ENS 52564
ENS Event | |
---|---|
05:53 Feb 18, 2017 | |
Title | Automatic Reactor Scram Resulting from Feedwater Regulating Valve Failure |
Event Description | This notification is being provided in accordance with 10CFR 50.72(b)(2)(iv)(B).
On February 17, 2017 at 2353 CST, Unit 1 Reactor Automatic Scram signal was received due to Turbine Control Valves Fast Closure. The turbine trip was due to receipt of Level 8 Trip due to a failure of the Feedwater Regulating Valve to Full open. Plant is in a stable condition with reactor pressure being maintained by the Turbine Bypass valves. Reactor water level is being controlled with Feedwater thru the Low Flow Feedwater Regulating Valve. Further investigation into the cause of the event is in progress. All control rods fully inserted, and decay heat is being removed via steam to the main condenser using bypass valves. The licensee has notified the NRC Resident Inspector.
Upon further review of the event data, it was determined that the Nuclear Station Operator (NSO) had initiated a manual scram, which was followed by a Turbine Control Valve (TCV) fast closure automatic scram when the turbine tripped. The licensee has notified the NRC Resident Inspector. Notified R3DO (Jeffers). |
Where | |
---|---|
Lasalle Illinois (NRC Region 3) | |
Reporting | |
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation | |
Time - Person (Reporting Time:+-2.92 h-0.122 days <br />-0.0174 weeks <br />-0.004 months <br />) | |
Opened: | Wayne Clayton 02:58 Feb 18, 2017 |
NRC Officer: | Dong Park |
Last Updated: | Apr 14, 2017 |
52564 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 52564\u003C/a\u003E - \u003Ca href=\"/LaSalle\" title=\"LaSalle\"\u003ELaSalle\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EAutomatic Reactor Scram Resulting from Feedwater Regulating Valve Failure\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 52564 - LaSalle\n","link":"","lat":41.24573888888889,"lon":-88.66919444444444,"icon":"/w/images/b/be/Constellation_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | Yes, Manual Scram |
Before | Power Operation (30 %) |
After | Hot Shutdown (0 %) |
WEEKMONTHYEARENS 561202022-09-26T07:38:00026 September 2022 07:38:00
[Table view]10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Trip Due to Reported Fire on Isophase Bus Duct ENS 535762018-08-31T05:00:00031 August 2018 05:00:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Scram Due to Main Condenser Degradation ENS 525642017-02-18T05:53:00018 February 2017 05:53:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram Resulting from Feedwater Regulating Valve Failure ENS 525472017-02-14T05:09:00014 February 2017 05:09:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Unit 1 Automatic Reactor Scram Due to Main Generator Trip on Differential Current ENS 525052017-01-23T14:06:00023 January 2017 14:06:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Scram Due to Stator Water Cooling Runback Signal and Turbine Bypass Valve Opening ENS 503462014-08-05T22:34:0005 August 2014 22:34:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Scram ENS 489692013-04-26T01:19:00026 April 2013 01:19:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Scram Following Trip of Circ Water Pumps ENS 489392013-04-17T20:11:00017 April 2013 20:11:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Notification of Unusual Event Declared Due to Loss of Offsite Power from a Lightning Strike ENS 465822011-02-02T01:18:0002 February 2011 01:18:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Reactor Scram After a Main Transformer Trip ENS 452652009-08-15T21:06:00015 August 2009 21:06:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram Due to a Turbine Trip ENS 450872009-05-21T21:35:00021 May 2009 21:35:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Rps Actuation (Scram) Due to a Main Power Transformer Fault ENS 423482006-02-20T06:23:00020 February 2006 06:23:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition, 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Site Area Emergency - Reactor Scram ENS 403572003-11-27T06:52:00027 November 2003 06:52:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Reactor Manually Scrammed from 23% Due to Decreasing Reactor Vessel Water Level 2022-09-26T07:38:00 | |