ML17326A281

From kanterella
Jump to navigation Jump to search
Forwards LERs 79-031/03L-0 & 79-032/03L-0
Date released: 05/31/2018 Download: ML17326A281


LER 79-032/03L-0:on 790911,during Surveillance Test,High Pressure Reactor Trip Bistable Found to Trip at Setpoint Corresponding to 2417 Psig.Caused by Defective Bistable. Bistable Replaced
ML17326A284
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 10/10/1979
From: Rischling J
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17326A284 (4)
LER 79-031/03L-0:on 790912,elevation Containmment Airlock Interlock at 612 Ft Did Not Prevent Opening of Outer Door W/Inner Door Open.Caused by Flexing of One Interlock Support Bracket.Gusset Added to Bracket
ML17326A282
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 10/10/1979
From: Michael Brown
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17326A282 (2)
Forwards LERs 79-031/03L-0 & 79-032/03L-0
ML17326A280
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 10/10/1979
From: Shaller D
INDIANA MICHIGAN POWER CO.
To: KEPPLER L G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17326A280 (1)