Forwards IE Insp Repts 50-340/79-14 & 50-364/79-06 on 790327-29 & Notice of Violation
ML19270G971
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 04/11/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Clayton F
ALABAMA POWER CO.
Shared Package
ML19270G966 List:
References
NUDOCS 7906220248
Download: ML19270G971 (2)


See also: IR 05000340/1979014

Text

.

.

?

UtilTED STATES

[g*"4g

NUCLE AR REGULATORY COMMISSION

,

f,,

REGloN il

O

o

h

$

101 M ARIETT A STREET, N.W.

8

ATLANTA. GEORGI A 30303

...../

APR 111979

In Reply Refer To:

RII:MDH

50-348/79-14

50-364/79-6

Alabama Power Company

ATTN:

F. L. Clayton, Jr.

Senior Vice President

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

This refers to the inspection conducted by M. D. Hunt of this office on

March 27-29, 1979, of activities authorized by NRC License No. NPF-2 and

Construction Permit No. CPPR-86 for the Joseph M. Farley Nuclear Plant

facility, and to the discussion of our findings held with J. A. Mooney at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

During the inspectien, it was found that certain activities under your

license appear to be in noncompliance with NRC requirements.

This item and

references to pertinent requirements are listed in the Notice of Violation

enclosed herewith as Appendix A.

This notice is sent to you pursuant to the

provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10,

Code of Federal Regulations.

Section 2.201 requires you to submit to this

office, within 20 days of your receipt of this notice, a written statement or

explanation in reply including:

(1) corrective steps which have been taken

by you and the results achieved; (2) corrective steps which will be taken to

,

avoid further noncompliance; and (3) the date when full compliance will be

achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any inforsktion that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20

days to this of fice to withhold such information f rom public disclosure.

Any

such application must include a full statement of the reasons on the basis of

which it is claimed that the information is proprietary, and should be prepared

so that proprietary information identified in the application is centained in

a separate part of the document.

If we do not hear from you in this regard

within the specified period, the report will be placed in the Public Document

Room.

7906220248

.

.

APR 11879

.

Alabama Power Company

-2-

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

h

'

.-

Charles E. Marphy, Chief

Reactor Construction and Engineering

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-348/79-14

and 50-364/79-6

cc w/ enc 1:

A. R. Barton

Executive Vice President

P. O. Box 2641

Birmingham, AL 35291

H. O. Thrash

Manager-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

C. Biddinger, Jr.

Manager-Corporate Quality Assurance

2348

2,80

P. O. Box 2641

Birmingham, AL 35291

W. G. Hairston, III

Plant Manager

Drawer 470

Ashford, AL 36312

R. E. Hollands, Jr.

QA Supervisor