Revised Monthly Operating Rept for May 1981
ML20003A356
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/22/1981
From: Sarsour B
TOLEDO EDISON CO.
To:
Shared Package
ML20003A329 List:
References
NUDOCS 8102030549
Download: ML20003A356 (1)


Text

.

l i

Rev. 1 - 1/22/81 OPERATING DATA REPORT DOCKET NO.. _ 50-346 DATE _ June 9, 1980 COMPLETED BY Bilal Sarsour TELEPHONE (419) D9-5000

- Ext. 251 OPERATING STATUS Not'5 Davis-Besse Unit 1

1. Unit Name:

May, 1080

2. Reporting Period:

2772

3. Licensed Thermal Power (MWt):

925

4. Nameptare Rating (Gross MWe):

906

5. Design Electrical Rating (Net MWe):

934

6. Maximum Dependable Capacity (Gross MWep:

890

  • 7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report.Give Reasons:
9. Power Level To Which Restricted,If Any (Net MWe):
10. Reasons For Restrictions,If Any:

This Month Yr.-to-Date Cumulative 744 3,647

12. Number Of flours Reactor Was Critical 0

2,078

_ 24,172

11. Hours in Reporting Period 13,042 0

0 2,875.8

13. Reactor Reserve Shutdown Hours 1l 0

2,008.7 11.881.0

14. Hours Generator On-Line 0

0

1.. 2 8
15. Unit Resene Shutdown Hours 0

4,687,305 24.886.812

16. Gross Thermal Energy Generated (MWH) 0 1.583.559 8.307.070
17. Gross Electrical Energy Generated (MWil) 0 1,483,787 7,654,365
18. Net Electrical Energy Generated (MWH) 0 55.1 50.4
19. Unit Service Factor 0

55.1 58.2

20. Unit Availability Factor 0

45.7 38.3

21. Unit Capacity Factor (Using MDC Net) 0 44.9 37.6
22. Unit Capacity Factor (Using DER Net) 0 14.3 25.6
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each):

August 1, 1980

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status tPrior to Commercial Operation):

Forecast Achiesed INITIAL CRITICALITY INITIAL ELECTRICITY COM51ERCI A L OPERATION (9/77) 810 203 054j

. -