ML12340A275
From kanterella
Revision as of 12:16, 2 March 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML12340A275 | |
Person / Time | |
---|---|
Site: | Cooper |
Issue date: | 11/27/2012 |
From: | Zachry Nuclear |
To: | Nebraska Public Power District (NPPD), Office of Nuclear Reactor Regulation |
References | |
CR-CNS-2012-06126 12-E18, Rev 0 | |
Download: ML12340A275 (354) | |
Similar Documents at Cooper | |
---|---|
Category:Report
MONTHYEARNLS2024065, 10 CFR 50.59(d)(2) and 10 CFR 72.48(d)(2) Summary Report2024-10-0707 October 2024
[Table view]10 CFR 50.59(d)(2) and 10 CFR 72.48(d)(2) Summary Report NLS2024055, Data from Metamic Coupon Sampling Program2024-07-29029 July 2024 Data from Metamic Coupon Sampling Program ML23129A2792023-04-20020 April 2023 1 to Updated Safety Analysis Report, Plant Unique Analysis Report Mark I Containment Program NLS2023010, Inservice Inspection OAR-1 Owners Activity Report for Cooper Nuclear Station2023-02-0909 February 2023 Inservice Inspection OAR-1 Owners Activity Report for Cooper Nuclear Station NLS2023005, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 20222023-01-19019 January 2023 Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2022 NLS2022050, Notification of Revision to Cooper Nuclear Station Emergency Response Data System Data Point Library2022-11-0909 November 2022 Notification of Revision to Cooper Nuclear Station Emergency Response Data System Data Point Library NLS2022042, 10 CFR 50.59(d)(2) and 10 CFR 72.48(d)(2) Summary Report2022-10-0707 October 2022 10 CFR 50.59(d)(2) and 10 CFR 72.48(d)(2) Summary Report NLS2022003, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 20212022-01-20020 January 2022 Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2021 ML19262G9042019-11-0808 November 2019 Staff Assessment of Flood Hazard Integrated Assessment (Public) NLS2019040, 3-EN-DC-147, Rev. 5C1, Cooper Nuclear Station Pressure and Temperature Limits Report (PTLR) for 54 Effective Full-Power Years (Efpy). (Non-proprietary)2019-08-0707 August 2019 3-EN-DC-147, Rev. 5C1, Cooper Nuclear Station Pressure and Temperature Limits Report (PTLR) for 54 Effective Full-Power Years (Efpy). (Non-proprietary) NLS2019028, Enclosure 2 - Calculation Package, File No. 1801303.301, Cooper Nuclear Station Core Shroud H3 Weld Evaluation - 2018, Revision 02018-10-24024 October 2018 Enclosure 2 - Calculation Package, File No. 1801303.301, Cooper Nuclear Station Core Shroud H3 Weld Evaluation - 2018, Revision 0 ML18184A2732018-07-18018 July 2018 Staff Review of Mitigation Strategies Assessment Report of the Impact of the Reevaluated Seismic Hazard Developed in Response to the March 12, 2012, 50.54(f) Letter (CAC No. MF7819; EPID L-2016-JLD-0006) NLS2018024, Report 004N7680-R1-NP, Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR, Coo(Er Nuclear Station Cycle 31.2018-04-30030 April 2018 Report 004N7680-R1-NP, Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR, Coo(Er Nuclear Station Cycle 31. NLS2018003, Submittal of Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 20172018-01-15015 January 2018 Submittal of Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2017 NLS2017070, Seismic Mitigating Strategies Assessment Report for the Reevaluated Seismic Hazard Information2017-08-24024 August 2017 Seismic Mitigating Strategies Assessment Report for the Reevaluated Seismic Hazard Information ML17244A2812017-05-0808 May 2017 16C4384-RPT-005, Rev 005, 50.54(f) NTTF 2.1 Seismic High Frequency Confirmation. NLS2016070, Completion of Required Action by NRC Order EA-12-049 - Mitigation Strategies for