Title | Shutdown Required by Technical Specifications Due to Inoperable Isolation Instrumentation |
Event Description | During the planned shutdown for RFO9, the Reactor Water Clean Up (RWCU) Differential Flow Signals and the Reject Flow indicator did not receive a signal from the transmitters associated with the reject flow path from the reactor to the condenser in the RWCU system. Maintenance was contacted and the differential flow timers associated with these control loops were removed per operating procedure N2-OP-37 for the RWCU system and the Technical Specification Required Action for both required channels of Functions 4a and 4b in table 3.3.6.1-1 being inoperable was entered. This was required to allow venting of the transmitters and prevented an inadvertent isolation signal of the RWCU system.
These primary containment isolation instruments were declared inoperable at 0830 on 3/15/2004. CONDITION B of LCO 3.3.6.1 was entered, which requires isolation capability to be restored in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. At 0930 on 3/15/04, CONDITIONS C and F were entered which require system isolation in one hour. At 1025, maintenance was completed; however, all post maintenance testing was not complete. At 1030, on 3/15/04 CONDITION F was not met and CONDITION H was entered. CONDITION H requires the unit be in MODE 3 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in MODE 4 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. Since the unit was in a planned shutdown, with negative reactivity being inserted, it was unclear whether the entry into CONDITION H of Technical Specification 3.3.6.1 would have required actual insertion of negative reactivity for this situation. Thus, as a conservative action, NMPNS is reporting this event pursuant to 50.72(b)(2)(i) 'The initiation of any nuclear plant shutdown required by Technical Specifications.' The Differential flow timers were installed at 1129 on 3/15/04 with the plant in MODE 2. Operating procedures require a CHANNEL FUNCTION TEST prior to a declaration of operability, The CHANNEL FUNCTIONAL TEST is in progress. The licensee notified the NRC Resident Inspector |
Where | |
---|---|
Nine Mile Point New York (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown | |
Time - Person (Reporting Time:+-1.28 h-0.0533 days <br />-0.00762 weeks <br />-0.00175 months <br />) | |
Opened: | Glenn Bridges 14:13 Mar 15, 2004 |
NRC Officer: | Mike Ripley |
Last Updated: | Mar 15, 2004 |
40588 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 40588\u003C/a\u003E - \u003Ca href=\"/Nine_Mile_Point\" title=\"Nine Mile Point\"\u003ENine Mile Point\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EShutdown Required by Technical Specifications Due to Inoperable Isolation Instrumentation\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 40588 - Nine Mile Point\n","link":"","lat":43.52021388888889,"lon":-76.40656388888888,"icon":"/w/images/b/be/Constellation_icon.png"}],"imageoverlays":null} | |
WEEKMONTHYEARENS 496772013-12-26T18:01:00026 December 2013 18:01:00
[Table view]10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Due to Blown Fuse ENS 485902012-12-13T21:30:00013 December 2012 21:30:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Due to Primary Containment System Declared Inoperable ENS 475142011-12-09T15:46:0009 December 2011 15:46:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Unidentified Rcs Leakage Greater than 2 Gpm Increase within 24 Hours ENS 471292011-08-06T07:22:0006 August 2011 07:22:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Unusual Event and Plant Shutdown Due to Drywell Unidentified Leakage Greater than 10 Gpm ENS 461442010-08-03T18:52:0003 August 2010 18:52:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Unit 1 Entered a Tech Spec Required Shutdown After Declaring Edg 102 Inoperable ENS 446352008-11-07T01:27:0007 November 2008 01:27:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Tech Spec Required Shutdown Required Due to Failed Surveillance Test ENS 432232007-03-08T19:50:0008 March 2007 19:50:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Shutdown Due to a Degraded Seal in the "a" Reactor Recirculation Pump ENS 426302006-06-11T05:26:00011 June 2006 05:26:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Shutdown Due to High Rcs Drywell Leakage ENS 409192004-08-03T23:30:0003 August 2004 23:30:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Plant Shutdown Initiated Due to Inoperable Emergency Ups Inverter ENS 407192004-05-02T06:17:0002 May 2004 06:17:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Manual Scram Due to Rising Torus Temperature Due to Stuck Open Erv ENS 405882004-03-15T15:30:00015 March 2004 15:30:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Shutdown Required by Technical Specifications Due to Inoperable Isolation Instrumentation ENS 404362004-01-10T18:00:00010 January 2004 18:00:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Ts Required Shutdown at Nmp1 Due to Inoperable Msiv ENS 402322003-10-08T14:30:0008 October 2003 14:30:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Due to Primary Coolant Boundary Leakage 2013-12-26T18:01:00 | |