LER-1979-036, /03L-0:on 791011,northeast Containment Spray Pump Compartment Door Found Open.Caused by Contractor Oversight. Contractors Notified & Instructions Posted Which Describe Closure Requirements |
| Event date: |
|
|---|
| Report date: |
|
|---|
| 2191979036R03 - NRC Website |
|
text
___
CONTROL BLOCK: l l
l l
l l
l (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 1 6
l N I J l 0 lC lP l 1 l@15l0 l0 l - l 0 l 0 l 0 l 0 l 0 l -l 0 l 0 l@l 4' l 1 l 1 l 1 l 1 l
l@
0 1
14 uCENSE NUMBER 25 26 LICENSE TYPE 33 57 CAT 58 7
,8 9
LICENSEE CODE CON'T l 1 'l 7 l 9 )@l 1 l 1 l0 l 6 I7 l9 l@
3$,] l L l@l 015 l o j 0 l 0 l 2 l 1 l 9 l@l1 l0 11 OI1
~
I 8
60 61 DOCKET NUMB ER 68 59 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h o
2 i
Durina normal operation, an operator discovered the northeast containment I
o 3
l spray pump compartment door open.
The operator closed the door an'd l
~
0 4
l reported it to the Group Shift Supervisor.
Since the door in the~ north-
]
o 3
l east room was the only open door, only Containment Spray System I was l
!o 6
l considered inoperable.
No other safety systems were inoperable, so l
O 17 I
safety significance is considered minimal.
]
iO 8
l l
7 8 0 80 EYSTEM
CAUSE
CAUSE COMP.
VALVE CODE CODE SUSCODE Cou'ONENT CODE SUBCODE SUBCODE lS l Al@ l A l@ l F l@ l Zl Zl Z l Z lZ lZ l@ l Z l@ l Zl@
o 9
7 8
9 10 11 12 13 18 19 20 SE QUE NTI AL OCCUR RENCE REPORT REVislON LE ReRo EVENT YE A R R EPORT NO.
CODE TYPE N O,
@,agg 1719I l-l 101316 l l-l lo 13 lt l
.l-l 10 1
_ 21 22 23 24 26 27 28 29 30 31 32 KEN A O
oN PLANT M
HOURS S B I FOR B;
$U PLI MA UFAC RER lXl@!Xl@
lZlg l Z l@
l0l0l0l0l lYl@
lY lg lZl@
lZl9l9l9l(
33 34 35 36 37 40 41 42 43 44 47 cAUSE DESCRIPTION AND CORRECTIVE ACTIONS 1
O l
Cause is attributed to contractor personnel not realizing a violation.
l i
i l
All contractors and their supervisors were notified of the plant require-t
,,7 l
ments.
Additionally, a sign will be posted at each door indicating 3
l the closure requirements.
l i
4 l
l 7
8 9 80 STA
% POWER OTHER STATUS DIS O RY DISCOVERY DESCRIPTION l@ l 0l 9 l 9 l@l NA
^
l l A l@l Operator observatson.
l 1
s E
A TIVITY Co TENT RELEASED oF RELE ASE AMOUNT OF ACTIV11Y LOCATION OF RELEASE l1 l6 l lZ l h l Zl@l NA l
l NA l
PERSONNEL EXPOS RES l 0 l 0 l 0lhlTYPEZlhl NUMBER DESCRIPT10N NA l
1 7
u ao
N;uYiEs r E RSONN E L :
oEsCRiPTiON@
NuusER li ls l l0 l0 l0l@l NA l
. 9 ii 22 f
,dnd s
.o toss or oR oAuAcE To FAciuTY Q 0
c TYPE
DESCRIPTION
v ii I eI Lz l@l "A
I
- _PUsuETv 79111605/y l 2 l n l Whl ESCRIPTION %as,,r r
uncusecyty 155U E D D
, Weekly news rel ease.
l lllllllllllll 7
8 9 10 68 69,
30 Donald A. Ross 201-455-8784 E
Jersey Central Power & Light Company hj Madison Avenue at Punch Bowl Road
"-3
'l Morristown, New Jersey 07960 (201)455-8200 OYSTER CREEK NUCLEAR GENERATING STATION Forked River, New Jersey 08731 Licensee Event Report Reportable Occurrence'No. 50-219/79-36/3L-0 Report Date November 6, 1979 Occurrence Date October 11, 1979 Identification of Occurrence Violation of the Technical Specifications, paragraph 3.4.E, when one of the containment spray pump compartment doors was discovered open.