Beyond-Design-Basis External Events2017-01-0404 January 2017 Completion of Required Action by NRC Order EA-12-049 - Mitigation Strategies for Beyond-Design-Basis External Events NLS2016066, Completion of Required Action by NRC Order EA-12-051 - Reliable Spent Fuel Pool Instrumentation2016-12-20020 December 2016 Completion of Required Action by NRC Order EA-12-051 - Reliable Spent Fuel Pool Instrumentation ML16351A2472016-12-12012 December 2016 Review of SIA Calculation 1601004.301, Cooper High Pressure RHRSW Thinning Evaluation Per Code Case N-513 ML17018A1522016-11-0101 November 2016 Pressure and Temperature Limits Report, Revision 1 NLS2016058, 10 CFR 50.59(d)(2) and 10 CFR 72.48(d)(2) Summary Report of Evaluations for 08/01/2014 - 07/31/20162016-10-0707 October 2016 10 CFR 50.59(d)(2) and 10 CFR 72.48(d)(2) Summary Report of Evaluations for 08/01/2014 - 07/31/2016 ML16351A2512016-09-15015 September 2016 SW-E-3-2851-3, Ultrasonic Thickness Measurement System. ML16351A2502016-09-13013 September 2016 SW-Z4-2851-7, Altrasonic Thickness Measurement System. NLS2016021, Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR - Cooper Nuclear Station Cycle 30 (Non-Proprietary)2016-04-21021 April 2016 Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR - Cooper Nuclear Station Cycle 30 (Non-Proprietary) ML16084A1832016-03-0202 March 2016 Er 15-019, Rev. 1, Cooper Nuclear Station Pressure and Temperature Limits Report (PTLR) for 32 Effective Full-Power Years (EFPY) (Non-Proprietary Version of Er 15-015). NLS2015128, Submittal of 10 CFR 71.95 Report Involving Energysolutions Certificate of Compliance No. 91682015-10-29029 October 2015 Submittal of 10 CFR 71.95 Report Involving Energysolutions Certificate of Compliance No. 9168 ML15259A3422015-08-24024 August 2015 10 CFR 71.95 Report Evaluation Form; Submitted by Fenok, Erwin Resin Solutions, North Anna Power Stations, Et Al NLS2015073, Er 15-019, Rev. 0, Pressure and Temperature Limits Report (PTLR) for 32 Effective Full-Power Years (EFPY) (Non-Proprietary), Enclosure 22015-08-0606 August 2015 Er 15-019, Rev. 0, Pressure and Temperature Limits Report (PTLR) for 32 Effective Full-Power Years (EFPY) (Non-Proprietary), Enclosure 2 NLS2015091, 10 CFR 71.95 Report Involving Energysolutions Certificate of Compliance No. 91682015-07-28028 July 2015 10 CFR 71.95 Report Involving Energysolutions Certificate of Compliance No. 9168 NLS2015043, Expedited Seismic Evaluation Process Report2015-04-29029 April 2015 Expedited Seismic Evaluation Process Report ML15006A2342015-02-11011 February 2015 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-13-109 (Severe Accident Capable Hardened Vents) ML17018A1532014-12-31031 December 2014 BWRVIP-135, Revision 3: BWR Vessel and Internals Project, Integrated Surveillance Program Data Source Book and Plant Evaluations NLS2016014, Er 15-019, Supplement 1, BWRVIP-135, Revision 3: BWR Vessel and Internals Project, Integrated Surveillance Program (ISP) Data Source Book and Plant Evaluations.2014-12-31031 December 2014 Er 15-019, Supplement 1, BWRVIP-135, Revision 3: BWR Vessel and Internals Project, Integrated Surveillance Program (ISP) Data Source Book and Plant Evaluations. NLS2014074, Submittal of 10 CFR 71.95 Report Involving Areva Certificate of Compliance No. 92332014-07-30030 July 2014 Submittal of 10 CFR 71.95 Report Involving Areva Certificate of Compliance No. 9233 ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 NLS2014044, and ISFSI - Thirty-Day Notification Pursuant to 10 CFR 72.212, Conditions of General License Issued Under Section 72.2102014-05-13013 May 2014 