ENS 40436
From kanterella
Revision as of 21:24, 1 March 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ENS Event | |
---|---|
18:00 Jan 10, 2004 | |
Title | Ts Required Shutdown at Nmp1 Due to Inoperable Msiv |
Event Description | During the performance of a normal orderly planned shutdown for maintenance a packing leak was discovered on Main Steam Inboard Isolation Valve 01-02 (01-02). Drywall inspection results revealed MSIV 01-02 operator gear housing degraded allowing grease to be lost. Engineering assessment of the condition of the limitorque operator of MSIV 01-02 is not able to provide enough information to support operability of MSIV 01-02. Declaring MSIV 01-02 inoperable. Entering T.S. 3.2.7(b and c). Action required to close one valve in the line having an inoperable valve or initiate a normal orderly shutdown with in one hour and be in cold shutdown within ten hours. Entering T.S. 3.3.4(b and c). Action required to close one valve in the line having an inoperable valve within four hours or reduce reactor coolant temperature to a value less than 215 degrees F within ten hours. Most limiting action required in current condition is 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> to be in cold shutdown. 01-02 will be closed as soon as all rods are in.
The NRC Resident Inspector was notified. |
Where | |
---|---|
Nine Mile Point New York (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown | |
Time - Person (Reporting Time:+-2.63 h-0.11 days <br />-0.0157 weeks <br />-0.0036 months <br />) | |
Opened: | Frank Payne 15:22 Jan 10, 2004 |
NRC Officer: | Rich Laura |
Last Updated: | Jan 10, 2004 |
40436 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 40436\u003C/a\u003E - \u003Ca href=\"/Nine_Mile_Point\" title=\"Nine Mile Point\"\u003ENine Mile Point\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003ETs Required Shutdown at Nmp1 Due to Inoperable Msiv\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 40436 - Nine Mile Point\n","link":"","lat":43.52021388888889,"lon":-76.40656388888888,"icon":"/w/images/b/be/Constellation_icon.png"}],"imageoverlays":null} | |
WEEKMONTHYEARENS 496772013-12-26T18:01:00026 December 2013 18:01:00
[Table view]10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Due to Blown Fuse ENS 485902012-12-13T21:30:00013 December 2012 21:30:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Due to Primary Containment System Declared Inoperable ENS 475142011-12-09T15:46:0009 December 2011 15:46:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Unidentified Rcs Leakage Greater than 2 Gpm Increase within 24 Hours ENS 471292011-08-06T07:22:0006 August 2011 07:22:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Unusual Event and Plant Shutdown Due to Drywell Unidentified Leakage Greater than 10 Gpm ENS 461442010-08-03T18:52:0003 August 2010 18:52:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Unit 1 Entered a Tech Spec Required Shutdown After Declaring Edg 102 Inoperable ENS 446352008-11-07T01:27:0007 November 2008 01:27:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Tech Spec Required Shutdown Required Due to Failed Surveillance Test ENS 432232007-03-08T19:50:0008 March 2007 19:50:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Shutdown Due to a Degraded Seal in the "a" Reactor Recirculation Pump ENS 426302006-06-11T05:26:00011 June 2006 05:26:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Shutdown Due to High Rcs Drywell Leakage ENS 409192004-08-03T23:30:0003 August 2004 23:30:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Plant Shutdown Initiated Due to Inoperable Emergency Ups Inverter ENS 407192004-05-02T06:17:0002 May 2004 06:17:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Manual Scram Due to Rising Torus Temperature Due to Stuck Open Erv ENS 405882004-03-15T15:30:00015 March 2004 15:30:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Shutdown Required by Technical Specifications Due to Inoperable Isolation Instrumentation ENS 404362004-01-10T18:00:00010 January 2004 18:00:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Ts Required Shutdown at Nmp1 Due to Inoperable Msiv ENS 402322003-10-08T14:30:0008 October 2003 14:30:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Due to Primary Coolant Boundary Leakage 2013-12-26T18:01:00 | |