This event is considered to be a reportable occurrence as defined in the Technical Specifications, paragraph 6.9.2.b.4.
Conditions Prior to Occurrence The plant was operating at steady state power. The major parameters at the time of occurrence were:
Power:
Reactor,1920 MWt Generator, 666 MWe Flow:
Recirculation, 15.8 x 104 gpm Feedwater 7.18 - 106 lb/hr E
Stack Gas:
2.62 x 10 pCi/sec Description of Occurrence On October 11, 1979, at approximately 4:30 p.m.,
an operator, on his tour of the reactor building, discovered the northeast containment spray pump compartment door open.
The operator immediately closed the door and dogged it shut. Then the operator reported the occurrence to the group shift super-visor.
The next working day, the contractor supervisors were made aware of
^
the violation and the requirements on securing the doors properly.
Apparent Cause of Occurrence Contractor personnel failed to recognize a violation of the Technical Specifi-cations.
7'6 241 Jersey Central Power & Lght Company is a Member of the General Pubhc Utilities System
o Reportable Occurrence No. 50-219/79-26/3L-0 Page 2 November 6, 1979 Analysis of Occurrence The Containment Spray Cooling System consists of two independent cooling loops, each capable of removing fission product decay heat from the primary containment.
Since the door in the northeast room was the only open door, by definition, Containment Spray System I was to be considered inoperable.
No other safety systems were inoperable; hence, the Emergency Cooling System would have performed its design function.
Corrective Action
All contractors and their supervisors have been notified of plant requirements.
Additionally, a sign will be posted at each door indicating the door must be closed and dogged at all times except for passage.
On a similar reportable occurrence (50-219/79-34/1T-0), door closing requirements were incorporated into the site's indoctrination course.
Failure Data Reportable Occurrence No. 50-219/79-34/1T-0.
'~6 242
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000219/LER-1979-001-03, /03L-0 on 790118:valve V-14-35 Failed to Open Completely During Routine Isolation Condenser Valve Operability Test.Caused by Dirty Torque Limit Switch Contacts,Which Were Subsequently Cleaned & Burnished | /03L-0 on 790118:valve V-14-35 Failed to Open Completely During Routine Isolation Condenser Valve Operability Test.Caused by Dirty Torque Limit Switch Contacts,Which Were Subsequently Cleaned & Burnished | | | 05000219/LER-1979-001, Forwards LER 79-001/03L-0 | Forwards LER 79-001/03L-0 | | | 05000219/LER-1979-002, Forwards LER 79-002/03L-0 | Forwards LER 79-002/03L-0 | | | 05000219/LER-1979-002-03, /03L-0 on 790206:while Performing Isolation Condenser Automatic Actuation Test & calibr,RE-15B Trip Point Was Less Conservative than Tech Spec Std.Caused by RE-15B Switch Not Set at 1068 Psig valve.RE-15B Reset | /03L-0 on 790206:while Performing Isolation Condenser Automatic Actuation Test & calibr,RE-15B Trip Point Was Less Conservative than Tech Spec Std.Caused by RE-15B Switch Not Set at 1068 Psig valve.RE-15B Reset | | | 05000219/LER-1979-010-03, /03L-0 on 790417:leak of Isotopic Concentration Noticed Near Inside Penetration within Pipe Tunnel.Caused by Component Failure.Drywell Equipment Drain Tank Line Rerouted to Prevent Further Leakage | /03L-0 on 790417:leak of Isotopic Concentration Noticed Near Inside Penetration within Pipe Tunnel.Caused by Component Failure.Drywell Equipment Drain Tank Line Rerouted to Prevent Further Leakage | | | 05000219/LER-1979-010, Forwards LER 79-010/03L-0 | Forwards LER 79-010/03L-0 | | | 05000219/LER-1979-011-03, /03L-0 on 790419:core Spray Pump NZO1A in Sys 1 Failed to Start Upon Initiation Signal.Caused by Fuse Failure.Fuse Replaced & Pump Test Successfully Completed | /03L-0 on 790419:core Spray Pump NZO1A in Sys 1 Failed to Start Upon Initiation Signal.Caused by Fuse Failure.Fuse Replaced & Pump Test Successfully Completed | | | 05000219/LER-1979-011, Forwards LER 79-011/03L-0 | Forwards LER 79-011/03L-0 | | | 05000219/LER-1979-012-03, /03L-0 on 790419:oxygen Level in Suppression Chamber Atmosphere Was Greater than 5%.Caused by Sensitivity of Sampling Sys & Position of Sample Flow Control Valve. Oxygen Analyzer Recalibr;Level Now Below 5% | /03L-0 on 790419:oxygen Level in Suppression Chamber Atmosphere Was Greater than 5%.Caused by Sensitivity of Sampling Sys & Position of Sample Flow Control Valve. Oxygen Analyzer Recalibr;Level Now Below 5% | | | 05000219/LER-1979-012, Forwards LER 79-012/03L-0 | Forwards LER 79-012/03L-0 | | | 05000219/LER-1979-016, Forwards LER 79-016/03L-0 | Forwards LER 79-016/03L-0 | | | 05000219/LER-1979-016-03, /03L-0 on 790506:during Surveillance Test, Isolator Condenser Isolation Sensor Setpoint a Measured Two Inches of Excess Water.Caused by Instrument Drift in Excess of Design Accuracy.Switch Was Recalibr & Put Back in Svc | /03L-0 on 790506:during Surveillance Test, Isolator Condenser Isolation Sensor Setpoint a Measured Two Inches of Excess Water.Caused by Instrument Drift in Excess of Design Accuracy.Switch Was Recalibr & Put Back in Svc | | | 05000219/LER-1979-017, Forwards LER 79-017/03L-0 | Forwards LER 79-017/03L-0 | | | 05000219/LER-1979-017-03, /03L-0 on 790517:during Routine Surveillance of Core Spray Sys Ii,Parallel Isolation Valve V-20-21 Failed to Operate.Caused by Circuit Breaker Contacts Making Poor Contact in B Phase,Creating Overcurrent.Part Replaced | /03L-0 on 790517:during Routine Surveillance of Core Spray Sys Ii,Parallel Isolation Valve V-20-21 Failed to Operate.Caused by Circuit Breaker Contacts Making Poor Contact in B Phase,Creating Overcurrent.Part Replaced | | | 05000219/LER-1979-018, Forwards LER 79-018/03L-0 | Forwards LER 79-018/03L-0 | | | 05000219/LER-1979-018-03, /03L-0 on 790517:snubber 51/21,core Spray Sys II, Had Signs of Grease on Alemite Fitting on Accumulator.Cause Unknown But Appears Related to Rigorous Svc Conditions. Snubber Replaced | /03L-0 on 790517:snubber 51/21,core Spray Sys II, Had Signs of Grease on Alemite Fitting on Accumulator.Cause Unknown But Appears Related to Rigorous Svc Conditions. Snubber Replaced | | | 05000219/LER-1979-019-03, /03L-0 on 790526:reactor High Pressure Isolation Condenser Initiation Switch RE-15A Tripped at 3 Psig Greater than Specified.Caused by Instrument repeatability.RE-158 Reset to Trip at 1,068 Psig | /03L-0 on 790526:reactor High Pressure Isolation Condenser Initiation Switch RE-15A Tripped at 3 Psig Greater than Specified.Caused by Instrument repeatability.RE-158 Reset to Trip at 1,068 Psig | | | 05000219/LER-1979-019, Forwards LER 79-019/03L-0 | Forwards LER 79-019/03L-0 | | | 05000219/LER-1979-020, Forwards LER 79-020/01T-0 | Forwards LER 79-020/01T-0 | | | 05000219/LER-1979-020-01, /01T-0 on 790613:secondary Containment Integrity Breached When Reactor Bldg Airlock Doors Were Opened Simultaneously.Caused by Failure of Procedure to State Correct Method for Securing Airlock Doors.Procedure Revised | /01T-0 on 790613:secondary Containment Integrity Breached When Reactor Bldg Airlock Doors Were Opened Simultaneously.Caused by Failure of Procedure to State Correct Method for Securing Airlock Doors.Procedure Revised | | | 05000219/LER-1979-021-03, /03L-0 on 790620:during Surveillance Testing Activities,Instrument 1P15A Was Found to Trip at Valve Higher than Allowed by Tech Specs.Instrument Found to Be within Expected Accuracy Attainable | /03L-0 on 790620:during Surveillance Testing Activities,Instrument 1P15A Was Found to Trip at Valve Higher than Allowed by Tech Specs.Instrument Found to Be within