and ISFSI - Thirty-Day Notification Pursuant to 10 CFR 72.212, Conditions of General License Issued Under Section 72.210 NLS2014027, Enclosure - Seismic Hazard Evaluation and Screening Report for Cooper Nuclear Station2014-03-20020 March 2014 Enclosure - Seismic Hazard Evaluation and Screening Report for Cooper Nuclear Station ML14007A6502014-02-11011 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14037A1672014-02-10010 February 2014 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Cooper Nuclear Station, TAC No.: MF0972 NLS2012130, Problem Identification and Resolution P. 1(c) Substantive Cross-Cutting Issue2012-12-13013 December 2012 Problem Identification and Resolution P. 1(c) Substantive Cross-Cutting Issue ML12340A2752012-11-27027 November 2012 Engineering Evaluation 12-E18, Revision 0, Attachment E Through J ML12340A2732012-11-27027 November 2012 Engineering Evaluation 12-E18, Revision 0, Attachment D - Area Walk-By Checklists ML12340A2692012-11-27027 November 2012 Engineering Evaluation 12-E18, Revision 0, Attachment C - Page 76 of 322 ML12340A2682012-11-27027 November 2012 CNS Memo DED12-0003 Response to 10 CFR 50.54(f) Section 2.3 Seismic, Enclosing Engineering Evaluation 12-E18, Revision 0 NLS2012124, Enclosure to NLS2012124, Cooper Nuclear Station Flooding Walkdown Report2012-11-26026 November 2012 Enclosure to NLS2012124, Cooper Nuclear Station Flooding Walkdown Report NLS2012085, CFR 50.59(d)(2) Summary Report Covering Time Period from August 1, 2012 to July 31, 20122012-10-10010 October 2012 CFR 50.59(d)(2) Summary Report Covering Time Period from August 1, 2012 to July 31, 2012 NLS2012089, Submittal of Nuclear Material Transaction Report2012-08-29029 August 2012 Submittal of Nuclear Material Transaction Report ML1216000292012-06-11011 June 2012 Review of 60-day Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near Term Task Force Review of Fukushima Dai-ichi Accident NLS2012040, Enclosure 2, Gnf S-0000-0140-2518-R0-NP, Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR - Cooper Cycle 282012-05-30030 May 2012 Enclosure 2, Gnf S-0000-0140-2518-R0-NP, Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR - Cooper Cycle 28 NLS2012006, Nebraska Public Power District - Cooper Nuclear Station, License Amendment Request to Revise the Fire Protection Licensing Basis to NFPA 805 Per 10 CFR 50.48(c)2012-04-24024 April 2012 Nebraska Public Power District - Cooper Nuclear Station, License Amendment Request to Revise the Fire Protection Licensing Basis to NFPA 805 Per 10 CFR 50.48(c) 2024-07-29 Category:Technical MONTHYEARML23129A2792023-04-20020 April 2023
[Table view]1 to Updated Safety Analysis Report, Plant Unique Analysis Report Mark I Containment Program NLS2023010, Inservice Inspection OAR-1 Owners Activity Report for Cooper Nuclear Station2023-02-0909 February 2023 Inservice Inspection OAR-1 Owners Activity Report for Cooper Nuclear Station NLS2022050, Notification of Revision to Cooper Nuclear Station Emergency Response Data System Data Point Library2022-11-0909 November 2022 Notification of Revision to Cooper Nuclear Station Emergency Response Data System Data Point Library NLS2019040, 3-EN-DC-147, Rev. 5C1, Cooper Nuclear Station Pressure and Temperature Limits Report (PTLR) for 54 Effective Full-Power Years (Efpy). (Non-proprietary)2019-08-0707 August 2019 3-EN-DC-147, Rev. 5C1, Cooper Nuclear Station Pressure and Temperature Limits Report (PTLR) for 54 Effective Full-Power Years (Efpy). (Non-proprietary) NLS2019028, Enclosure 2 - Calculation Package, File No. 1801303.301, Cooper Nuclear Station Core Shroud H3 