05000316/LER-1979-032-03, /03L-0:on 790911,during Surveillance Test,High Pressure Reactor Trip Bistable Found to Trip at Setpoint Corresponding to 2417 Psig.Caused by Defective Bistable. Bistable Replaced

From kanterella
Revision as of 16:21, 7 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
/03L-0:on 790911,during Surveillance Test,High Pressure Reactor Trip Bistable Found to Trip at Setpoint Corresponding to 2417 Psig.Caused by Defective Bistable. Bistable Replaced
ML17326A284
Person / Time
Site: Cook 
Issue date: 10/10/1979
From: Rischling J
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML17326A281 List:
References
LER-79-032-03L-01, LER-79-32-3L-1, NUDOCS 7910160511
Download: ML17326A284 (4)


LER-1979-032, /03L-0:on 790911,during Surveillance Test,High Pressure Reactor Trip Bistable Found to Trip at Setpoint Corresponding to 2417 Psig.Caused by Defective Bistable. Bistable Replaced
Event date:
Report date:
3161979032R03 - NRC Website

text

U. S. NUCLEAR REGULATORY COMMISSION [CENSEE EVENT REPORT Qi (PLEASE PRINT OR TYPE ALLREQUIRED INFORMATION) 6 0

0 0

0 0

00 0

0 OQE 4

1 1

1 IQE~Q LICENSE NUMBER

'25 26 LICENSE TYPE 30 57 CAT 58 NRC FORM 366 (7.77)

A CONTROL BLOCK:

I M I D

C C

2 Q2 0

9 LICENSEE'ODE 14 15

~O 7

8 CON'T

~O 7

8 REPDRTILI~ 0 5

0 0

0 3

1 6

Qj 1

QS 1

0 1

0 7 9Q SOURCE 60 61 DOCKET NUMBER 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES 010 DURING A SURVEILLANCE TEST ON PRESSURIZER PRESSURE-PROTECTION SET I,

~O3

~O4

~O6

~OB

'THE HIGH PRESSURE REACTOR TRIP BISTABLE WAS FOUND TO TRIP AT A SET-POINT CORRESPONDING TO 2417 PSIG.

THIS EXCEEDED THE REACTOR TRIP VALUE SPECIFIED IN T.S.

TABLE 2.2-1.

~O

~os 7

8 80

~OB 7

8 9

SYSTEM

CAUSE

CAUSE COMP.

VALVE CODE CODE SUBCODE COMPONENT CODE SUBCODE SUBCODE

~IR Q11 UEQ12 UGQEE I

N S

T R

0 QE USS LHS 9

10 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION LERIRO EVENT YEAR REPORT NO.

CODE TYPE 5 NO.

Q11 REPoRT

~7 9

U Uo OUz U~ M U

U 21 22 23 24 26 27 28 29 30 31 32 ACTION FUTURE EFFECT SHUTDOWN ATTACHMENT NPRDQ PRIME COMP.

COMPONENT TAKEN ACTION ON PLANT METHOD HOURS +22 SUBMITTED FORM SUB.

SUPPLIER MANUFACTURER QIB ~Z Q19

~Z Q20 QJ Q21 PJ Q23 ~ Q24

~A Q26 Q26 33 34 '5 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS Q27 p

ON SEPTEMBER 1 1 I THE BISTABLE WAS ADJUSTED TO WITHIN ALLOWABLE VALUES AND RETURNED TO OPERATION.

ON SEPTEMBER 18, A RECHECK OF THE BISTABLE TRIP VALUE INDICATED THAT THE BISTABLE HAD AGAIN DRIFTED, THIS TIME 3

IN A CONSERVATIVE DIRECTION.

THIS BISTABLE WAS DETERMINED TO BE 4

INOPERABLE AND THE ACTION REQUIREMENT

(

SEE SUPPLEMENT) 7 8

9 FACILITY STATUS 9IPPOWER OTHER STATUS Q 5

E QES ~10 0

QES NtE 7

8 9

10 12 13 44 ACTIVITY CONTENT RELEASED OF RELEASE AMOUNTOF ACTIVITY 6

Z Q3 Z Q NA 7

8 9

'0 11 44 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION Q39

~oo oQETUzQER NtE

/

7 8

9 11 12 13 PERSONNEL INJURIES METHOD OF DISCOVERY DISCOVERY DESCRIPTION Q32

~BQ31 SURVEILLANCE TEST 45

'6 LOCATIONOF RELEASE Q 45 80 80 80 80 7

8 7

8 O

7 8

9 11 12 LOSS OF OR DAMAGETO FACILITY 43 TYPE

DESCRIPTION

ZQ4, NA 9

10 PUBLICITY ISSUED DESCRIPTION~

~NQ NA 9

10 NAME OF PREPARER J. L. Rischling NRC USE ONLY 68 69 616-465-5901 PHONE:

80 80 2

80 ER 0a 59

fg

SUPPLEMENT TO LER 879-032 03L-0 SUPPLEMENT TO CAUSE DESCRIPTION OF T.S.

TABLE 3.3-1 ITEM 10 WAS MET.

THE DEFECTIVE BISTABLE, MANUFACTURED BY FOXBORO-MODEL NUMBER 63U-AC-OHBA-F, WAS RE-PLACED.

THE NEW BISTABLE WAS CALIBRATED AND SET TO TRIP AT THE PROPER VALUE.

A RECHECK OF THE NEW BISTABLE TRIP SETPOINT ON SEPTEMBER 20, INDICATED THAT THIS BISTABLE WAS FUNCTIONING PROPERLY.

Cl

  • 'I

~

~

(>