Repaired | /03L-0:on 801125,pinhole Leak Found in Weld on RHR Thermowell.Caused by Poor Quality Weld.Weld Repaired | | | 05000244/LER-1980-011, Forwards LER 80-011/03L-0 | Forwards LER 80-011/03L-0 | | | 05000244/LER-1980-011-03, /03L-0:on 801211,bus 17 Breaker from 1B Emergency Generator Failed to Close.Cause Not Stated.Testing Interval Shortened to Verify Operability 810106 | /03L-0:on 801211,bus 17 Breaker from 1B Emergency Generator Failed to Close.Cause Not Stated.Testing Interval Shortened to Verify Operability 810106 | |
|