Weld Evaluation - 2018, Revision 02018-10-24024 October 2018 Enclosure 2 - Calculation Package, File No. 1801303.301, Cooper Nuclear Station Core Shroud H3 Weld Evaluation - 2018, Revision 0 NLS2018024, Report 004N7680-R1-NP, Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR, Coo(Er Nuclear Station Cycle 31.2018-04-30030 April 2018 Report 004N7680-R1-NP, Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR, Coo(Er Nuclear Station Cycle 31. NLS2017070, Seismic Mitigating Strategies Assessment Report for the Reevaluated Seismic Hazard Information2017-08-24024 August 2017 Seismic Mitigating Strategies Assessment Report for the Reevaluated Seismic Hazard Information ML17018A1522016-11-0101 November 2016 Pressure and Temperature Limits Report, Revision 1 ML16351A2512016-09-15015 September 2016 SW-E-3-2851-3, Ultrasonic Thickness Measurement System. ML16351A2502016-09-13013 September 2016 SW-Z4-2851-7, Altrasonic Thickness Measurement System. ML16084A1832016-03-0202 March 2016 Er 15-019, Rev. 1, Cooper Nuclear Station Pressure and Temperature Limits Report (PTLR) for 32 Effective Full-Power Years (EFPY) (Non-Proprietary Version of Er 15-015). NLS2015073, Er 15-019, Rev. 0, Pressure and Temperature Limits Report (PTLR) for 32 Effective Full-Power Years (EFPY) (Non-Proprietary), Enclosure 22015-08-0606 August 2015 Er 15-019, Rev. 0, Pressure and Temperature Limits Report (PTLR) for 32 Effective Full-Power Years (EFPY) (Non-Proprietary), Enclosure 2 NLS2015091, 10 CFR 71.95 Report Involving Energysolutions Certificate of Compliance No. 91682015-07-28028 July 2015 10 CFR 71.95 Report Involving Energysolutions Certificate of Compliance No. 9168 NLS2015043, Expedited Seismic Evaluation Process Report2015-04-29029 April 2015 Expedited Seismic Evaluation Process Report NLS2016014, Er 15-019, Supplement 1, BWRVIP-135, Revision 3: BWR Vessel and Internals Project, Integrated Surveillance Program (ISP) Data Source Book and Plant Evaluations.2014-12-31031 December 2014 Er 15-019, Supplement 1, BWRVIP-135, Revision 3: BWR Vessel and Internals Project, Integrated Surveillance Program (ISP) Data Source Book and Plant Evaluations. ML17018A1532014-12-31031 December 2014 BWRVIP-135, Revision 3: BWR Vessel and Internals Project, Integrated Surveillance Program Data Source Book and Plant Evaluations ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 NLS2014027, Enclosure - Seismic Hazard Evaluation and Screening Report for Cooper Nuclear Station2014-03-20020 March 2014 Enclosure - Seismic Hazard Evaluation and Screening Report for Cooper Nuclear Station ML14007A6502014-02-11011 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14037A1672014-02-10010 February 2014 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Cooper Nuclear Station, TAC No.: MF0972 NLS2012130, Problem Identification and Resolution P. 1(c) Substantive Cross-Cutting Issue2012-12-13013 December 2012 Problem Identification and Resolution P. 1(c) Substantive Cross-Cutting Issue ML12340A2752012-11-27027 November 2012 Engineering Evaluation 12-E18, Revision 0, Attachment E Through J ML12340A2732012-11-27027 November 2012 Engineering Evaluation 12-E18, Revision 0, Attachment D - Area Walk-By Checklists ML12340A2692012-11-27027 November 2012 Engineering Evaluation 12-E18, Revision 0, Attachment C - Page 76 of 322 ML12340A2682012-11-27027 November 2012 CNS Memo DED12-0003 Response to 10 CFR 50.54(f) Section 2.3 Seismic, Enclosing Engineering Evaluation 12-E18, Revision 0 NLS2012040, Enclosure 2, Gnf S-0000-0140-2518-R0-NP, Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR - Cooper Cycle 