/01T-0:on 791003,review in Response to IE Bulletin 79-14 Indicated Three Bypass Lines & One Safety Injection Line W/Stresses in Excess of Allowable Limits.Caused by Inaccurately Installed Piping Line Supports.Mod to Be Made
ML18136A091
Person / Time
Site: Surry Dominion icon.png
Issue date: 10/17/1979
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML18136A090 List:
References
LER-79-027-01T, LER-79-27-1T, NUDOCS 7910230461
Download: ML18136A091 (2)


LER-1979-027, /01T-0:on 791003,review in Response to IE Bulletin 79-14 Indicated Three Bypass Lines & One Safety Injection Line W/Stresses in Excess of Allowable Limits.Caused by Inaccurately Installed Piping Line Supports.Mod to Be Made
Event date:
Report date:
2801979027R01 - NRC Website

text

NRC FORM 366 fZ-'!77y;.;,*

  • 4lt.1cENSEE EVENT REPORT U.S. NUCLEAR REGULATORY COMMISSION e

co NTR O L BLOCK:._I _.....___._

_..___,.___.___.! G)

(PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 1 6

[IE} I v I A I s I P I s I 1 101 ol o I - I o Io I o Io Io I - Io Io 10.)14 11 11 11 11 181 I 10

  • 7 8

9 LICENSEE CODE 14 15 LICENSE NUMBER 25 26 LICENSE TYPE 30 57 CAT 58 CON'T [iliJ 7

8

~~:~~~ W© I o I s I o I o I o I 2 I s I o 101 1 60 61 DOCKET NUMBER 68 69 I o I o I 3 I 7 I 9 I© I 11 o 11 I 7 I 7 I 9 10 74 75 REPORT DATE 80

. EVENT DATE EVENT DESCRIPTION AND PROBABLE CONSEQUENCES @

[]TI! I With both units at cold shutdown, the ongoing review in response to IE Bulletin No.

[]:I:[] I 79-14, indicated that three (3) RTD bypass lrnes and one (1) Safety [ojectjon Jioe

~

showed stresses *i-n excess of the allowable limits.

[2TIJ CIT[]

ITID fI1]J 7

8 9*

80 l2II]

7 8

SYSTEM CGDE I C!Aj@

9 10 LER/RO CEV:NTYEAR REPORT I 71 9 l NUMBER 21 22

CAUSE

CAUSE CODE SUBCODE COMPONENT CODE UJ@ ~@ IP I I I P I E I x I x 1@

11 13 18 SEQUENTIAL OCCURRENCE REPORT NO:

CODE I I I o 12 !7 J I /I I o I 1 I 23 24 26 27 28 29 COMP.

SUBCODE W

19 REPORT TYPE llJ 30 VALVE SUBCODE LLJ@

20 ACTION FUTURE EFFECT SHUTDOWN

~ ATTACHMENT NPRD-4 FORM SUB.

31 PRIME C.OMP.

SUPPLIER REVISION NO. w 32 COMPONENT MANUFACTURER TAKEN ACTION ON PLANT METHOD HOURS ~ SUBMITTED

~@L£1@ L.£J@

L.3J I Ol-,O I O j O i-Lr..l@

33 34 35 36 37 40 41 L.~J@)

W 42 I 5 I 41 2 IO I@

CAUSE DESCRIPTION AND CORRECTIVE ACTIONS @

43 OJ:I] jA deta~led analysis was initiated and modifications are being made as necessary, 1IIO

  • 7 8

9 FACILITY STATUS

% POWER OTHER STATUS ITTI] ~@- I 01 01 b!@.... ! __

NA ___

7 8

9 10 12 1'.l 44 ACTIVITY CONTENT

~

RELEASED OF RELEASE AMOUNT OF ACTIVITY ~

~GJ@~@I NA I

7 8

9 10 11 44 PERSONNEL EXPOSURES r:;;:;,.

METHOD OF

~

DISCOVERY DISCOVERY DESCRIPTIO_N '23' Li@! *Inspection

.45 46 LOCATION OF RELEASE @

NA 45 47 80 80 80 NUMBER.

~

TYPE DESCRIPTION~

ITiiJ J O I O I O JLl.J@.___ __

NA ___________________

...;.__----1

7.

8 9

11 12 13 PERSONNEL INJURIES Q

80 NUMBER DESCRIPTION~

(QI] l O j O j O l@.___N_A_* ------------------'------------'

7 8

9 11 12 80 LOSS OF OR DAMAGE TO FACILITY '43' TYPE

DESCRIPTION

'<:.::J

~

L3_J(§).....__NA ____ ~----------~------~---------'

7 8

9 10 80 PUBLICITY t::;;\\

NRC USE ONLY ISSUED DESCRIPTION~

0 t_ j J/

lili1 w@.....

1 -=NA.;__ ___________

,_-9_1_

2_ 3 _0_7_1b_~ 1.111111111, I I ~

7 8

9 10 68 69 NAME GE PBl=PABFB

\\.I. L. Stewart PHONE:

804-357-3184 so.. ;

0 n.

11

1~

Attachment (Page 1 of Surry Power Station, Unit Docket No: 50-280 1

Report No: 79-027/0lT-O Event Date:

10/3/79 Title of Event:

Excess Stress in RTD Bypass and Safety Injection Lines

1.

Description of Event

With both units at cold shutdown, the ongoing review in response to IE Bulletin No. 79-14, indicated that three (3) RTD bypass lines and (1) Safety Injection line showed stresses in excess of the allowable limits.

The event is reportable in accordance with Technical Specification 6.6.2.A.9.

2.

Probable Consequences/Status of Redundant Systems:

3.
4.

The review indicated that the subject as-built safety-related piping lines would yield stresses in excess of allowable in the event of a seismic event *. Since the unit was at cold shutdown, the health and safety of the general public were not affected.

Cause

A comparison was made of the field verified piping line configuration against the presently available design documents.

This comparison indicated that the subject piping line supports are not installed in accordance with the presently available design documents.

Immediate Corrective Action

Upon the discovery of the piping line support discrepancies, a detailed analysis was initiated and modifications are being made as necessary.

5.

Scheduled Corrective Action:

The modifications will be made prior to the* unit startup and no further action is deemed necessary.

6.

Action Taken to Prevent Recurrence:

The ongoing review will continue in response to I.E. Bulletin No. 79-14.

If during this review any modifications are identified, they will be evaluated under the requirements of the Technical Specifications.

7.

Generic Implications:

Since IE Bulletin No. 79-14 covers the seismic analysis of all safety-re-lated piping systems in the plant, there are no generic implications associated with this event.