ML111250429
From kanterella
Revision as of 01:37, 4 March 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML111250429 | |
Person / Time | |
---|---|
Site: | South Texas |
Issue date: | 04/26/2011 |
From: | Aguilera R A South Texas |
To: | Office of Nuclear Reactor Regulation |
References | |
NOC-AE-1 1002668 | |
Download: ML111250429 (76) | |
Similar Documents at South Texas | |
---|---|
Category:Graphics incl Charts and Tables
MONTHYEARML22033A5442022-02-0202 February 2022
[Table view]Inservice Inspection Summary Report -1RE23 ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML13323B2092013-10-0404 October 2013 Attachment 12: CHLE-020, Rev. 2, Test Results for a 10-day Chemical Effects Test Simulating LBLOCA Conditions (T5). ML13323B2082013-09-23023 September 2013 Attachment 11: CHLE-019, Rev. 2, Test Results for Chemical Effect Tests Stimulating Corrosion and Precipitation (T3 & T4) ML13323B2072013-09-16016 September 2013 Attachment 10: CHLE-018, Rev. 2, Results of Bench Tests to Assess Corrosion of Aluminum in STP Containment Conditions. ML13323B2042013-01-22022 January 2013 Attachment 9: CHLE-016, Rev. 2, Calculated Material Release to Estimate Chemical Effects. ML13323B2012013-01-22022 January 2013 Attachment 7: CHLE-014, Rev. 2, T2 LBLOCA Test Report. ML13323B2022013-01-15015 January 2013 Attachment 8: CHLE-015, Rev. 3, Summary of Chemical Effects Testing in 2012 for STP GSI-191 License Submittal. ML13323B2002013-01-0909 January 2013 Attachment 6: CHLE-012, Rev. 3, T1 Mbloca Test Report, Figure 53 Through End ML13323B1992013-01-0909 January 2013 Attachment 6: CHLE-012, Rev. 3, T1 Mbloca Test Report, Cover Through Figure 52 ML13323B1982012-08-19019 August 2012 Attachment 5: CHLE-010, Rev. 2, Chle Tank Test Results for Blended and NEI Fiber Beds with Aluminum Addition. ML13323B1912012-08-14014 August 2012 Attachment 2: CHLE-006, Rev. 1, STP Material Calculations. NOC-AE-13003040, Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test.2012-08-13013 August 2012 Attachment 1: CHLE-005, Rev. 1, Determination of the Initial Pool Chemistry for the Chle Test. ML13323B1942012-08-11011 August 2012 Attachment 3: CHLE-007, Rev. 3, Debris Bed Requirements and Preparation Procedures. ML13323B1962012-06-12012 June 2012 Attachment 4: CHLE-008, Rev. 3, Debris Bed Preparation and Formation Test Results. ML1118904202011-07-0606 July 2011 Licensee Slide from 7/7/11 Meeting with STP Nuclear ML11157A0102011-06-0202 June 2011 STP Nuclear Operating Company, Licensee Handouts, 6/2/2011 Meeting Risk-Informed GSI-191 Closure Plan for GSI-191 Resolution ML1112504292011-04-26026 April 2011 Annual Environmental and Annual Radiological Environmental Operating Reports, Part 2 of 2 ML1019004182010-06-28028 June 2010 Quick View Chart ML1005413692010-01-0505 January 2010 TS Pages from Licensee ML0930200982009-10-29029 October 2009 Summary of Meeting with STP Nuclear Operating Company, Licensee for South Texas Project, Units 1 and 2, to Discuss Experience with Implementation of Risk-Managed Technical Specification Pilot Amendment (Initiative 4b) and Other Initiatives ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists NOC-AE-06001960, Inservice Inspection Summary Report2006-01-19019 January 2006 Inservice Inspection Summary Report ML0426502472004-09-13013 September 2004 One Page from 033004 Open Items Table Riv Fire Protection ML0426100732004-09-13013 September 2004 One Page from the Open Items Table CY-02-012, Project Response to AIF Generator Survey2002-02-28028 February 2002 Project Response to AIF Generator Survey 2022-02-02 Category:Periodic Monitoring Report (Radiological/Environmental) MONTHYEARML22116A2512022-04-26026 April 2022
[Table view]2021 Radioactive Effluent Release Report NOC-AE-21003800, Radioactive Effluent Release Report2021-04-19019 April 2021 Radioactive Effluent Release Report ML21110A1532021-04-19019 April 2021 Radioactive Effluent Release Report ML12130A2662012-04-30030 April 2012 Annual Environmental and Annual Radiological Environmental Operating Reports - Cover Through Chapter 5 ML12130A2672012-04-30030 April 2012 Annual Environmental and Annual Radiological Environmental Operating Reports - Chapter 6 Through End NOC-AE-12002850, Submittal of Radioactive Effluent Release Report for the Year 20112012-04-26026 April 2012 Submittal of Radioactive Effluent Release Report for the Year 2011 ML1112504292011-04-26026 April 2011 Annual Environmental and Annual Radiological Environmental Operating Reports, Part 2 of 2 NOC-AE-11002668, Annual Environmental and Annual Radiological Environmental Operating Reports, Part 1 of 22011-04-26026 April 2011 Annual Environmental and Annual Radiological Environmental Operating Reports, Part 1 of 2 NOC-AE-09002422, Radioactive Effluent Release Report for 20082009-04-23023 April 2009 Radioactive Effluent Release Report for 2008 2022-04-26 Category:Photograph MONTHYEARML17173A1392017-06-0909 June 2017
[Table view]Engine Systems, Inc. - Transmittal of 10CFR21 Reporting of Defects and Non-Compliance - Report No. 10CFR21-0117, Rev. 0 ML15183A0092015-04-0202 April 2015 Photos, Audit Summary, 3/31 to 4/2/15 Audit of Systems, Structures and Equipment at STP Facility; Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 ML13323B2072013-09-16016 September 2013 Attachment 10: CHLE-018, Rev. 2, Results of Bench Tests to Assess Corrosion of Aluminum in STP Containment Conditions. ML13323B2012013-01-22022 January 2013 Attachment 7: CHLE-014, Rev. 2, T2 LBLOCA Test Report. ML13323B2022013-01-15015 January 2013 Attachment 8: CHLE-015, Rev. 3, Summary of Chemical Effects Testing in 2012 for STP GSI-191 License Submittal. ML13323B2002013-01-0909 January 2013 Attachment 6: CHLE-012, Rev. 3, T1 Mbloca Test Report, Figure 53 Through End ML13323B1992013-01-0909 January 2013 Attachment 6: CHLE-012, Rev. 3, T1 Mbloca Test Report, Cover Through Figure 52 ML13323B1982012-08-19019 August 2012 Attachment 5: CHLE-010, Rev. 2, Chle Tank Test Results for Blended and NEI Fiber Beds with Aluminum Addition. ML13323B1942012-08-11011 August 2012 Attachment 3: CHLE-007, Rev. 3, Debris Bed Requirements and Preparation Procedures. ML1112504292011-04-26026 April 2011 Annual Environmental and Annual Radiological Environmental Operating Reports, Part 2 of 2 NOC-AE-11002668, Annual Environmental and Annual Radiological Environmental Operating Reports, Part 1 of 22011-04-26026 April 2011 Annual Environmental and Annual Radiological Environmental Operating Reports, Part 1 of 2 ML0407701682004-04-15015 April 2004 Draft Information Input Photos-Attachment 9 2017-06-09 |
Retrieved from "https://kanterella.com/w/index.php?title=ML111250429&oldid=469479"