282012-05-30030 May 2012 Enclosure 2, Gnf S-0000-0140-2518-R0-NP, Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR - Cooper Cycle 28 NLS2012006, Nebraska Public Power District - Cooper Nuclear Station, License Amendment Request to Revise the Fire Protection Licensing Basis to NFPA 805 Per 10 CFR 50.48(c)2012-04-24024 April 2012 Nebraska Public Power District - Cooper Nuclear Station, License Amendment Request to Revise the Fire Protection Licensing Basis to NFPA 805 Per 10 CFR 50.48(c) NLS2012002, Enclosure 2 to NLS2012002, Core Plant Bolt Stress Analysis Report (Non-Proprietary)2012-01-16016 January 2012 Enclosure 2 to NLS2012002, Core Plant Bolt Stress Analysis Report (Non-Proprietary) NLS2010075, Data from Metamic Coupon Sampling Program2010-08-0202 August 2010 Data from Metamic Coupon Sampling Program ML0830302432008-09-24024 September 2008 Cooper Nuclear Station, License Renewal Application, Appendix C, Response to BWRVIP Applicant Action Items ML0821900132008-08-0707 August 2008 Monthly Operating Reports Second Quarter 2008 ML0815403772008-05-0808 May 2008 Enclosure 1 - PRA 08004, Human Error Probability for Recoveries Associated with the Fire Protection Triennial Inspection Finding Related to RHR-MO-25B ML0733005732007-11-30030 November 2007 NEDO-33385, Rev. 0, Safety Analysis Report for Cooper Nuclear Station Thermal Power Optimization, Enclosure 3 ML0722901672007-08-17017 August 2007 Final Significance Determination for a White Finding and Notice of Violation - NRC Special Inspection Report 05000298/2007007 NLS2007032, SSP-07/405-C, Rev. 1, Gardel BWR - Power Distribution Uncertainties, Enclosure 52007-05-11011 May 2007 SSP-07/405-C, Rev. 1, Gardel BWR - Power Distribution Uncertainties, Enclosure 5 ML0712403472007-05-0101 May 2007 Enclosure 2, Cooper - Offsite Dose Assessment Manual NLS2006028, Holtec Report HI-2043224, Licensing Report on the Wet Fuel Storage Capacity Expansion at Cooper Nuclear Station.2006-10-17017 October 2006 Holtec Report HI-2043224, Licensing Report on the Wet Fuel Storage Capacity Expansion at Cooper Nuclear Station. NLS2006002, License Amendment Request for a One-Time Extension of Containment Integrated Leakage Rate Test Interval2006-01-30030 January 2006 License Amendment Request for a One-Time Extension of Containment Integrated Leakage Rate Test Interval ML0628305332004-12-22022 December 2004 Root Cause Investigation, CR-CNS-2004-07409, Unexpected Service Water System Pressure Drop NLS2004128, CNS Regulatory Conference Request for Additional Information2004-10-12012 October 2004 CNS Regulatory Conference Request for Additional Information NLS2004126, Letter to NRC from Fleming, Nebraska Public Power District, Service Water Pump Test Report, Cooper2004-10-0707 October 2004 Letter to NRC from Fleming, Nebraska Public Power District, Service Water Pump Test Report, Cooper ML0619801862004-08-0505 August 2004 Johnston Pump Company - Engineering Evaluation Regarding Short Term Dry-run of Rubber Column Bearings, Report Serial Number JP04-20, Revision 2 NLS2003033, Safeguards Plan, Revision 422003-03-14014 March 2003 Safeguards Plan, Revision 42 NLS2009057, Nedc 87-131B, Revision 8, Cooper Nuclear Station, 250 Vdc Division II Load and Voltage Study.2002-11-20020 November 2002 Nedc 87-131B, Revision 8, Cooper Nuclear Station, 250 Vdc Division II Load and Voltage Study. NRC Generic Letter 1979-451979-09-25025 September 1979 NRC Generic Letter 1979-045: Transmittal of Reports Regarding Foreign Reactor Operation Experiences 2023-04-20 |
Retrieved from "https://kanterella.com/w/index.php?title=ML12340A275&oldid=443084"