Expected Accuracy Attainable | | | 05000219/LER-1979-021, Forwards LER 79-021/03L-0 | Forwards LER 79-021/03L-0 | | | 05000219/LER-1979-022, Forwards LER 79-022/03L-0 | Forwards LER 79-022/03L-0 | | | 05000219/LER-1979-022-03, /03L-0 on 790627:leak Detected on Emergency Svc Water Side of Containment Spray Heat Exchanger 1-2.Caused by Leaking Nipple Connection Between Water Box & Piping to Valve V-3-83,due to Corrosion.Nipple Replaced | /03L-0 on 790627:leak Detected on Emergency Svc Water Side of Containment Spray Heat Exchanger 1-2.Caused by Leaking Nipple Connection Between Water Box & Piping to Valve V-3-83,due to Corrosion.Nipple Replaced | | | 05000219/LER-1979-023-01, /01T-0 on 790719:reactor Power Was Reduced Above Value for Removal of a Feedwater String.Caused by Removal of Recirculating Pump Reactor for Maint.Inboard & Outboard Collector Rings Resurfaced & Pump Returned to Svc | /01T-0 on 790719:reactor Power Was Reduced Above Value for Removal of a Feedwater String.Caused by Removal of Recirculating Pump Reactor for Maint.Inboard & Outboard Collector Rings Resurfaced & Pump Returned to Svc | | | 05000219/LER-1979-023, Forwards LER 79-023/01T-0 | Forwards LER 79-023/01T-0 | | | 05000219/LER-1979-024, Forwards LER 79-024/03L-0 | Forwards LER 79-024/03L-0 | | | 05000219/LER-1979-024-03, /03L-0:on 790730,control Rod Drive Pump a Discovered Spraying Water Through Seal.Caused by Failure of Mechanical Seal.Inboard Mechanical Seal & Inboard Bearing Replaced | /03L-0:on 790730,control Rod Drive Pump a Discovered Spraying Water Through Seal.Caused by Failure of Mechanical Seal.Inboard Mechanical Seal & Inboard Bearing Replaced | | | 05000219/LER-1979-025, Forwards LER 79-025/03L-0 | Forwards LER 79-025/03L-0 | | | 05000219/LER-1979-025-03, /03L-0:on 790806,10,000 Gallons of Torus Water Drained & Ability of Primary Containment Degraded.Caused by Isolation Valve Left Open After Water Samplings.Change to Sampling Procedure Submitted on Use of Valve | /03L-0:on 790806,10,000 Gallons of Torus Water Drained & Ability of Primary Containment Degraded.Caused by Isolation Valve Left Open After Water Samplings.Change to Sampling Procedure Submitted on Use of Valve | | | 05000219/LER-1979-026-03, /03L-0:on 790807,while Excavating to Repair Equipment Drain Tank Line,Leak in Laundry Tank Discharge Pipe Discovered.Caused by Levels of Mn-54 & Co-60.Line Temporarily Rerouted Until Repairs Made | /03L-0:on 790807,while Excavating to Repair Equipment Drain Tank Line,Leak in Laundry Tank Discharge Pipe Discovered.Caused by Levels of Mn-54 & Co-60.Line Temporarily Rerouted Until Repairs Made | | | 05000219/LER-1979-026, Forwards LER 79-026/03L-0 | Forwards LER 79-026/03L-0 | | | 05000219/LER-1979-027, Forwards LER 79-027/01T-0 | Forwards LER 79-027/01T-0 | | | 05000219/LER-1979-027-01, /01T-0 on 790807:four Seismic restraints,NZ-2-R5 NZ-2R7,NZ-2-R8 & NZ-2-R9,in Positions Other than Required by Original Design.Caused by Improper Installation & Damage Due to Unrestrained Pipe Movement | /01T-0 on 790807:four Seismic restraints,NZ-2-R5 NZ-2R7,NZ-2-R8 & NZ-2-R9,in Positions Other than Required by Original Design.Caused by Improper Installation & Damage Due to Unrestrained Pipe Movement | | | 05000219/LER-1979-028, Forwards LER 79-028/03L-0 | Forwards LER 79-028/03L-0 | | | 05000219/LER-1979-028-03, /03L-0:on 790807,during Routine Surveillance of Core Spray Sys 1,parallel Isolation Valve V-20-15 Became Inoperable in Open Position.Caused by High Motor Current Drawn When Close Signal Inadvertently Initiated | /03L-0:on 790807,during Routine Surveillance of Core Spray Sys 1,parallel Isolation Valve V-20-15 Became Inoperable in Open Position.Caused by High Motor Current Drawn When Close Signal Inadvertently Initiated | | | 05000219/LER-1979-029, Forwards LER 79-029/03L-0 | Forwards