Title | Notification of Unusual Event Declared Due to Loss of Offsite Power from a Lightning Strike |
Event Description | LaSalle Unit 1 and LaSalle Unit 2 have both experienced an automatic reactor scram, in conjunction with a loss of offsite power. This was caused by an apparent lightning strike in the main 345kV/138kV switchyard during a thunderstorm. 138kV line 0112 has been inspected in the field, and heavy damage has been noted on the insulators on two of the three phases on a line lightning arrestor line side.
The plant systems have all responded as expected. All five diesel generators started, and have loaded on to their respective buses as designed. All rods went full in on both units during the respective scrams. HPCS [High Pressure Core Spray] system was started on each unit and automatically aligned for injection for initial level control. The MSIVs [Main Steam Isolation Valves] are shut on both units with decay heat being removed via the safety relief valves. Suppression pool cooling is in progress. The licensee will notify the NRC Resident Inspector and has notified the State. Notified DHS, FEMA, USDA, HHS, DOE, NICC, EPA, and Nuclear SSA via email.
In addition to information [previously provided], LaSalle Unit 2 received a high drywell pressure signal [1.77 psig] due to loss of containment cooling from the loss of power. At the time of this high drywell pressure signal, high pressure core spray pump and 2B residual heat removal [RHR] pump was already in operation, the low pressure core spray system and 2A residual heat removal system was secured and [placed] in pull to lock. When the signal was satisfied the ECCS [Emergency Core Cooling Systems] signal was processed but only the 2C RHR pump would have started. In this case, the 2C RHR pump tripped when the signal was received. There is no evidence of reactor coolant leakage. There was no additional ECCS systems discharging into the RCS [Reactor Coolant System]. As [initially stated], level was controlled using High Pressure Core Spray and level control is now being maintained using the Reactor Core Isolation Cooling [RCIC] systems. The 2C RHR pump trip is under investigation. Due to the initial loss of offsite power for both Unit 1 and Unit 2 reported at 1511 [CDT], multiple containment isolation valves isolated and closed as expected. Once initial containment isolations were verified, two Unit 2 primary containment vent and purge valves were opened to vent the Unit 2 containment. Once Unit Two containment pressure reached 1.77 [psig], these two vent valves isolated as expected. Due to the loss of offsite power, the Station Vent Stack Wide Range Gas Monitor (WRGM) and the Standby Gas Treatment Wide Range Gas Monitor (VGWRGM) also lost power. Manual sampling has been implemented and power is restored to the VGWRGM, however the VGWRGM has not been declared operable yet. Normal radiation levels have been reported from the manual sampling. [This is being reported in accordance with 10CFR50.72(b)(3)(xiii).] The licensee notified the NRC Resident Inspector and the State of Illinois. Notified the R3 IRC, NRR EO(Skeen), IRD MOC (Grant).
After the Unit 2 primary containment vent and purge system isolated on the Unit 2 containment High Pressure signal, Venting of the Unit 1 primary containment was commenced. At 2005 CDT, Unit 1 primary containment pressure reached the Group 2 primary containment isolation system setpoint (1.77 PSIG) causing the primary containment vent and purge valves being used to vent the Unit 1 containment to isolate. Unit 1 primary containment venting was being performed through the Standby Gas Treatment system which is a filtered system. In addition to the primary containment isolation signal on high drywell pressure, an ECCS initiation on high drywell pressure also occurred. The ECCS signal resulted in an auto start of the 1C RHR system. The 1B RHR system was already running in suppression pool cooling mode. 1A RHR and LPCS had been secured to prevent overloading the common diesel generator for division 1. The common diesel generator supplies both Unit 1 and Unit 2 division 1 ESF busses. The licensee informed the NRC Resident Inspector. Notified NRR EO (Skeen), IRD MOC (Grant) and R3IRC (Louden).
LaSalle has terminated the unusual event which was initiated at 1511 on 4/17/13 and reported under EN 48939. This unusual event has been terminated based on meeting the following established criteria. This report is being made in accordance with 10CFR50.72.(c)(1)(iii). 1) Off-site power has been restored to all ESF busses 2) Fuel Pool Cooling has been restored on both units 3) Primary Containment Chillers have been restored on both units 4) Drywell pressure is less than ECCS initiation setpoint 5) ECCS signals cleared to allow diesels to be placed in stand by Recovery of remaining plant systems will be managed through the Outage Control Center (OCC)." The licensee informed the NRC Resident Inspector. Notified R3DO (Orth), NRR EO (Chernoff), IRD (Grant), DHS, FEMA, USDA, HHS, DOE, NICC, EPA, and Nuclear SSA via email.
