ML18086A257
| ML18086A257 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 02/03/1981 |
| From: | Galen Smith NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Schneider F Public Service Enterprise Group |
| Shared Package | |
| ML18086A255 | List: |
| References | |
| NUDOCS 8104130410 | |
| Download: ML18086A257 (2) | |
See also: IR 05000272/1980034
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I
631 PARK AVENUE
KING OF PRUSSIA, PENNSYLVANIA 19406
Docket Nos. 50-272
50-311
0 3 FEB 1981
Public Service Electric and Gas Company
ATTN:
Mr. F. W. Schneider
Vice Pre.sident - Production
80 Park Plaza - 15A
Newark, New Jersey 07101
Gentlemen:
Subject:
Inspection 50-311/80-23 and 50-272/80-34
This refers to the safety inspection conducted by J .. J. Kattan of this office on
- December 15-18, 1980 at your Salem Nuclear Generating Station, Units 1 and 2 of
activities authorized by NRC License Nos. DPR-70 an*d DPR-75 and to the discussions
of our findings held by Mr. Kattan with Mr. Driscoll and others of your staff at
the conclusi~n of the inspection, and to a subsequent telephone discussion
between Mr. Kattan of this office and Mr. T. Vannoy of your staff on December
19' 1980.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Ins.pection Report which is .enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
In addition, our Mobile Laboratory was also brought to your site and used by the
inspector to make certain independent m~asurem~nts. The basic purpose of these
independent measurements is to verify your capability for analyzing radioactive
effluents, and to a~hieve and maintain comparable methods of anal~ses between
your facility and the NRC.
The complete data from these measurements will be
reported in a subsequent Inspection Report.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, ~s set forth in the
Notice of Violation, enclosed herewith as Appendix A. *This item of noncompliance
has been categorized into the levels described in the Federal Register Notice
(45 FR*66754) dated October 7, 1980.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosures will
be placed in the NRC'*s Public Document Room.
If this report contains any
information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
\\
....
Public Service Electric and Gas Company 2
0 3 FEB 1981
withhold such information from public disclosure. Any such application must be
accompanied by an affidavit executed by the owner of the. information, which
identifies the document or part sought to be withheld, and which contains a
statement of reasons which address.es with specificity the items which wi*ll be
considered by the Commission as listed in subparagraph (b) (4) of Section 2.790.
The information sought to be withheld shall be fncorporated as far as possible
into a separate pa.rt of the affidavit. If we do not hear from you in this
regard within the specified period, the report will be placed in the Public
Document Room.
Should you have any questions concerni.ng this inspection, we will be pleased to
discuss them with you.
Enclosures:
1.
Appendix A, Notice of Violation
Sincerely,~~
Geo geA. Smith, Chief
Fu 1 Facility and Materials
S fety Branch
2.
Combined Office of Inspection and Enforcement Inspection
Report Number 50-272/80-34, 50-311/80-23*
cc w/encls:
J. T. Boettger, General Manager, Corporate Quality Assurance
E. N. Schwalje, Manager - Q*uality Assurance
_R. L. Mittl, Genera*l Manager - Licensing .and Environment
H. J. Midura, Manager - *salem Generatfog Station
R. _A. Uderitz, Ge.neral Man.ager .;. Nucle.ar Production