05000324/LER-1980-043-03, /03L-0:on 800507,during Current Refueling Outage, Standby Gas Treatment Operability Test Was Not Performed by Required 800425 Date.Caused by Administrative Oversight. Satisfactorily Performed on 800507

From kanterella
Revision as of 19:07, 31 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
/03L-0:on 800507,during Current Refueling Outage, Standby Gas Treatment Operability Test Was Not Performed by Required 800425 Date.Caused by Administrative Oversight. Satisfactorily Performed on 800507
ML19323G984
Person / Time
Site: Brunswick 
Issue date: 06/03/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19323G980 List:
References
LER-80-043-03L-01, LER-80-43-3L-1, NUDOCS 8006090355
Download: ML19323G984 (1)


LER-1980-043, /03L-0:on 800507,during Current Refueling Outage, Standby Gas Treatment Operability Test Was Not Performed by Required 800425 Date.Caused by Administrative Oversight. Satisfactorily Performed on 800507
Event date:
Report date:
3241980043R03 - NRC Website

text

NRC fos;Y 366 U.S. NUCLEAR REGULATCRY COMMISSION (7 J7)

LICENSEE EVENT REPORT CONTROL BLOCC l l

l l

l l lh (PLEASE PRINT OR TYPE ALL REQutRED INFORMATION)

@ l N I C l B l E l P l 2 l@l 0 l 0 l - l 0 l 0 l 0 l 0 l 0 l-l 0 l 0 l@l 4 l1 l1 l1 l 1 l@l I

j@

3 8 3 LICENSEE CODE 14 15 LICENSE NUM8ER 25 26 LICENSE TYPE JO

$7 CAT 95 CON T M

[RcE l L @l 0l 5 l 0 l - l 0 l 3 l 214 @l 0 l 5 l 0 l 7 l 8 l0 ]@l016 l0 l 31810 l@

7 8

60 63 OOCKET NUMBER 68 69 EVENT DATE 74 75 REPORT OATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h IOI2l l During the current refueling outage, PT 15.6, Standby Gas Treatment operability l

Test, was not performed by the required'date of April 25, 1980. This event did l

,oi3; ;

g; not affect the health or safety of the public.

l I

15.J l I

CL.i]l 10171 I I

Technical Specification 6.9.1.9c l

go,g, ;

^"

'NI'E TOdE St 8C$0E COMPONENT CODE SUS OO'E S

E R

l Sl Cl@ l A l@ l A l@ l Fl Il Ll Tl-E} Rlh l Z l@ l Z l@

7 8

9 to 11 12 13 18 19 20 SEQUENTIAL OCCUR RE NCE R,EPORT REVISION LER Bo

, EVENT YE AR

. REPORT NO.

CODE TYPE No.

i h,REgg l218 l0 l,,

g,,

l 0[ 4l' 3l l/l l0l3l lL l

[ -j l0l 22 23 24 26 27 28 29 30 31 32 K N AC O ON PLA T M

MOURS 22 S8 :

POR h 8.

SUPPLIE

  • MANUF CTURER l H [gl34Zl@

lZl@

lZ l@

l0l0l0l0l l N]@

lNl@

lZl@

lZl9l9l9l@ '

33 35 36 37 40 48 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h

,, ;o; j The PT was not performed due to an administrative oversight.

It was satisfactorily l 3,

l performed on May 7, 1980. The administrative system for performing surveillance l

tests was reviewed and is considered a'dequate. This event appears to be an isolated l

~

g All Operations personnel responsible for performing or reviewing Operations l event.

,, g surveillances were reminded to exercise care.in a memo from the Manager - Operations.l 7

8 9 90 STA $

% POWER oTHER STATUS DIS RY OfSCOVERY DESCRIPTION lHlg l0l0l0]gl N/A l

lA[gl Technician Surveillance l

i s ACTivlTY CO TENT AMOUNT OF ACTIVITY LOCATION OF RELE ASE RELEASE @O OF RELEASE @l N/A l

l N/A l

1 6 7

8 9 10 11 44 46 80 PERSONNEL EXPOSURES NUMBE R TYPE

DESCRIPTION

l0l0l0l@ W @l N/A l

1 7 IES PERSONNE L INJU DESCRiPTiONh NuMsER l0l0l0l@l N/A l

i a 7

8 9 11 12 80 LOSS OF OR OAMAGE TO PACILITV TYPE

DESCRIPTION

lZl@l N/A l

i 9 7

8 9 to 80 M6090 ISSUE @ DESCRIPTION iNi l

N/A l

llllllllll lll}

2 o l

8 9 10 68 69

80. E A. C. TollisontJr..

m

@g M gp-pggg 1

t