05000316/LER-1978-093-03, /03L-0 on 781125:rod Position Indication(Rpi)For Control Rod H-8 Exceeded 12 Step Limit.Caused by H-8 Drift

From kanterella
Revision as of 17:03, 7 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
/03L-0 on 781125:rod Position Indication(Rpi)For Control Rod H-8 Exceeded 12 Step Limit.Caused by H-8 Drift
ML17317A826
Person / Time
Site: Cook 
Issue date: 12/20/1978
From: Rischling J
INDIANA MICHIGAN POWER CO.
To:
Shared Package
ML17317A823 List:
References
LER-78-093-03L, LER-78-93-3L, NUDOCS 7812270264
Download: ML17317A826 (2)


LER-1978-093, /03L-0 on 781125:rod Position Indication(Rpi)For Control Rod H-8 Exceeded 12 Step Limit.Caused by H-8 Drift
Event date:
Report date:
3161978093R03 - NRC Website

text

Qs 1

2 2

0 7

8 QB 74 75 REPORT DATE 80 NRC FORM 366 U. S. NUClEAR REGULATORY COMMISSION (7.77)

LICENSEE EVENT REPORT CONTROL BLOCK:"

I Q1 tPLEASE PRINT OR TYPE ALLREQUIRED INFORMATION) 6

~o1 M I D

C C

2Q2 0

0 0

0 0

0 0

0 P

P Q3

. O~O 7

8 9

LICENSEE CODE 14 15 LICENSE NUMBER 25 26 LICENSE TYPE 30 57 CAT 58 CON'T SOURCE LgQB 0

5 0

0 0>>

6 Q7 7

8 60 61 DOCKET NUMBER 68 69 EVENT DATE EVENT DESCRIPTION AND PROBABlE CONSEQUENCES Q10 WHILE INCREASING POWER ON 'OVEMBER 25 AND 26 ROD POSITION INDICATION RPI FOR CONTEGL ROD H-8 EXCEEDED %HE 12 STEP LIMITOF T. S ~ 3 ~ 1. 3 ~ 2 ON 'I%0 OCCASIONS ON BOTH OCCASIONS THE APPLICABLE ACTION REQUIREMENTS WERE FULFILLED. PREVIOUS OCCURRENCES INCLUDE: EO 050 315/76 13'4 g 54 g 77 27 E 28 4 33

@ 34 '8 04 07 38 46 ~

o 6

BQ-050 316/78 07i08i22i3li4li64 75 84 ~

~OS 80 7

8 9

7 8

~ SYSTEM

CAUSE

CAUSE COMP.

VALVE CODE CODE SUBCODE COMPONENT CODE SUBCODE SUBCODE

~IE Ql>

E Qn

~z Qn x

N 6

T R

0 04

~x 0>>

z Qn 9

10 11

'12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION LER/RO EVENT YEAR REPORT NO.

CODE TYPE NO.

Q17 REPORT LE U

~o>>

U~

M~

UL 21 22 23 24 26 27 28 29 30 31 32 ACTION FUTURE EFFECT SHUTDOWN ATTACHMENT NPRDQ PRIME COMP.

COMPONENT TAKEN ACTION ON PLANT METHOD HOURS Q22 SUBMITTED FORM SUB.

SUPPLIER MANUFACTURER 018 ~~0~~

~~Q20

~~Q2 LO 0

0 0

N Qn

~NQ>4 IJLIQ25 S

33 34 35 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS Q27 INVESTIGATION HEVFMZD EHAT 1HE SIGNAL CONDITIONING NODULE HAD DRIFZED POR H-8.

AFZER VERIFYING THE POSITION OF EGD H-8 BY MEASURING THE Em'S SECONDAHY COIL VOLTAGE CZ3

/

THE SIGNAL CCNDITXONING NODULE WAS AMUSTED FOR KSE PROPER OUTPUT AND RPI POR H-8 WAS RETURNED TO SERVICE INDICATING THE CORRECT EGD POSITION.

AN ENGINEERING REVIEW 4

IS IN -PKGHESS TO DETERMINE THE ROOT CAUSE OF THXS EKCUEPZNG PROBLEM.

CE3 ACTIVITY CONTENT RELEASED OF RElEASE AMOUNTOF ACTIVITY EZ L~JQ Lies 7

8 9

10 44 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION Q39

~00 0

Q~~ ~ZQ><

7 8

9 11 12 13 PERSONNEL INJURIES NUMBER DESCRIPTION 41 a ~00 o

Q40 NA 7

8 9

11 12 LOSS OF OR DAMAGE,TOFACILITYQ43 TYPE

DESCRIPTION

Z Q42 NA LOCATIONOF RELEASE Q 45 7

8 9

10 PUBLICITY ISSUED DESCRIPTION~

p

~Q44 7

8 9

10 NAME OF PREPARER L.

PHONE:

68 69 NRC USE ONLY 7

8 9

FACILITY

~3P METHOD OF STATUS

% POWER OTHERSTATUS ~

DISCOVERY DISCOVERY DESCRIPTION Q32 1

6

~C Q28 ~06 6

Q29 NA

~Q3>

OPEROOOR OESERVATXON 7

8 9

10 12 13 44 45 46 80 80 80 80 80 80 C4a 80 a

0L0

l'