LER 79-029/03L-0 | | | 05000219/LER-1979-029-03, /03L-0:on 790822,rod Block Trip Setting Was Below 100 Counts Per Second 26 Times During QA Audit.Caused by Calibr Procedure Setting Rod Trip at Tech Spec Limit.Rod Withdrawal Block Setpoint Increased | /03L-0:on 790822,rod Block Trip Setting Was Below 100 Counts Per Second 26 Times During QA Audit.Caused by Calibr Procedure Setting Rod Trip at Tech Spec Limit.Rod Withdrawal Block Setpoint Increased | | | 05000219/LER-1979-030, Revised Attachment to LER 79-030/03L-0:on 790812,control Rod Drive Pump a Removed from Svc for Repair of Pump Vent Piping.Piping Cracked at Bushing at Entry to Pump Casing. Caused by Operator Carelessness.Bushing Replaced | Revised Attachment to LER 79-030/03L-0:on 790812,control Rod Drive Pump a Removed from Svc for Repair of Pump Vent Piping.Piping Cracked at Bushing at Entry to Pump Casing. Caused by Operator Carelessness.Bushing Replaced | | | 05000219/LER-1979-030-03, /03L-0:on 790812,control Rod Drive Pump Removed from Svc Due to Excessive Leakage from Pump Vent Piping. Piping Was Cracked at Bushing.Caused by Use of Vent Line as Operator Foot Support.Bushing & Pipe Nipple Replaced | /03L-0:on 790812,control Rod Drive Pump Removed from Svc Due to Excessive Leakage from Pump Vent Piping. Piping Was Cracked at Bushing.Caused by Use of Vent Line as Operator Foot Support.Bushing & Pipe Nipple Replaced | | | 05000219/LER-1979-031, Forwards LER 79-031/03L-0 | Forwards LER 79-031/03L-0 | | | 05000219/LER-1979-031-03, /03L-0:on 790829,seal Water Piping Found Cracked on Short Pipe Nipple Section Where Threaded Into Seal Cartridge.Caused by Operator Using half-inch Piping as Foot Support.Pipe Nipple Replaced | /03L-0:on 790829,seal Water Piping Found Cracked on Short Pipe Nipple Section Where Threaded Into Seal Cartridge.Caused by Operator Using half-inch Piping as Foot Support.Pipe Nipple Replaced | | | 05000219/LER-1979-032, Forwards LER 79-032/03L-0 | Forwards LER 79-032/03L-0 | | | 05000219/LER-1979-032-03, /03L-0:on 790914,leaks Discovered in Both Containment Spray Sys.Caused by Corrosion Accelerated by Galvanic Action.Matl Change in Nipple Recommended | /03L-0:on 790914,leaks Discovered in Both Containment Spray Sys.Caused by Corrosion Accelerated by Galvanic Action.Matl Change in Nipple Recommended | | | 05000219/LER-1979-033, Forwards LER 79-033/03L-0 | Forwards LER 79-033/03L-0 | | | 05000219/LER-1979-033-03, /03L-0:on 790917,electromatic Relief Valve Pressure Switch 1A83A Tripped at Pressure in Excess of Limit.Caused by Defective High Pressure Microswitch. Replacement Switch Installed | /03L-0:on 790917,electromatic Relief Valve Pressure Switch 1A83A Tripped at Pressure in Excess of Limit.Caused by Defective High Pressure Microswitch. Replacement Switch Installed | | | 05000219/LER-1979-034, Forwards LER 79-034/01T-0 | Forwards LER 79-034/01T-0 | | | 05000219/LER-1979-034-01, /01T-0:on 791008,both Personnel Access Air Lock 15ors of Reactor Bldg Were Simultaneoulsy Open.Caused by Contractor Personnel Disconnecting Automatic Closing Device on One Door.Device Reconnected | /01T-0:on 791008,both Personnel Access Air Lock 15ors of Reactor Bldg Were Simultaneoulsy Open.Caused by Contractor Personnel Disconnecting Automatic Closing Device on One Door.Device Reconnected | | | 05000219/LER-1979-035, Forwards LER 79-035/03L-0 | Forwards LER 79-035/03L-0 | | | 05000219/LER-1979-035-03, /03L-0:on 790926,during Normal Operation,Reading on Main Steam Line Radiation Monitor Lower than Other Three Monitors.Caused by Drift of Zero Setpoint of Amplifier in Monitor.Setpoint Reset to Zero | /03L-0:on 790926,during Normal Operation,Reading on Main Steam Line Radiation Monitor Lower than Other Three Monitors.Caused by Drift of Zero Setpoint of Amplifier in Monitor.Setpoint Reset to Zero | |
|