In addition to the 10 CFR 50.72 Sections initially identified, the Loss of Offsite Power was also reportable under 10 CFR 50.72(b)(3)(v)(D) as an event or condition that could have prevented the fulfillment of the safety function of systems needed mitigate the consequences of an accident. This event is considered a safety system functional failure for both Units 1 and 2. The licensee will notify the NRC Resident Inspector. Notified the R3DO (Orth). |
Where | |
---|---|
Lasalle Illinois (NRC Region 3) | |
Reporting | |
Emergency class: | Unusual Event |
10 CFR 50.72(a) (1) (i), Emergency Class Declaration 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge 10 CFR 50.72(b)(2)(iv)(B), RPS Actuation 10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
LER: | 05000373/LER-2013-002 |
Time - Person (Reporting Time:+-3.2 h-0.133 days <br />-0.019 weeks <br />-0.00438 months <br />) | |
Opened: | Dan Szumski 16:59 Apr 17, 2013 |
NRC Officer: | Dong Park |
Last Updated: | Apr 21, 2013 |
48939 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 48939\u003C/a\u003E - \u003Ca href=\"/LaSalle\" title=\"LaSalle\"\u003ELaSalle\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003ENotification of Unusual Event Declared Due to Loss of Offsite Power from a Lightning Strike\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 48939 - LaSalle\n","link":"","lat":41.24573888888889,"lon":-88.66919444444444,"icon":"/w/images/b/be/Constellation_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | A/R |
Before | Power Operation (100 %) |
After | Hot Shutdown (0 %) |
Unit 2 | |
---|---|
Reactor critical | Critical |
Scram | A/R |
Before | Power Operation (100 %) |
After | Hot Shutdown (0 %) |
LaSalle with 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge | |
WEEKMONTHYEARENS 570832024-04-20T12:04:00020 April 2024 12:04:00
[Table view]10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Actuation of Emergency Diesel Generators ENS 563892023-03-04T15:10:0004 March 2023 15:10:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Actuation of Reactor Protection System (RPS) ENS 561202022-09-26T07:38:00026 September 2022 07:38:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Trip Due to Reported Fire on Isophase Bus Duct ENS 539032019-03-01T04:17:0001 March 2019 04:17:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Specified System Actuation - Trip of Safety Related Bus ENS 535762018-08-31T05:00:00031 August 2018 05:00:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Scram Due to Main Condenser Degradation ENS 525642017-02-18T05:53:00018 February 2017 05:53:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram Resulting from Feedwater Regulating Valve Failure ENS 525472017-02-14T05:09:00014 February 2017 05:09:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Unit 1 Automatic Reactor Scram Due to Main Generator Trip on Differential Current ENS 525052017-01-23T14:06:00023 January 2017 14:06:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Scram Due to Stator Water Cooling Runback Signal and Turbine Bypass Valve Opening ENS 503982014-08-25T13:12:00025 August 2014 13:12:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Unusual Event Declared Due Fire Alarm in Reactor Building ENS 503462014-08-05T22:34:0005 August 2014 22:34:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Scram ENS 489692013-04-26T01:19:00026 April 2013 01:19:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Scram Following Trip of Circ Water Pumps ENS 489392013-04-17T20:11:00017 April 2013 20:11:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Notification of Unusual Event Declared Due to Loss of Offsite Power from a Lightning Strike ENS 465822011-02-02T01:18:0002 February 2011 01:18:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Reactor Scram After a Main Transformer Trip ENS 452652009-08-15T21:06:00015 August 2009 21:06:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram Due to a Turbine Trip ENS 450872009-05-21T21:35:00021 May 2009 21:35:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Rps Actuation (Scram) Due to a Main Power Transformer Fault ENS 423482006-02-20T06:23:00020 February 2006 06:23:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition, 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Site Area Emergency - Reactor Scram ENS 417872005-06-22T04:40:00022 June 2005 04:40:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Multiple Specified Systems Actuations Due to Loss of Ac Safety Related Buses ENS 408452004-06-28T06:21:00028 June 2004 06:21:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Unusual Event Declared Due to Earthquake Registered on Site Seismic Monitors ENS 404952004-02-02T04:34:0002 February 2004 04:34:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation One Half Scram Signal Due to the Loss of the "B" Reactor Protection System Bus. ENS 403572003-11-27T06:52:00027 November 2003 06:52:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Reactor Manually Scrammed from 23% Due to Decreasing Reactor Vessel Water Level 2024-04-20T12:04:00 | |